Request for Proposals No. 2958785 
Carrying out work on the manufacture of a stearin flow tank and electric heating of the pipeline and the stearin flow tank in the SEC site No. 2 at EPM-NEZ in 2022.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:14.04.2022 11:00 (was extended by 24 sec)
Last edited:11.04.2022 10:28
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:On the fact of the work performed or on the result of the tender commission.
Delivery terms:1 Application of JSC "EPM-NEZ", Novocherkassk
2. The purpose of the work:
The transition to electric stearin heating instead of steam.
To make a new stearin consumable tank according to the project "NS(TC.011).13066.01 Stearin consumable tank", to replace it instead of the existing one with the shortest downtime of the main equipment of the SPC. In the manufacture of a stearin fuel tank, take into account the project "EL 001.13952 SEC site No.2. A consumable tank for stearin. Electric heating".
Perform electric heating of the stearin fuel tank according to the project "EL 001.13952 SEC site No.2. A consumable tank for stearin. Electric heating" to improve the operation of the pressing equipment in the SEC site No. 2, from the material of the contractor organization at JSC "EPM-NEZ"

3. The deadline for the work
The beginning of the work on 31.01.2022
Completion of works on 30.05.2022
JSC "EPM-NEZ" is not interested in extending the term of work.
4. The content of the work
4.1 To make a new stearin flow tank according to the projects "NS(TC.011).13066.01 Stearin flow tank", "EL 001.13952 SEC site No.2. A consumable tank for stearin. Electric heating", from the contractor's material.
4.2 Perform work on dismantling the existing tank.
4.3 Perform electrical installation work on electric heating of a section of stearin pipeline with a length of 3 meters.
4.4 Perform electrical installation work on electric heating of the stearin fuel tank according to the project "EL 001.13952 SEC site No.2. A consumable tank for stearin. Electric heating" to improve the operation of the pressing equipment in the SEC site No. 2, from the material of the contracting organization.
4.5 Perform commissioning.
4.6 Lifting mechanisms for dismantling and installation, equipment, tools, mechanisms for loading and unloading are provided by the Contractor.
4.7 Vehicles for the removal of garbage, scrap metal or other waste are provided by the Contractor.
4.8 Electric welding, gas cutting equipment, consumables for them are provided by the Contractor.

5. Requirements for the Contractor
5.1. The Contractor must have the necessary production and human resources to perform this work.
5.2. The Contractor in his commercial offer specifies the order of payment for the work and other conditions.
5.3. Certification of the head, ITR and performers on industrial safety and labor protection at the OPO according to Appendix No. 1.
5.4. Ensuring measures of OT and PB, safe methods of work at the facility.
5.5. After completion of the work, the contractor submits to the customer the executive documentation and other regulatory documents. Employees involved in the performance of work must have professional training corresponding to the nature of the performance of work with a mark in a special certificate of completion of training and passing exams in attestation commissions.
5.6. The Contractor must arrive at JSC "EPM – NEZ" to get acquainted with the scope of work.

6. Work safety
When performing work, the contractor must comply with the requirements of the following rules:
- rules on labor protection during the operation of electrical installations;
- rules of technical operation of electrical installations of consumers;
- safety rules for hazardous production facilities where
lifting facilities are used;
- rules for the installation of electrical installations;
- rules of fire protection regime in the Russian Federation;
- rules for maintenance of relay protection devices and electrical automation of electrical networks 0,4-35 kV RD 153-34.3-35.613-00;
- rules on labor protection when working at height.
- rules of environmental, sanitary and hygienic and other norms in force on the territory of the Russian Federation and to ensure safe working conditions for the life and health of people.
For the production of works, the contractor must undergo an introductory briefing. All work performed on the territory of JSC "EPM-NEZ" must be carried out in accordance with the regulations "On the application of work permits in the production of high-risk work at JSC "EPM-NEZ".
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, is obliged to upload the following documents to the system:
1. The Charter (with all additions and amendments, if any).
2. Certificate of state registration.
3. Certificate of tax registration.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with a mark of the tax authority on acceptance.
6. Documents confirming the representative's authority to sign documents:
— Decision (Protocol).
— Power of attorney.
7. Job offer (see the file "Job Offer")
8. Contact persons:
Senior Engineer – Verbivsky Roman Vasilyevich
tel. 8(8635)29-49-29 RVerbivskiy@energoprom.ru
Master Konoplenko Vladimir Borisovich - 8(8635)29-41-42
9. Certificate of compliance with the requirements of ISO 9001:2008 (if available)
This request is not a notice of a tender or auction and does not give any rights to participants, does not entail any obligations other than those expressly specified in the notification.
10. Requirements for the contractor:
— Permits (SRO, licenses, permits).
— Development by the contractor of PPR, PPRK, RTI.
— Availability of certification of the head, ITR, workers on industrial safety at the OPO.
— Availability of medical access of personnel to work at the OPO.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Старший инженер – Вербивский Роман Васильевич
тел. 8(8635)29-49-29 RVerbivskiy@energoprom.ru
Мастер Конопленко Владимир Борисович - 8(8635)29-41-42
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 18.05.2022 at 12:40
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 2. More >>