Request for Proposals No. 2776205 
Manufacturing and installation of pellet pec production unit at the furnace warehouse No.3 in SPC-2 of EPM-NEZ JSC

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 комплект
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:04.10.2021 16:00
Last edited:20.09.2021 14:23
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:The contractor indicates in the offer
Delivery terms:1. EPM-NEZ JSC Application
2. Place of work:
The territory of the Performer and EPM-NEZ JSC Pake Warehouse No. 3 in SPC-2.
3. Title of works:
3.1. Manufacturing, installing and strapping the furnace according to
with project: Drawing No. NS13963; Drawing No. ST13963; Drawing No. TH13963; Drawing No. TS010.13963.
PS: The works are made entirely of the Artist's materials 4. The purpose of the works:
Involvement in the production of pelleted pecs in the territory of storehouse No. 3 in SPC-2.
5. Documentation:
Drawings are attached:
5.1 Drawing No. NS13963;
5.2 Drawing No. ST13963;
5.3 Drawing No. TH13963;
5.4 Drawing #TS010.13963.
6. Performer Requirement:
• The contractor must have the necessary production and human resources to carry out the job.
• Work under possible exposure to harmful production factors: dust, gas, noise;
• Work in the tight conditions of the working workshop;
• Prior to issuing a work permit, the Contractor must provide the Customer with the following documents:
- copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming that the contractor has an occupational health service and/or occupational safety specialist (appointment order in the contracting organization, certificate occupational safety specialist) or having a contract with an accredited organization in the field of occupational safety services;
- a copy of the occupational health briefing from the Instructions Journal
- ERP or PPR or RTI;
- a copy of the workers' certification report on occupational safety;
- Copies of ITR certification certificates for occupational health and general industrial safety requirements;
- medical clearance of staff.
The Contractor shall notify the Customer in writing of all these conditions, with all supporting documents attached. The Contractor's failure to comply with the conditions of this paragraph entitles the Customer to prevent the Contractor from carrying out the work, the failure to perform the work in such case is the Contractor's fault.
7. Deadlines:
Agreed with Customer 8.Payment Terms:
The contractor of the work indicates in the offer.
9. Warranty:
The Contractor provides the Customer with a guarantee for the works
not less than 12 months from the commissioning of the equipment.
Georeferencing:Rostov region, Novocherkassk, Aluminum pl-ka
Comments:
The participant who participated in the procedure (who made the offer) must upload the following documents to the system before the deadline for applications:
- ESTIMATE
1. Charter (with all additions and changes, if there were any).
2. Certificate of State Registration.
3. Tax Registration Certificate.
4. Extract from the EGRUL.
5. Balance sheet as of the last reporting date with tax authority acceptance mark.
6. Documents confirming the authority of the representative to sign documents:
— Solution (Protocol).
- Power of Attorney.
7. Proposal for work (see Proposal for Work file)
8. Contact person: Oleg Martyshchenko - Chief Mechanic. Tel 8 (8635) 29-48-24, fax 8 (8635) 29-42-55, e-mail: OMartischenko@energoprom.ru
9. ISO 9001:2008 Certificate of Compliance (if available)
This request does not constitute a notice of competition or auction and does not confer any rights to the participants, does not entail any obligations other than those expressly stated in the notice.
10. Executor Requirements:
—copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming that the contractor has an occupational health service and/or occupational safety specialist (appointment order in the contracting organization, certificate occupational safety specialist) or having a contract with an accredited organization in the field of occupational safety services;
- a copy of the occupational health briefing from the Instructions Journal
- ERP or PPR or RTI;
- a copy of the workers' certification report on occupational safety;
- copies of ITR certification certificates for occupational health and general industrial safety requirements. When performing gas work, pressure receptacles using GPM, electrical installations, fire works — copies of certificates for each type of work;
- medical clearance of staff;
- copies of the certificates of gas-electric welders, slingers, cranes, hoists (towers). For gas-electric welders, copies of PTM certification reports. In the event that the information in the submitted documents is found to be inconsistent with the requirements of the regulations and regulations, the Client may initiate an audit by the OT and PB service regarding occupational safety and safety and safety and safety Industrial safety in the Contractor's organization. The Contractor shall notify the Customer in writing of all these conditions, with all supporting documents attached. The Contractor's failure to comply with the conditions of this paragraph entitles the Customer to prevent the Contractor from carrying out the work, the failure to perform the work in such case is the Contractor's fault. In addition, all employees of the contracting organization are required to undergo an induction briefing with the Client's specialists (carry a document confirming their identity and age). All Contractor employees must be in possession of certified workwear, footwear and other personal protective equipment required to perform this type of work when performing the work permit.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Мартыщенко Олег Михайлович - Главный механик.
Тел. 8 (8635)29-48-24, факс 8 (8635)29-42-55, e-mail: OMartischenko@energoprom.ru
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 0