Request for Proposals No. 2710718 
Carrying out current repairs for the electrical part at EPM-NEZ JSC in 2021.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Carrying out current repairs for the electrical part at EPM-NEZ JSC
in 2021.
See terms of reference (Complex service)

OKPD2 category:
43.21.10  Работы электромонтажные
41.20.20.711  Комплекс электроснабжения
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:20.07.2021 11:28 (was extended by 28 min, 36 sec)
Last edited:19.07.2021 08:27
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In the commercial offer
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk
2. Purpose of work:
Selection of a contractor and determination of the coefficient for the performance of work:
2.1. Execution of current repairs of lighting of marks, under-farm lighting in the workshops of the main production to improve the level of illumination of workplaces.
2.2. Execution of work on the laying of cable lines and lighting lines.
2.3. Execution of works on current repair of electric bridge cranes of EPM-NEZ JSC.

3. Deadline

Start of work on July 01, 2021
Completion of work on July 01, 2022

4. Maintenance of repair work

4.1. Execution of current repairs of electrical equipment and the production of electrical installation works from the material of the contractor. To clarify the conditions for the performance of work, familiarization with the object, it is desirable that the representatives of the Contractor arrive at the Customer.
4.2. Lifting mechanisms for dismantling and installation, equipment, tools, mechanisms for loading and unloading operations are provided by the Executor.
4.3. Cars for removal of garbage, scrap metal or other waste are provided by the Contractor.
4.4. Electric welding, gas-cutting equipment, consumables for them are provided by the Contractor.



5. List and scope of work performed


p / p Name of work Unit of measure Coefficient
1. Lighting
1.1. Dismantling of m / c lamps
1.2. Dismantling of luminaires
1.3. Manufacturing of lighting fixtures
1.4. Installation of luminaire structures
1.5. Installation and connection of luminaires
1.6. Dismantling of wires up to 10 mm²
1.7. Dismantling of wires up to 70 mm²
1.8. Installation of wires in corrugated pipes up to 10 mm²
1.9. Wiring according to installed structures and connection of wire cores up to 10 mm2
1.10. Installation of wires on installed structures and connection of wire cores up to 70 mm²
1.11. Dismantling junction boxes
1.12. Installation of junction boxes
1.13. Dismantling switches
1.14. Installation of switches
1.15. Dismantling, installation, and connection of lighting boards

2. Repair of cable lines
2.1. Dismantling of metal structures for cable laying
2.2. Manufacturing of metal structures for cable laying
2.3. Installation of metal structures for cable laying
2.4. Dismantling / Cable up to 35 kV, laid along impassable overpasses, weight of 1 m of cable: up to 6 kg
2.5. Dismantling / Cable up to 35 kV, laid along impassable overpasses, weight of 1 m of cable: up to 3 kg
2.6. Dismantling / Cable up to 35 kV, laid along impassable overpasses, weight of 1 m of cable: up to 1 kg
2.7. Dismantling / Cable up to 35 kV, laid along impassable overpasses, weight of 1 m of cable: up to 0.5 kg
2.8. Installation / Cable up to 35 kV, laid along impassable ramps, weight of 1 m of cable: up to 6 kg
2.9. Installation / Cable up to 35 kV, laid along impassable ramps, weight of 1 m of cable: up to 3 kg
2.10. Installation / Cable up to 35 kV, laid along impassable ramps, weight of 1 m of cable: up to 1 kg
2.11. Installation / Cable up to 35 kV, laid along impassable ramps, weight of 1 m of cable: up to 0.5 kg
2.12. Layout and connection of cores of cables or wires with a cross-section up to 185 mm2
2.13. Layout and connection of cores of cables or wires with a cross-section up to 70 mm2
2.14. Layout and connection of cores of cables or wires with a cross-section up to 35 mm2
2.15. Layout and connection of cores of cables or wires with a cross-section up to 10 mm2
3. Electric bridge cranes
3.1. Removing a switch on a plate with a central or side handle or a rod control, installed on a metal base: three-pole for current up to 630 A (PZK RS-6)
3.2. Installation of a circuit breaker on a plate with a central or side handle or a rod control, installed on a metal base: three-pole for current up to 630 A (PZK RS-6)
3.3. Dismantling a one-, two-, three-pole automatic machine installed on a structure: on a wall or column, for a current of up to 25 A
3.4. Installation of the automatic machine one-, two-, three-pole, installed on a structure: on a wall or column, for a current of up to 25 A
3.5. Dismantling of starting equipment, protection and signaling
3.6. Installation of starting equipment, protection and signaling
3.7. Removal of the transformer type OSO (OSOV) -0.25kVa 380 / 36V
3.8. Installation of a transformer type OSO (OSOV) -0.25kVa 380 / 36V
3.9. Dismantling of the cabin lamp and crane lighting fixtures
3.10. Installation of a cabin lamp and crane lighting fixtures
3.11. Removing the cab terminal board
3.12. Cab terminal board assembly
3.13. Removing the current relay REO-401 (25-160A)
3.14. Installation of the current relay REO-401 (25-160A)
3.15. Dismantling of cables up to 35 kV according to installed structures and trays with fastening along the entire length, weight of 1 m of cable: up to 5 kg
3.16. Installation of cables up to 35 kV on installed structures and trays with fastening along the entire length, weight of 1 m of cable: up to 5 kg
3.17. Removing the current collectors of the main trolls
3.18. Manufacturing and installation of current collectors for main trolls
3.19. Dismantling of cables up to 35 kV according to installed structures and trays with fastening along the entire length, weight of 1 m of cable: up to 2 kg
3.20. Installation of cables up to 35 kV on installed structures and trays with fastening along the entire length, weight of 1 m of cable: up to 2 kg
3.21. Removal of DC or AC command controllers for current up to 63 A, installed on a structure on the floor (KKT-61, KKT-62)
3.22. Installation of DC or AC command controllers for current up to 63 A, installed on a structure on the floor (KKT-61, KKT-62)
3.23. Removal of a travel or end lever contact switch for general purpose weighing up to 10 kg, installed: on a metal base (KU-701, KU-703, VK-200)
3.24. Installation of a travel or end lever contact switch for general purpose weighing up to 10 kg, installed: on a metal base (KU-701, KU-703, VK-200)
3.25. Dismantling loud bang bell
3.26. Editing a loud fight bell
3.27. Dismantling of the crane furnace PET-2 (PET-4) 380V
3.28. Installation of crane furnace PET-2 (PET-4) 380V
3.29. Dismantling the brake system with a hydraulic pusher or electromagnet TKG-200, TKG-300, TKG-400 (TKT-200, TKT-300, TKT-400)
3.30. Installation of a brake system with a hydraulic pusher or an electromagnet TKG-200, TKG-300, TKG-400 (TKT-200, TKT-300, TKT-400)
3.31. Dismantling of contactors KT-6023 160A (KT-6633 250A, KT-6033 250A) or starters up to 160A
3.32. Installation of contactors KT-6023 160A (KT-6633 250A, KT-6033 250A) or starters up to 160A
3.33. Removing the terminal block MC20kl.
3.34. Installation of the MC20kl terminal panel.
3.35. Removal of electric motors up to 100kg
3.36. Removal of electric motors up to 300kg
3.37. Removal of electric motors up to 500kg
3.38. Removal of electric motors up to 1000kg
3.39. Installation of electric motors up to 100kg
3.40. Installation of electric motors up to 300kg
3.41. Installation of electric motors up to 500kg
3.42. Installation of electric motors up to 1000kg
3.43. Dismantling of cables up to 35 kV on suspended structures with mounting on a roller structure, weight of 1 m of cable: up to 1 kg (cable suspension cable KG)
3.44. Dismantling of cables up to 35 kV on suspended structures with mounting on a roller structure, weight of 1 m of cable: up to 2 kg (cable suspension cable KG)
3.45. Dismantling of cables up to 35 kV on suspended structures with mounting on a roller structure, weight of 1 m of cable: up to 5 kg (cable suspension cable KG)
3.46. Installation of cables up to 35 kV on suspended structures with mounting on a roller structure, weight of 1 m of cable: up to 1 kg (cable suspension KG cable)
3.47. Installation of cables up to 35 kV on suspended structures with mounting on a roller structure, weight of 1 m of cable: up to 2 kg (cable suspension KG cable)
3.48. Installation of cables up to 35 kV on suspended structures with mounting on a roller structure, weight of 1 m of cable: up to 5 kg (cable suspension KG cable)
3.49. Dismantling the resistor block (resistor box) weight: up to 15 kg
3.50. Installation of the resistor block (resistance box) weight: up to 15 kg
3.51. Dismantling the magnetic (magnetic) station
3.52. Manufacturing, assembly and installation of a magnetic (magnetic) station
3.53. Dismantling of the box for pipe wiring, broaching or box, size: up to 200x200 mm (120x120 mm)
3.54. Installation of a box for pipe wiring, broaching or box, size: up to 200x200 mm (120x120 mm)
3.55. Dismantling of the box for pipe wiring, broaching or box, size: up to 500x500 mm (500x500 mm, 450x450 mm)
3.56. Installation of a box for pipe wiring, broaching or box, size: up to 500x500 mm (500x500 mm, 450x450 mm)
3.57. Dismantling the yoke from the channel
3.58. Making a yoke from a channel
3.59. Installation of a yoke from a channel
3.60. Dismantling of steel pipes laid on brackets with a diameter of up to 32 mm
3.61. Dismantling of steel pipes laid on brackets with a diameter of up to 50 mm
3.62. Dismantling of steel pipes laid on brackets with a diameter of up to 100 mm
3.63. Installation of steel pipes laid on brackets with a diameter of up to 32 mm
3.64. Installation of steel pipes laid on brackets with a diameter of up to 50 mm
3.65. Installation of steel pipes laid on brackets with a diameter of up to 100 mm
3.66. Dismantling of pedestals for controllers
3.67. Manufacturing of pedestals for controllers
3.68. Installation of pedestals for controllers
3.69. Dismantling the cable hanger pullers and roller structure
3.70. Manufacturing of cable hanger presses and roller structure
3.71. Installation of cable hanger rollers and roller structure
3.72. Repartition, crimping and connection of cable cores - power
3.73. Repartition, crimping and connection of cable cores - control circuits
3.74. Motor cable entry gaskets, limit switches, pipes, stations, adapter boxes
3.75. Adapter box seals
3.76. Commissioning works























6. Requirements for the Contractor

6.1. The contractor must have the necessary production and human resources to carry out this work.
6.2. The contractor in his commercial offer indicates the procedure for payment for work and other conditions.
6.3. Certification of the head, engineering technician and executors for industrial safety and labor protection at HIFs in accordance with Appendix No. 1.
6.4. Provision of health and safety measures, safe work methods at the facility.
6.5. After the completion of the work, the contractor hands over to the customer the executive
documentation according to RD-11-02-2006 dated 26.12.06. and other regulatory documents.
6.6. Provision of warranty obligations for at least 24 months.
Employees involved in the performance of work must have professional training corresponding to the nature of the work with a mark in a special certificate of training and passing exams in at-test commissions.

7. Work safety

When performing repair and installation of electrical equipment at EPM-NEZ JSC, the contractor must comply with the requirements of the following rules:
- rules for labor protection during the operation of electrical installations;
- rules for the technical operation of electrical installations of consumers;
- safety rules for hazardous production facilities where
lifting structures are used;
- electrical installation rules;
- fire safety rules;
- rules for labor protection when working at height Order of the Ministry of Labor of Russia dated November 16, 2020 N 782n "On approval of the rules for labor protection when working at height."
- rules of environmental, sanitary and hygienic and other norms in force on the territory of the Russian Federation and ensure safe working conditions for the life and health of people.
For the performance of work, the contractor must undergo an introductory briefing. All work performed on the territory of EPM-NEZ JSC must be carried out in accordance with the regulation "On the use of permit work orders in the performance of high-risk work at EPM-NEZ JSC.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Tax registration certificate.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with the tax authority's mark of acceptance.
6. Documents confirming the authority of the representative to sign documents:
- Decision (Protocol).
- Power of attorney.
7. Work proposal (see the file "Work proposal")
8. Contact faces:
Chief Power Engineer - Fateev Vitaly Valerievich
Tel. 8 (8635) 29-44-83 VFateev@energoprom.ru
9. Certificate of compliance with the requirements of ISO 9001: 2008 (if available)
This request is not a notification of a tender or auction and does not give any rights to participants, does not entail the emergence of any obligations other than those expressly indicated in the notification.
10. Requirements for the performer:
- Permits (SRO, licenses, permits).
- Development by the contractor of PPR, PPRK, RTI.
- Availability of attestation of the head, engineering technician, industrial safety workers at the HIF.
- Availability of medical clearance of personnel to work at HIF.
—Before issuing a work permit for work, the Contractor is obliged to provide the Customer with the following documents: copies of documents confirming the availability of a labor protection service and / or a labor protection specialist in the contractor (order for appointment to a position in the contractor, certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 14.08.2021 at 08:00
and selected winners:
  • "MAEM" OOO – (Bidder 3) (Данилов А.В.) submitting a bid dated of 20.07.2021 10:47 totalling to 3,90 RUB (price excl. of VAT);
  • "IugEnergoResurs" OOO – (Bidder 4) (Руденко А.Д.) submitting a bid dated of 20.07.2021 10:56 totalling to 3,30 RUB (VAT free).
Notifications have been sent to bidders.
Total bids: 4. More >>