Request for Proposals No. 1342063 
Overhaul of the furnace oil transformer with voltage regulation under load of the ЭОЦН 14000/35 kVA designed for work at EPM-NEZ JSC

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Overhaul of the furnace oil transformer with voltage regulation under load of the ЭОЦН 14000/35 kVA designed for work at EPM-NEZ JSC
See terms of reference (Complex service)

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:30.09.2019 10:30
Last edited:16.09.2019 10:23
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In a commercial offer
Delivery terms:1. Application of EPM-NEZ JSC, Novocherkassk
2. Purpose of work
Overhaul of the furnace oil transformer with voltage regulation under load of the ЭОЦН 14000/35 kVA designed for operation at EPM-NEZ JSC from the material of the contracting organization, hereinafter referred to as the transformer EOTsN 14000/35 kVA, logistics for the delivery of the transformer from the site of EPM- NEZ "to the repair site of the contractor and vice versa is performed by the Contractor.

3. Deadline
Start of work September 25, 2019
The completion of work is December 01, 2019.

4. Content of work on overhaul
4.1. Overhaul of the transformer EOTsN 14000/35 kVA is carried out in the amount of defective statements from the material of the Contractor.
4.2. Mechanisms, equipment, tools for dismantling, repairing and installing transformer equipment are provided by the Contractor.
4.3. Motor vehicles for garbage, scrap metal or other waste removal are provided by the Contractor.
4.5. Electric welding, gas cutting equipment, consumables are provided by the Contractor.
4.6. The transformer is moved from the installation site to the place of repair work (logistics) by the Contractor.

5. Transformer Specifications
Oil transformer with voltage regulation under load EOTsN 14000/35 kVA Indoor installation
Key Specifications Value
Rated power of a network winding, kVA 8000
Rated voltage of LV, V 240 ÷ 127
Rated current of NN, A 48200
Rated voltage of a network winding, V 35000
Rated current of a network winding, A 229
Designation of the scheme and group of connection of windings 1 / 1-0
Type of cooling
Weight, kg Full 27206
Active Parts 13500
Oils (without oil system and contactor) 8590 (contactor 250)

6. Requirements for the Contractor
5.1. The contractor must have the necessary production and human resources to perform this work, be a member of a self-regulatory organization (SRO).
5.2. To clarify the conditions for the performance of work, familiarization with the object, it is desirable that the representatives of the Contractor arrive at the Customer.
5.3. The contractor in his proposal indicates the payment procedure and other conditions.
5.4. Certification of the head, engineering and industrial and occupational safety and health at OSE in accordance with Appendix No. 1.
5.5. Provision of health and safety measures, safe methods of production work at the facility.
5.6. After completion of work, the contractor transfers to the customer the executive documentation in accordance with RD-11-02-2006 of 12.26.06. and other regulatory documents, test reports according to the list:
The list of tests and measurements during the overhaul of transformers without changing the windings.
1. Measurement of insulation resistance of transformer windings.
2. Measurement of insulation resistance of accessible tie rods, bandages, half-bandages with a jerk and pressing rings with respect to active steel and yoke beams.
3. Insulation test of accessible tie rods, bandages, half-bandages with a jerk and pressing rings with respect to active steel and yoke beams.
4. Measurement of resistance of windings to direct current, at all positions of transformer voltage regulation devices.
5. Checking the transformation ratio, at all positions of the transformer voltage regulation devices.
6. Measurement of transformer idle losses.
7. Transformer tank test for density.
8. Check and test gas relay.
9. Test transformer oil before putting the transformer into operation.
10. Check insulation resistance of built-in current transformers.
11. Testing built-in current transformers.
12. Determination of polarity of the terminals of the built-in current transformers.
13. Magnetization of built-in current transformers.
5.7. Guaranteeing at least 12 months.
Employees involved in the overhaul of the 14000/35 kVA EETsN transformer must have professional training corresponding to the nature of the work with a mark in the special certificate of training and exams in the certification commissions.



14. Work safety

When carrying out capital repairs of the transformer EOTsN 14000/35 kVA, the contractor must comply with the following rules:
- labor protection rules for the operation of electrical installations;
- rules for the technical operation of electrical installations of consumers;
- safety rules for hazardous production facilities that use lifting facilities;
- rules of electrical installations;
- fire regulations in the Russian Federation;
- labor protection rules when working at height;
- the rules of environmental, sanitary-hygienic and other norms in force in the territory of the Russian Federation and to ensure safe working conditions for human life and health.
To perform the work, the contractor must undergo an introductory briefing. All work performed on the territory of EPM-NEZ JSC must be carried out in accordance with the provision "On the use of tolerance orders in the work of increased danger at EPM-NEZ JSC".
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who participated in the procedure (made an offer), before the deadline for accepting applications, is obligated to upload the following documents to the system:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for work (see file "Proposal for work")
8. Contact persons:
Deputy Chief Power Engineer for Electrical - Fateev Vitaliy Valerevich
tel. 8 (8635) 29-44-83 VFateev@energoprom.ru
Leading engineer - Vorotintsev Alexander Nikolaevich
tel. 8 (8635) 29-43-94 AVorotyncev@energoprom.ru
9. Certificate of conformity to requirements of ISO 9001: 2008 (if available)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Requirements for the Contractor:
- Permitting documents (SRO, licenses, admissions).
- Development by the executor of PPR, PPRK, RTI.
- Availability of certification of the head, engineers, industrial safety workers at the public educational institution.
- The presence of medical admission of personnel to work on the public education.
—Before the execution of the work permit, the Contractor must provide the Customer with the following documents: copies of documents confirming the existence of a labor protection service and / or labor protection specialist in the contracting organization (order for appointment to the position in the contracting organization, certification of a labor protection specialist) or the existence of a contract with an accredited organization in the field of providing labor protection services.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 22.10.2019 at 09:35
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 1. More >>