Request for Proposals No. 998354 
work on diagnostics of transformers, with the definition of residual service life JSC "EPM-NJeZ" in the year 2018.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

work on diagnostics of transformers, with the definition of residual service life
JSC "EPM-NJeZ" in the year 2018.
, see technical specification (Complex service)

Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:19.04.2018 17:00
Last edited:05.04.2018 18:24
Bidding cancellation date:13.04.2018 10:38
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:in the offer
Delivery terms:1. Application of OJSC "EPM-NJeZ", Novocherkassk
11. The purpose of the work
Diagnostics of transformers in service at OJSC "EPM-NJeZ" for status monitoring and forecasting residual resource of work of transformers and of forecasting the reliability of power supply equipment of JSC "EPM-NJeZ". Based on the analysis of the data obtained when diagnosing transformers, development and implementation of the program of modernization and replacement of transformers, JSC "EPM-NJeZ" after your lifetime.

12. Term of execution of works

Commencement of work May 1, 2018
End of October 31, 2018 works execution



Furnace transformers supplying the graphitization shop furnaces (HRS) have cyclical operation mode. Work on the diagnosis of furnace transformers HRS can be made only during the breaks in the work of technology companies of furnace no. 1, sections 2, 8, 10 HRS. Timetable of technology companies furnace no. 1, sections 2, 8, 10 HRS shall be drawn up in advance for the month up to 25 the number of the previous month. Power transformers are installed in substations of OJSC "EPM-NJeZ", with the possibility of partitioning (two or three transformer stations) can appear to produce works on the diagnosis without stopping and interrupting technology equipment. One transformer substations will be working within a timeframe to be agreed upon with the production Department of OJSC "EPM-NJeZ»

13. The content of works on repair

13.1. Diagnose transformers without violating health transformers OJSC EPM-NJeZ ". (For example: Evaluation of aging paper insulation to hold indirect methods: 1. Evaluation of the degree of insulation ageing on content of furfurol. 2. Insulation condition assessment method of the dielectric absorption.
Rated service life of electromagnetic system: 1. Current measurement and idling losses at low voltage. You can use other methods without violating health transformers OJSC EPM-NJeZ ") list of transformers provided in table no. 1.
13.2. Perform the necessary testing and measurement transformers and provide protocols.
13.3. On the basis of Diagnostics provide a report which will contain the index aging transformers OJSC EPM-NJeZ and prediction of residual service life.
4.5. A technical examination of transformers OJSC EPM-NJeZ ", in accordance with article 1.6.7. "Rules of technical operation of electrical consumers», approved. by order of the Ministry of energy of Russia, 13.01.2003. No. 6 and give acts.

14. Technical characteristics of TK
15. Executive requirements

5.1. Artist must have the necessary production and human resources
to perform this work.
5.3. Performer in its commercial offer specifies the order of payment works
and other conditions.
5.4. Certification Manager, ENGINEERS and performers in industrial safety and
labour protection in accordance with Annex 1 of the GCO.
5.5. Ensuring the health and safety measures, safe methods of work on the project.
5.6. After the completion of the executor passes the customer Executive
documentation in accordance with Rd-11-02-2006 from 26.12.06 g. and other normative
documents.
Workers contracted to perform work for diagnosing transformers must have training appropriate to the nature of the execution of works with a mark in a special certificate of completion of training and examinations in attestation commissions.
16. Safety production work

By manufacture of works on diagnostics of transformers entrepreneurial organization must comply with the following rules:
- rules on a labour safety in the operation of electroinstallations;
- rules of technical operation of electroinstallations of consumers;
- rules on the safety of hazardous production facilities, which
use lifting facilities;
- Regulation device of electroinstallations;
- fire safety rules;
- regulations on labor protection when working at height SWEAT RM-012-200;
- the rules of environmental, sanitary and other regulations in force in the territory of the Russian Federation and ensure safe working conditions for the life and health of people.
For production work organisation should undergo induction training. All work performed on the territory of JSC "EPM-NJeZ" should be conducted according to the regulations on the use of orders of tolerances in the production of works of increased danger at EPM-NJeZ ".
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Participant who has submitted a bid before bids submission deadline shall upload the following documents:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for execution of works (see file "work Proposal")
8. Contact person: Roman Viktorovich Dinkov, head of energy management-
Chief power engineer.
Phone 8 86352-94570
Fax 8 86352-9-41-83
9. Certificate of conformity to requirements of standard ISO 9001: 2008 (if available)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Executive requirements:
-Permits (CPO, licenses, tolerances).
— Development of PPR, Executive LEAD, RTI.
— Availability of certification Manager, ENGINEERS, working on industrial safety to GCO.
— The availability of medical staff work at the tolerance of GCO.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.

Organizer has decided to cancel the call for bids.
Call for bids cancellation date: 13.04.2018 at 10:38.
call for bids cancellation reason:

Ошибочно размещено 2 лота на одну работу.
Вынуждены один лот удалить.

Signed with e-signature
Total bids: 1. More >>