Request for Proposals No. 2650098 
Dismantling of the inoperative equipment of the SPC-2 JSC "EPM-NEZ"

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Dismantling of the inoperative equipment of the SPC-2 JSC "EPM-NEZ"
See TK (Complex service)

OKPD2 category:
Quantity:1 комплект
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:14.05.2021 17:00
Last edited:27.04.2021 07:54
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:100% upon completion of work
Delivery terms:1. Application of JSC "EPM-NEZ"
2. Place of work: Customer's territory (JSC "EPM-NEZ" SPC-2).
3. Scope of work:
3.1. Dismantling - inclined skip hoists of the presses with a capacity of 2200 tn and a mustache. 3150 tn - with cutting and scrapping:
3.2. Dismantling - mixer SMB 2000 with auger and press kubel with 2200 tn capacity:
3.3. Dismantling - press PO09 (us. 2200 tn):
3.4. Dismantling of two mixing machines SMB 2000 from level 3.6 - with cutting and removal to scrap metal:
3.5. Dismantling - mixer Anode 4 with a screw for feeding material to a press with a capacity of 3150 tn
3.6. Dismantling of the roller table of the press mustache. 3150 tn, with press feeders
PS: Approximate equipment weight 278.201 tonnes
4. Dismantling purpose:
Disposal of obsolete, inoperative equipment at TWS 2.
5. Payment terms: 100% upon completion of the work.
6. Requirements for the Contractor when dismantling the equipment:
6.1. The contractor must have the necessary production and human resources for
performing this work, be a member of a self-regulatory organization. Have
certification of the manager, engineers and workers in industrial safety and availability
medical clearance.
6.2. Before the start of work, the contractor develops the PPR and agrees with the customer.
6.3. Accommodation of workers engaged in the performance of dismantling, installation and commissioning
works are performed by the Contractor.
6.4. Availability of hoisting machines, transport equipment, traction devices,
devices, mechanisms, slings, ropes and necessary tools.
6.5. Electric welding, gas-cutting equipment and consumables for them
provided by the Contractor.
6.6. Performance of work with possible exposure to harmful production factors:
dustiness, gas pollution, noise.
6.7. Work in the cramped conditions of an operating enterprise (workshop). The enterprise operates around the clock.
6.8. Before issuing a work permit for the production of work, the Contractor is obliged to provide
For the customer the following documents:
- copy of the certificate (SRO) for the right to perform this type of work; - copies of documents confirming the availability of a labor protection service and / or a labor protection specialist in the contractor (order on appointment to a position in the
organizations, certificate of a labor protection specialist) or the presence of an agreement with an accredited organization in the field of labor protection services;
- a copy of the instruction on labor protection from the instruction log;
- POR or PPR or RTI;
- copy of the protocol of certification of workers for labor protection;
- copies of certificates of attestation of engineers and technicians for labor protection and general industrial requirements
security. When performing work on gas, on vessels operating under pressure, with
using PMG, in electrical installations, hot work - copies of certificates for each type of work; - medical clearance of personnel; - copies of certificates of gas-electric welders, slingers, crane drivers, hoists (towers). For gas-electric welders, copies of the certification protocols for PTM.
In case of revealing inconsistencies of the information in the submitted documents with the requirements of regulatory legal acts, the Customer has the right to initiate an audit by the Health and Safety Service in matters of Labor Protection and Industrial Safety in the Contractor's organization.
The Contractor notifies the Customer about the fulfillment of all the specified conditions in writing with the attachment of all supporting documents. Failure to comply with the terms of this clause by the Contractor gives the Customer the right to prevent the Contractor from performing the work, the delay in the execution of the work in this case is the Contractor's fault.
7. Term of work performance:
The term of the work is agreed with the Customer - additionally.
Georeferencing:Rostov region, Novocherkassk, Aluminum pl-ka
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Tax registration certificate.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with the tax authority's mark of acceptance.
6. Documents confirming the authority of the representative to sign documents:
- Decision (Protocol).
- Power of attorney.
7. Work proposal (see the file "Work proposal")
8. Contact person: Martyschenko Oleg Mikhailovich - Chief Mechanic. Tel. 8 (8635) 29-48-24, fax 8 (8635) 29-42-55, e-mail: OMartischenko@energoprom.ru
9. Certificate of compliance with the requirements of ISO 9001: 2008 (if available)
This request is not a notification of a tender or auction and does not give any rights to participants, does not entail the emergence of any obligations other than those expressly indicated in the notification.
10. Requirements for the performer:
- copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming the presence of a labor protection service and / or a labor protection specialist in a contractor (order for appointment to a position in a contractor, a certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services;
- a copy of the instruction on labor protection from the instruction log;
- POR or PPR or RTI;
- copy of the protocol of certification of workers for labor protection;
- copies of certificates of attestation of engineers and technicians for labor protection and general industrial safety requirements. When performing work on gas, on vessels operating under pressure, using PMG, in electrical installations, during hot work - copies of certificates for each type of work;
- medical clearance of personnel;
- copies of certificates of gas electric welders, slingers, crane drivers, hoists (towers). For gas electric welders, copies of certification protocols for PTM. In case of revealing inconsistencies of the information in the submitted documents with the requirements of regulatory legal acts, the Customer has the right to initiate an audit by the Health and Safety Service in matters of Labor Protection and Industrial Safety in the Contractor's organization. The Contractor notifies the Customer about the fulfillment of all the specified conditions in writing with the attachment of all supporting documents. Failure to comply with the terms of this clause by the Contractor gives the Customer the right to prevent the Contractor from performing the work, the delay in the execution of the work in this case is the Contractor's fault. Also, all employees of the contractor are required to undergo an introductory briefing from the Customer's specialists (you must have a document confirming your identity and age with you). When carrying out work under a permit-permit, all Contractor's employees must have certified overalls, footwear and other personal protective equipment necessary to perform this type of work.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Мартыщенко Олег Михайлович - Главный механик.
Тел. 8 (8635)29-48-24, факс 8 (8635)29-42-55, e-mail: OMartischenko@energoprom.ru
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 11.06.2021 at 13:24
and selected the winner: \"DON\" OOO – (Bidder 4) (Скобкарев Д.А.) submitting a bid dated of 14.05.2021 14:03 totalling to 3 445 000,00 RUB (VAT free)
Notifications have been sent to bidders.
Total bids: 8. More >>