Request for Proposals No. 2410007 
Current repairs of the refractory lining of the ceiling of a furnace with a hearth roll No. 1, Inv. No. 10376, in the impregnation and re-firing workshop in the expandable re-firing section (former section 9 CGE) of impregnation and re-firing in...

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:28.07.2020 18:38 (was extended by 1 h, 38 min, 21 sec)
Last edited:13.07.2020 10:33
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In a commercial offer
Delivery terms:1. Application of EPM-NEZ JSC, Novocherkassk
2. The purpose of the work.
2.1. Performing maintenance work on the refractory lining of the ceiling of the furnace with a hearth roll No. 1 under the supervision of specialists in the supervision of the German company Riedhammer GmbH. 3. The list and scope of work performed.
3.1 During the repair of the furnace, it will be necessary to carry out installation of metal structures and equipment, pipelines, electrical equipment, instrumentation and automation equipment, works on the refractory lining of the ceiling and furnace covers, and other work under the supervision of specialists in the supervision of Riedhammer GmbH.
3.2. Based on the required amount of work, Riedhammer GmbH has developed a schedule for the performance of work indicating the personnel requirements (Appendix: "2019_01_17_assembly timing roof repair CBF # 1").
4. Supply of materials and construction equipment to perform this work.
4.1. Materials, equipment and accessories are supplied by the Customer.
4.2. Materials, equipment and components from the customer’s warehouse to the installation site are delivered by the Contractor.
4.3. Construction and lifting equipment installation equipment, tools and all consumables for them, PPE, necessary for work in accordance with the annexes TA-K 003, TA-K 004, TA-K 005, TA-K 006, TA-K 007, TA- K 008, provided by the performer.
5. Requirements for the Contractor.
5.1. The contractor should have experience in carrying out such work under the guidance of chief installers of foreign companies, provide a reference list with a list of completed work for the competition.
5.2. The contractor must have the necessary production and human qualified resources to carry out this work, be a member of a self-regulatory organization. Have certification of the head, engineering and industrial safety workers at the public educational institution and the availability of medical clearance in accordance with Appendix 1. The qualifications of workers and engineers must satisfy the requirements of Riedhammer GmbH (Appendix: TA-K 002).
5.3. The personnel of the contractor must have and use personal protective equipment in accordance with Appendix TA-K 003.
5.4. In the event of comments on the quality of work performed, breach of safety and at the request of the installation supervision of Riedhammer GmbH, the Contractor is obliged to immediately replace workers who do not perform quality work.
5.5. Poorly executed work must be redone at the expense of the Contractor and handed over to the installation manager of the Riedhammer GmbH company.
5.6. To clarify the conditions for the performance of work, familiarization with the object of work, it is necessary for the Contractor's specialists to arrive at the Customer's place of work.
5.8. Prior to the commencement of work, the Contractor must be fully equipped with machinery, equipment and tools in accordance with paragraph 4.3 of this statement of work.
5.9. The Contractor in his quotation indicates the payment procedure and other conditions.
5.10. The placement of workers employed to perform these works is performed by the Contractor or on a contractual basis by the Customer.
6. Terms of work
6.1 Work at the existing enterprise under the supervision of the installation supervisor of Riedhammer GmbH. The business hours are around the clock.
6.2 Work mode:
Monday-Friday: 8: 00-12: 00 and 12: 30-18: 30 hours
Saturday: 8: 00-12: 00 and 13: 00-16: 00 hours
7. Terms of work.
7.1. Work is carried out from 01.10.2020. within 30 calendar days in accordance with the schedule "2019_01_17_assembly timing roof repair CBF # 1" Appendix 1
The list of documents provided in the public health department of the public safety institution and civil defense for the execution of work orders - tolerances for the performance of work by contractors:
1. Copy of Certificate (SRO) for the right to perform this type of work.
2. A copy of the labor safety briefing from the briefing magazine.
3. POR, PPR or RTI
4. Copy of the protocol of certification of workers for labor protection.
5. Copies of certificates of certification of labor protection engineering and general industrial safety requirements. When performing work on gas, on vessels operating under pressure, using PMG, lifts (towers), in electrical installations, conducting hot work - copies of certificates for each type of work.
6. Medical admission staff.
7. Copies of certificates of gas welders, slingers, crane drivers, hoists (towers). For gas and electric welders - copies of certification protocols for fire - technical minimum.
Prior to the execution of the admission order, all employees of the contracting organization, including managers, are required to undergo introductory briefings at OOTPBiGO (have a document proving their identity and age). When performing work, all employees must have certified clothing, shoes and other personal protective equipment necessary for performing this type of work.
Note: in the event of the expiration of any document, an admission order is not issued prior to the submission of a new document.
Georeferencing:Russia, Rostov region,
Comments:
Participant who has submitted a bid before bids submission deadline shall upload the following documents:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for work (see file "Proposal for work")
8. Contact person: Martyshenko Oleg Mikhailovich - chief mechanic, phone 8 86352-9-48-24 e-mail: Martischenko@energoprom.ru,
9. Certificate of compliance with the requirements of the standard ISO 9001: 2008 (if available) This request is not a notice of a tender or auction and does not give any rights to participants, does not entail any obligations other than those expressly indicated in the notification.
10. Requirements for the Contractor:
Prior to completing the work permit, the Contractor must provide the Customer with the following documents:
- copy of certificate (SRO) for the right to perform this type of work;
- copies of documents confirming the existence of a labor protection service and / or labor protection specialist in the contracting organization (order for appointment to the position in the contracting organization, certification of a labor safety specialist) or the existence of a contract with an accredited organization in the field of labor protection services;
- copy of the instructions on labor protection from the magazine of briefings;
- POR or PPR or RTI;
- copy of the certification protocol for labor protection workers;
- copies of certificates of certification of labor protection engineering and general industrial safety requirements. When performing work on gas, on vessels operating under pressure, with the use of PMG, in electrical installations, hot work - copies of certificates for each type of work;
- medical admission of personnel - copies of certificates of gas-electric welders, slingers, crane drivers, hoists (towers). For gas-electric welders, copies of PTM certification protocols.
In case of discrepancies in the information presented in the documents to the requirements of regulatory legal acts, the Customer has the right to initiate an audit by the OH&S service in matters of labor protection and industrial safety in the organization of the Contractor.
The Contractor shall notify the Customer in writing of the fulfillment of all these conditions in writing with all supporting documents attached. Failure to comply with the terms of this paragraph by the Contractor entitles the Customer to prevent the Contractor from performing work, delay in the performance of work in this case is the fault of the Contractor
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Мартыщенко Олег Михайлович - Главный механик. Тел. 8 (8635)29-48-24, факс 8 (8635)29-42-55, e-mail: OMartischenko@energoprom
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 18.08.2020 at 15:47
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 3. More >>