Request for Proposals No. 1160352 
carrying out of works on inspection and restoration of devices of relay protection and automatics of Switchgears of 10 kv KP-11, KP-2, Furnace Aggregates 35 kv PA-8 at JSC "EPM-Nez" in the 2019 year

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:22.01.2019 19:07 (was extended by 2 h, 7 min, 16 sec)
Last edited:28.12.2018 11:23
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:on the fact of work performed
Delivery terms:1. Application of "EPM-Naz" JSC, Novocherkassk.
11. Purpose of work
Planned inspection of Relay protection devices (hereinafter referred to as Rzia) of outgoing lines, inlets, sectional oil breakers 10 kv and furnace Transformers 35 kv. High-voltage testing of cable lines of outgoing feeders. Works performed according to
RD 153-34.3-35.613-00.
12. Term of work performance

Commencement of works on April 01, 2019
Completion of works on November 30, 2019

Distribution devices of power supply JSC "EPM-nez" have a constant mode of operation. The possibility of disconnecting the outgoing lines, induction, sectional switches and furnace transformers is agreed with the customer the day before the work, to prepare the work place and transfer the load.
In case of failure of the 10 KV waste cable line as a result of high-voltage tests, the preparation and transfer of the load will be impossible during the repair of the cable line and restoration of the normal power supply circuit.
13. Maintenance of repair works
13.1. To check the current relays of the instantaneous action cutoff and the maximum current protection with independent time exposure; Measurement of insulation resistance by megomometer of operational, current circuits, signaling and voltage circuits; To check the transformation coefficient and to remove the curve of magnetizing current transformers; Check of intermediate, index relays; Time relay check; To measure the transient resistance and the own time of the oil or air switch; Measurement of the voltage of the elements of oil or air switch; Perform a primary current protection check.
13.2. To measure the insulation resistance of the windings of voltage transformers; Measurement of the transformation coefficient of voltage transformers; Check relay voltage, intermediate and index relays.
13.3. To test the insulation of power cable lines with elevated DC voltage.
13.4. In addition to these tests and measurements on the furnace Transformers PA-8 to inspect additional circuits of protection and blocking of the RPN, circuits of protection and blocking of BSK, fire protection of transformers, Chains of Locks "Ladder 1" and "Ladder 2", circuits Blocks of "RZ trolls", verification of gas relays of Transformers eocn14000/35, protection "overload T-1, T-2", defense "pressure in the RPn", Smoke and vibratory protection of furnace transformers PA-8. And also to perform the check of alarm circuits "disappearance of 100 V", "Gas T-1, T-2", "Oil pump Stop", excess of temperature and emergency increment of current on T-1, T-2 of furnace transformers eotn14000/35 PA-8.
13.5. On the basis of a complex of preventive restoration measures and inspections of the devices of the Rfor provide verification protocols of Rzia, protocols of high-voltage tests of cable lines and defective statements on the revealed remarks.
13.6. The Protocols of inspections and tests provide technical reports for each
RU-10 KV and PA-8, separately.
14. Specifications
Table 1
№ p/N name characteristic
1. RU 10 kv KP-11 19 connections of outgoing power cable lines; Type of oil switch Vmpe-10;
2. Transformer voltage type NTMI-10-66
Sectional Oil Switch Vmpe-10
3. PA-8 1 outgoing power line; Type of air switch VDE-35;
4. Voltage Transformer 35
5. RU 10 kv KP-2 11 connections of outgoing power cable lines; Type of oil switch VMG-133 (VMP-10);
1. Sectional Oil Switch TIPAVMP-10
2. Transformer voltage type NTMI-10-66
6 Requirements to the executor

5.1 The executor must have the necessary production and human resources
To perform this work.
5.3 The executor in the commercial offer indicates the procedure of payment of works
and other conditions.
5.4 Certification of the head, ITER and performers on industrial safety and
Protection in accordance with annex № 1.
5.5 Provision of HSE measures, safe methods of work production at the site.
5.6 After completion of the work the executor transmits to the customer executive
Documentation according to RD-11-02-2006 dated 26.12.06. and other regulatory
Documents.
The employees engaged for the work on inspection of Rzia should have the professional training corresponding to the character of performance of works with the mark in the special certificate on passing of training and passing of examinations in attestation commissions.
5.7 The executor should arrive at JSC "EPM-nez" for acquaintance with the volumes of works.

7 Safety of production works

The Contractor shall comply with the requirements of the following rules in the production of the Rzia inspection:
- Safety regulations for the operation of electrical installations;
- Rules of technical operation of electrical installations of consumers;
- Safety regulations of hazardous production facilities on which the
The lifting structures are used;
- Rules of the device of electrical installations;
- Fire safety regulations;
Rules of maintenance of relay protection devices and electric automatics of electric networks 0.4-35 KV Rd 153-34.3-35.613-00;
- Rules on safety at work at height of sweat rm-012-200;
- Rules of ecological, sanitary-hygienic and other norms operating in the territory of the Russian Federation and to provide safe working conditions for life and health of people.
For the production of works the contractor must undergo an introductory briefing. All works performed in the territory of JSC "EPM-Naz" should be carried out according to the provision "on the application of tolerances for the production of high-risk works at the JSC" EPM-Naz "
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Participant who has submitted a bid before bids submission deadline shall upload the following documents:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Job offer (see file "job offer")
8. Contacts:
Deputy. Main energy on electric part-Vitaliy v. Fateyev
Bodies. 8 (8635) 29-44-83 VFateev@energoprom.ru
The leading engineer – Voryntsev Alexander Nikolayevich
Bodies. 8 (8635) 29-43-94 AVorotyncev@energoprom.ru
9. Certificate of conformity to requirements of ISO 9001: 2008 (if available)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Requirements to the performer:
-Permitting documents (SRO, licenses, tolerances).
— Development of the executor, PPRC, RTI.
— Availability of certification of the head, ITER, workers on industrial safety at the OPR.
— Availability of medical admission of personnel to work at the OPI.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 04.02.2019 at 08:47
and selected the winner: "IugEnergoResurs" OOO – (Bidder 2) (Руденко А.Д.) submitting a bid dated of 22.01.2019 18:37 totalling to 300 000,00 RUB (price excl. of VAT)
Notifications have been sent to bidders.
Total bids: 3. More >>