Request for Proposals No. 2839586 
Conducting works on the manufacture and installation of an installation to involve granulated pitch in the production of granulated peck in the territory of the Pitch Warehouse No. 3 in SPTS-2 of EPM-NEZ JSC

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 комплект
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:21.12.2021 16:00
Last edited:14.12.2021 14:08
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:The contractor indicates in his quotation
Delivery terms:1. The application of EPM-NEZ JSC
2. Work place:
The territory of the Contractor and EPM-NEZ JSC is a peck warehouse No. 3 in SPC-2.
3. Work name:
3.1. Production of works on the manufacture, installation and piping of the furnace in accordance with
with the project: Drawing No. HC13963; Drawing №ST13963; Drawing №TX13963; Drawing №TS010.13963.
PS: The works are made entirely from the materials of the Contractor 4. The purpose of the work:
Involvement in the production of granulated pitches in the territory of the Pitch Warehouse No. 3 in SPC-2.
5. Documentation:
Drawings are attached:
5.1 Drawing No. NS13963;
5.2 Drawing №ST13963;
5.3 Drawing №TH13963;
5.4 Drawing №TS010.13963.
6. Requirement for the performer:
• The contractor must have the necessary production and human resources to perform this work.
• Production of works with possible exposure to harmful production factors: dust content, gas contamination, noise;
• Work in the congusted conditions of the existing workshop;
• Before issuing a work permit, the Contractor must provide the Customer with the following documents:
- a copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming the presence of an occupational safety service and/or an occupational safety specialist in the contractor (order for appointment to a position in a contractor, certificate labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services;
- a copy of the occupational safety briefing from the briefing log;
- POR or PPR or RTI;
- a copy of the workers' labor protection certification protocol;
- copies of certificates of certification of engineers on labor protection and general requirements of industrial safety;
- medical clearance of personnel.
The Contractor shall notify the Customer of the fulfillment of all these conditions in writing with all supporting documents attached. Failure to comply with the terms of this clause by the Contractor entitles the Customer to prevent the Contractor from performing the work, the delay in performing the work in this case is the Contractor's fault.
7. Deadlines for the work:
To be agreed with the Customer 8.Payment terms:
The contractor indicates the work in his quotation.
9. Warranty:
The Contractor provides the Customer with a guarantee for the work performed
at least 12 months from the date of commissioning of the equipment.
Georeferencing:Rostov region, Novocherkassk, Aluminum pl-ka
Comments:
The participant who took part in the procedure (who made an offer) must upload the following documents to the system before the deadline for accepting applications:
1. ESTIMATE CALCULATION (without it the TKP is not considered)
2. Charter (with all additions and changes, if any).
3. Certificate of state registration.
4. Tax registration certificate.
5. Extract from the Unified State Register of Legal Entities
6. The balance sheet as of the last reporting date with the tax authority's note on acceptance.
7. Documents confirming the representative's authority to sign documents:
— Decision (Protocol).
— Power of Attorney.
8. Job Quotation (See Job Quotation File)
9. Certificate of Compliance with ISO 9001:2008 (if any)
This request does not constitute a notice of a tender or auction and does not give any rights to participants, and does not entail any obligations other than those expressly stated in the notice.
10. Requirements for the performer:
—copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming the presence of an occupational safety service and/or an occupational safety specialist in the contractor (order for appointment to a position in a contractor, certificate labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services;
- a copy of the occupational safety briefing from the briefing log;
- POR or PPR or RTI;
- a copy of the workers' labor protection certification protocol;
- copies of certificates of certification of engineers on labor protection and general requirements of industrial safety. When performing work on gas, on pressure vessels, using GPM, in electrical installations, hot work — copies of certificates for each type of work;
- medical clearance of personnel;
- copies of certificates of gas electric welders, slingers, crane drivers, hoists (towers). Copies of PTM certification protocols for gas-electric welders. In case of any discrepancies in the information in the submitted documents with the requirements of regulatory legal acts, the Customer has the right to initiate an audit by the Health and Safety Service in matters of labor protection and safety Industrial safety in the Contractor's organization. The Contractor shall notify the Customer of the fulfillment of all these conditions in writing with all supporting documents attached. Failure to comply with the terms of this clause by the Contractor entitles the Customer to prevent the Contractor from performing the work, the delay in performing the work in this case is the Contractor's fault. Also, all employees of the contractor are required to undergo an introductory briefing from the Customer's specialists (they must have a document confirming their identity and age with them). All Contractor employees must wear certified protective clothing, footwear and other personal protective equipment required to perform the work permit.
The head of the contractor is obliged, prior to the commencement of work under the contract, to submit an appeal (in duplicate) containing a list of personnel by which work is expected to be performed under the contract. Copies of general civil passports and employment contracts (or civil law contracts) concluded with the persons specified in the appeal must be attached to this appeal. These copies of documents must be signed by the head of the contractor with a certified seal.
One copy of the submitted appeal together with the attached documents is sent to the Director of Security. The second copy of the application with the documents attached to it is sent to the head of the unit — the initiator of the conclusion of the contract.
In the absence of the contract organization specified in the first paragraph of this paragraph or the attached documents, as well as in the event of a discrepancy between the submitted list and the application the contractor for issuing passes, passes for employees of the specified organization are not issued. The delay in the performance of the work is attributed to the contractor. If there is a need to replace the employees specified in the appeal, the head of the contractor shall submit an updated list with the relevant documents attached to it.
Based on the results of work under the contract, the contractor, together with the KS-2 act, provides the customer (the head of the division — the initiator of the contract) copies of the SZV-M Form report" Information on Insured Persons" and a positive input control protocol on the transfer of this report to the territorial body of the Pension Fund of Russia, signed by EDS, for a period of time which is indicated in the report submitted by him in the KS-2 form.
In case of failure to provide SZV-M reports, or there is a discrepancy in the smaller direction of the number of contractor's employees specified in them, with the number specified in the appeal, KS-2 acts by the customer (head of the subdivisions - the initiator of the contract) are not signed, and the parties to the contract recognize the absence of the fact that the contractor has performed the work, the work under these acts is not subject to payment.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Мартыщенко Олег Михайлович - Главный механик.
Тел. 8 (8635)29-48-24, факс 8 (8635)29-42-55, e-mail: OMartischenko@energoprom.ru
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 29.12.2021 at 16:15
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 0