Request for Proposals No. 2598263 
Carrying out overhaul repairs (CWR) of the electric bridge crane TsGE, section 8, workshop No. 10, reg. No. 22485 / P Inv. No. 1274 JSC "EPM-NEZ"

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:19.03.2021 16:00
Last edited:05.03.2021 09:13
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:within 30 calendar days after the signing of the acceptance certificates for the work performed
Delivery terms:1. Application of JSC EPM-Novocherkassk Electrode Plant "
2. Place of work:
Territory of the Contractor and EPM-NEZ JSC (TsGE). 3. Content of work:
3.1 Carrying out overhaul repairs of electric bridge cranes
according to the developed design documentation from the material of the Contractor:
• TsGE section 8 of shop No. 10 reg. No. 22485 / P inv. No. 1274
4. Brief technical description: Electric bridge cranes for special purposes. Designed for lifting and transporting operations and moving goods.
5. Purpose of work: Restoration of working characteristics of cranes for their further operation.
6. Requirements for the performer:
• The contractor must have the necessary production and human resources to carry out this work
• Work performance under the possible impact of harmful production factors: dustiness, gas pollution, noise
• Performing work in the cramped conditions of an existing enterprise (workshop),
the enterprise operates around the clock
• Before issuing a work permit for work, the Contractor must provide the Customer with the following documents:
- copy of the certificate (SRO) for the right to perform this type of work; - copies of documents confirming the presence of a labor protection service and / or a labor protection specialist in a contractor (order for appointment to a position in a contractor, a certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services;
- a copy of the instruction on labor protection from the instruction log;
- POR or PPR or RTI;
- copy of the protocol of certification of workers for labor protection;
- copies of certificates of attestation of engineers and technicians for labor protection and general industrial safety requirements. When performing work on gas, on vessels operating under pressure, using PMG, in electrical installations, during hot work - copies of certificates for each type of work;
- medical clearance of personnel;
- copies of certificates of gas-electric welders, slingers, crane drivers, hoists (towers). For gas-electric welders, copies of the certification protocols for PTM.
In case of revealing inconsistencies of the information in the submitted documents with the requirements of regulatory legal acts, the Customer has the right to initiate an audit by the Health and Safety Service in matters of Labor Protection and Industrial Safety in the Contractor's organization. The Contractor notifies the Customer about the fulfillment of all the specified conditions in writing with the attachment of all supporting documents. Failure to comply with the terms of this clause by the Contractor gives the Customer the right to prevent the Contractor from performing the work, the delay in the execution of the work in this case is the Contractor's fault.
7. Terms of work:
It is agreed with the Customer.
8. Terms of payment: Payment within 30 calendar days after signing the acceptance certificates for the work performed.
9. Attached documentation:
Design documentation.
Georeferencing:Russia, Rostov region,
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Tax registration certificate.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with the tax authority's mark of acceptance.
6. Documents confirming the authority of the representative to sign documents:
- Decision (Protocol).
- Power of attorney.
7. Work proposal (see the file "Work proposal") 8. Contact person: Marty Shchenko Oleg Mikhailovich - chief mechanic, phone 8 86352-9-48-24 e-mail: Martischenko@energoprom.ru,
9. Certificate of conformity to the requirements of ISO 9001: 2008 (if any) This request is not a notification of a tender or auction and does not give any rights to participants, does not entail any obligations other than those expressly specified in the notification.
10. Requirements for the performer:
Before issuing a work permit for work, the Contractor must provide the Customer with the following documents:
- copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming the presence of a labor protection service and / or a labor protection specialist in a contractor (order for appointment to a position in a contractor, a certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services;
- a copy of the instruction on labor protection from the instruction log;
- POR or PPR or RTI;
- copy of the protocol of certification of workers for labor protection;
- copies of certificates of attestation of engineers and technicians for labor protection and general industrial safety requirements. When performing work on gas, on vessels operating under pressure, using PMG, in electrical installations, during hot work - copies of certificates for each type of work;
- medical clearance of personnel - copies of certificates of gas-electric welders, slingers, crane drivers, hoists (towers). For gas-electric welders, copies of the certification protocols for PTM.
In case of revealing inconsistencies of the information in the submitted documents with the requirements of regulatory legal acts, the Customer has the right to initiate an audit by the Health and Safety Service in matters of Labor Protection and Industrial Safety in the Contractor's organization.
The Contractor notifies the Customer about the fulfillment of all the specified conditions in writing with the attachment of all supporting documents. Failure to comply with the terms of this clause by the Contractor gives the Customer the right to prevent the Contractor from performing the work, the delay in the execution of the work in this case is the Contractor's fault.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Мартыщенко Олег Михайлович - главный механик. Тел.: 8 8635 29-48-24 e-mail: OMartischenko@energoprom.ru
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 15.07.2021 at 13:22
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 1. More >>