Request for Proposals No. 975973 
to repair heating units.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

to repair heating units.
, see technical specification (Complex service)

Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:12.03.2018 17:00
Last edited:28.02.2018 16:15
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:monthly, within 30 (thirty) days after the date of
the results of the work, provided that the work is done properly and at the agreed time. The work shall be deemed to be fulfilled after the signing by the parties of the Act of acceptance of the executed works (form COP-2) and information about the cost of work performed and costs (form COP-3).
Delivery terms:1. Application of OJSC "EPM-NJeZ". Novocherkassk
11. Place of work: Customer area (EPM-NJeZ ").

12. Object (technical)
Kiln-industrial furnaces closed type, zaglubljonnye at all at full height, periodic action intended for roasting pressed blanks. Furnaces consist of even number of cameras located in close proximity to each other and are connected by channels. All cameras are placed in two parallel series. The main element of the oven is a camera, divided into 3-6 cassettes. The Chambers are made of firebricks brand SHA, wall cassettes are made of shaped refractory fireclay bricks. When connecting the camera work are covered with removable vaults. Arch camera is a metal frame, lightweight ^ with brick or refractory fibrous materials coated with a thin layer of fibers.
Acheson furnaces-industrial furnaces periodic action panel-frame type conventionally consists of 3 parts: the underground system of supply and exhaust ducts, monolithic reinforced concrete foundations with channels, grooves and notches and overground part 2-halves.
Magnificent furnaces-industrial furnaces periodic action panel-frame type
conventionally consists of 3 parts: the underground system of supply and exhaust ducts,
monolithic reinforced concrete foundations with channels, grooves and notches and overground part of the 2-x or
4-h halves.
Oven roasting re-industrial furnaces closed type, designed for roasting pressed blanks, representing a cylindrical frame inner part which is lined with refractory brick. When connecting the work of the oven are removable vaults. Roof of the furnace is a metal frame made of heat-resistant steel, lightweight with ^ brickwork, fixed to the body with the help of metal hangers
Rotary kiln with fridge-Industrial furnace direct heating, consists of parallel and installed with a slope of cylindrical shells with rotational movement around the longitudinal axis based through bandages on the rollers. The inner part of the furnace and refrigerator lined with refractory brick. The oven is designed to heat the material to physico-chemical treatment, with subsequent cooling in the refrigerator installed on water cooled condensers.
Prokalochnye 16-minute retort furnace-industrial furnaces, continuous, indirect heating, in which o counterflow movement of charge materials and gaseous products of chemical process. Furnace designed for heating the material to physico-chemical treatment, followed by cooling in water cooled refrigerators, installed under the oven.

13. The purpose of the execution of works:
-Furnace Holding furnace elements reconstruction-shoulders, muffle walls, piers, arches, bottom design, cleaning the deck designs, three arches, lined with chamotte-shaped products and eight arches, lined fibrous materials.
Acheson furnaces-conducting elements reconstruction of furnaces-tokopodvodjashhie edges, walls, bottom and podinnye design.
Magnificent furnace-work to restore elements of furnaces-tokopodvodjashhie edges, walls, bottom and podinnye design.
Oven roasting re-work on the restoration of elements-wall ovens, furnaces, bottom.
Rotary kiln with refrigerator-works to restore elements of furnaces-lining of the shell and the refrigerator, door sills, lined ductwork, dust sedimentation Chamber.
Prokalochnye 16-minute retort furnaces Holding furnace elements reconstruction-repair of chassis, retorts, cleaning and repairing ductwork.

14. List and volume of work performed: in TK
15. Application: Technical documentation (drawings)-available for consultation only on the territory of JSC "EPM-NJeZ".

16. Requirement to the Executive Director:
16.1. Work on recovery (repair) furnace units. -from customer's material
16.2. Work in the conditions of an operating business. The enterprise operation mode 24/7.
16.3. Possible exposure to harmful factors: dust, fumes
16.4. Development of PPR and technological cards to all the necessary work.
16.5. Artist must have the necessary production and human qualified
resources to carry out this work. Have a certified Manager, ENGINEERS and workers
industrial safety, as well as the availability of medical admission
16.6. The presence of these types of tras works.
16.7. The availability of machines and mechanisms to accomplish the whole complex of works.
16.8. Executive staff must have and use personal protective equipment.
16.9. In the case of observations to the staff on the quality of work performed, equipment
security, as well as violations of administrative nature, at the request of the specialists
The customer must immediately replace Executive data workers.
16.10. Not qualitatively work should be altered due to the Executive Director and
To the customer.
16.11. Placement of workers employed in the execution of the work produces.
The customer, if given the opportunity, can hold a job placement contract
basis.
16.12. Development and approval of line graphs of repair of furnaces.

17. Payment terms: monthly, within 30 (thirty) days after the date of
the results of the work, provided that the work is done properly and at the agreed time. The work shall be deemed to be fulfilled after the signing by the parties of the Act of acceptance of the executed works (form COP-2) and information about the cost of work performed and costs (form COP-3).

18. Turnaround time: 15.03.2018-15.03.2019 g. Start of work agreed with the customer additionally.

19. Warranty work performed: 12 months from the date of completion of the work on each of these objects.

20. Transmission repair and inspection equipment of repair is made according to approved by JSC "EPM-NJeZ" rules.

21. Furnace repair is carried out in the existing floor. Schedule repair shop agreed with (CGE) and factory services (mind, EC).

22. The list of documents provided in OTPB JeGOiChS to decorate dresses-tolerances for production work by contractors:
1. Copy of certificate (SRO) to perform this type of work.
2. Copies of the briefings on occupational safety and health training log.
3. SINCE THEN, BRP or RTI.
4. Copies of certification work on occupational safety and health.
5. Copies of identity certification ITR on labour protection and the General requirements of industrial safety. When doing work on gas receptacles, working under pressure, using GMP, lifts (towers), electrical systems, conducting fire works-copies of certificates for each type of work.
6. Medical admission personnel.
7. Copies of certificates gazojelektrosvarshhikov, Slingers, operators of cranes, lifts (towers). For gazojelektrosvvarshhikov-copy protocols for fire technical minimum.
Prior to the registration of attire-the admission of all contractor employees, including managers, are required to undergo induction training in OTPB JeGOiChS (you have a document confirming identity and age). The work, all employees must have certified clothes, footwear and other personal protection equipment necessary to perform this type of work.
In the case of any document expiration outfit-admission is not provided prior to the granting of the new instrument.

14. Note: The present terms of reference submitted an indicative amount of work performed in the period from 15.03.2018 g. by 15.03.2019, on all stove components OAO EPM-NJeZ ". The specific scope of work for each object will be determined separately as a business need.
- Delivery of material from the warehouses of OJSC "EPM-NJeZ" to the place of work, garbage (not oshlakovavshegosja refractory bricks, scrap metal, graphite, etc.) on the storage pad located on the territory of JSC "EPM-NJeZ" transport provided by the customer, upon request of the Executive Director.
- Garbage disposal of all categories, industrial waste reception landfills outside the territory of OJSC "EPM-NJeZ" (garbage collection at a distance of 7 km. to 30 km) is carried out by the transport provided by the employer, upon request of the Executive Director.
- Garbage disposal costs for all categories of industrial waste reception landfills outside the territory of OJSC "EPM-NJeZ" is carried out at the expense of the customer.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Participant who has submitted a bid before bids submission deadline shall upload the following documents:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for execution of works (see file "work Proposal")
8. Contact person: Martyshenko Oleg-chief mechanic. Tel. 8 (8635) 29-48-24, fax 8 (8635) 29-42-55, e-mail: Omartischenko@energoprom.ru
9. Certificate of conformity to requirements of standard ISO 9001: 2008 (if available)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Executive requirements:
-Permits (CPO, licenses, tolerances).
— Development of PPR, Executive LEAD, RTI.
— Availability of certification Manager, ENGINEERS, working on industrial safety to GCO.
— The availability of medical staff work at the tolerance of GCO.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 14.05.2019 at 10:04
and selected winners:
  • \"S.K. Teplomontazh\" OOO – (Bidder 1) (Кошель А.В.) submitting a bid dated of 07.03.2018 14:10 totalling to 64 900 000,00 RUB (VAT free);
  • "SRS" OOO – (Bidder 2) (Гудзеев А.Ю.) submitting a bid dated of 11.03.2018 18:21 totalling to 64 904 150,00 RUB (VAT free);
  • NP "IuTM" OOO – (Bidder 3) (Корнецов О.Г.) submitting a bid dated of 12.03.2018 11:14 totalling to 64 850 000,00 RUB (price excl. of VAT).
Notifications have been sent to bidders.
Total bids: 3. More >>