Request for Proposals No. 1354905 
Works on technical re-equipment of the direct heating furnace №3 at the section №1 of the CGE of JSC "EPM-NEZ"

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Works on technical re-equipment of the direct heating furnace №3 at the section №1 of the CGE of JSC "EPM-NEZ"
See the Terms of Reference.

OKPD2 category:
43  Работы строительные специализированные
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:16.10.2019 17:00
Last edited:02.10.2019 12:46
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Look at TK.
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk
2. Place of work: The territory of the customer (JSC "EPM-NEZ").
3. Object (technical device)
Industrial furnace of periodic operation of panel-frame type conventionally consists of 2 parts: monolithic w/w foundation (outer dimension (24840х11840х2800mm) and above ground part of 4 halves (internal dimension of one half (17065х2310х2800mm).
4. The purpose of the work:
Construction of direct heating furnace №3 on section 1 in.№ 7247 CGE.
5. List and scope of works performed:
5.1. Demolition work.
Table 1. Name of work. Ed. Quantity
1. Dismantling of prefabricated elements of the furnace. m3 120.36

2. Dismantling of graphite blocks. t 46,3
3. Disassembly of the walls of direct non-slag firebrick. m3 33,25
4. Disassembly of straight walls from shagged firebrick. m3 99.75
5. Bulkhead brick. m3 50,42
6. Loading garbage t 811.5
7. Loading of garbage in containers manually. t 659,8
8. Cleaning of the pluge and the amount of gas. m3 16,00
9. Removal of graphite crumbs. 100 m3 0.28
10. Cleaning of the fee. 100 m3 0,11
11. Soil development by hand. 100 m3 0.24
12. Disassembly of the okrystallized goat. m3 7,65
13. Breakdown of concrete floors using chop hammers, concrete grade В12,5. m3 12,3
14. Breakdown of concrete foundations, concrete grade B20. m3 66.9
15. Replacement of the prefabricated elements of the furnace common with the adjacent furnace to the final. m3 5.16

5.2 Installation works.
Install the furnace according to the design (see drawings): X13621, PCH13284 SB, ST (PCH) 13621КЖ, ST13621КМ, ST (O020) 13621KM, TK13621, ST (TK) 13621КЖ, ST (VK) 13621, ST (VK) 13621KM.
An indicative list of installation works is contained in Table 2.
When compiling the estimate, the final scope of work should be taken from the project ТХ13621, ПЧ13284 SB, СТ (ПЧ) 13621КЖ, СТ13621КМ, СТ (ОВ020) 13621KM, ТК13621, СТ (ТК) 13621КЖ, СТ (ВК) 13621, СТ (ВК) 13621КМ.
The estimated calculation is made by the performer.
The works provided by the project and not included in the estimates are carried out by the contractor at his own expense.
Table 2.
№№ № pp Name of works. Ed. Quantity
1. Installation of hydraulic cylinders (deg. № НС08516.01.06СБ) - 4 pcs. t 2,8
2. Production of Rack (Ref. No. PCh04203.01.03) -24pcs t 1,416
3. Production of Rack (Ref. No. PCh04203.01.04) -4pcs t 0,44
4. Production of Rack (Ref. No. PCh04203.01.05) -1pc t 0,14
5. Production of Sporadka (Ref. No. HR 13222.25) — 6pcs t 0,2
6. Production of Sporadka (Ref. No. HR 13222.29) — 2pcs t 0,05
7. Production of Ties (devil. №ПЧ 03305.35) - 2pcs with insulators screed (devil. №ПЧ 03305.35.01SB) — 4pcs t 4,88
8. Mounting Rack (deg. № ПЧ04203.01.03) on the design place of the no.ПЧ13222СБ) -24шт Tn 1,416
9. Mounting Racks (deg. № ПЧ04203.01.04) on the design place of traits № ПЧ13222СБ) -4шт t 0,44
10. Mounting Racks (deg. № ПЧ04203.01.05) on the design place of traits № ПЧ13222СБ) -1pc t 0,14
11. Mounting Ties (devil. No. HR 03305.35) with Isolators (deg. №ПЧ 03305.35.01СБ - 4pcs) on design places
(deg. № ПЧ13222СБ) - 2pcs t 4,88
12. Installation of the Struthing (Ref. No. HR 13222.25) on the design place
(deg. № ПЧ13222СБ) — 6pcs t 0,2
13. Installation of the Struthing (Ref. No. HR 13222.29) on the design place
(deg. № ПЧ13222СБ — 2pcs t 0,05
14. Production of stairs (L-1 traits. №ST (OH) 13284KM) — 1 pc t 0,437
15. Installation of stairs (L-1 traits. №ST (OH) 13284KM) on the project place (deg. №ОВ020.13222) — 1pc t 0,437
16. Production of stairs with a platform (devil. №ТХ13284 sheet 2) — 1pcs t 0,555
17. Installation of stairs with platform (devil. №ТХ13284 sheet 2) on the design place (deg. №ТХ13222 sheet 1) — 1pcs t 0,555
18. Production of Panels of overlapping (item №10-11 (deg. №ТХ13222 sheet 3) -2pcs (10) and 1pcs (11), with fenings (pos.12-13 pieces. №ТХ13222 sheet 3) - 2pcs and Overlays (pos. 14 pieces. №ТХ13222 sheet 3) -sht13 ton 2.7
19. Installation of slab Panels (item №10-11 (deg. №ТХ13222 sheet 3) -2pcs (10) and 1pcs (11), with fenings (pos.12-13 pieces. №ТХ13222 sheet 3) - 2pcs and Overlays (pos. 14 pieces. №ТХ13222 sheet 3) -sht13 on the design places (deg. №ТХ13222 sheet 1) ton 2,7
20. Mounting Stand (devil. №НС08516.01.04) on the project place - 4pcs t 0,544
21. Installation of Koromysl (devil. №НС08516.01.03) on the design place - 4pcs t 0,884
22. Mounting glasses (devil. №НС08516.01.01) -8pcs with half-flanges glasses (deg. №НС08516.01.05А) - 16pcs and Prostakami (devil. №NC08516.01.19 and hell. №НС08516.01.20) - 8 pcs - on design places t 0,80
23. Installation of Push Push (devil. №НС08516.01.02) on the design places - 8pcs t 1,10
24. Fabrication and installation of frames for mobile current supply — 4pcs t 0,15
25. Production of formwork for pouring bulls furnace (11800Х3100 -2pcs and 3100Х100-2pcs made of steel sheet 8 and angle 100х100Х8) t 7,76
26. Installation of formwork for pouring kiln bulls (11800Х3100 -2pcs and 3100Х100-2pcs made of steel sheet 8 and angle 100х100Х8) — 2pcs ton 7,76
27. Dismantling of formwork for filling kiln bulls (11800Х3100 -2pcs and 3100Х100-2pcs made of steel sheet 8 and angle 100х100Х8) — 2pcs ton 7,76
28. Production of the girth of the column (deg. № НС08980.03.02) - 3pcs t 0,03
29. Mounting of the column girth (deg. № НС08980.03.02) - 3pcs t 0,03
30. Production and installation of pipelines of hydraulic wiring of the furnace (deg. № ТК13222) t 0,5
31. Installation of couplings electrical insulation (device-№РМ03331.04) pcs 8
32. Installation of tees (deg. № НС04.969.04.00-01) pcs 6
33. Mounting cross (deg. № НС04.969.06 -01) pcs 2
34. Installation of valve nozzle (deg. № НС04.969.00.16 -01)
pc 24
35. Mounting nut coupling (deg. № НС04.969.00.19) pcs 60
36. Mounting nut coupling (deg. № НС04.969.00.19-01) pcs 114
37. Installation of nipple ball (deg. № НС04.969.00.21) pcs 40
38. Installation of ball nipple (deg. № НС04.969.00.21-01) pcs 74
39. Installation of nozzle pass dy=1520 pcs 16
40. Installation of welded nozzle dy=20 pcs 8
41. Installation of welded nozzle (deg. №ТК11458.01) pc 4
42. Installation of nozzle (devil. №ПЧ00380.03.01) pcs 2
43. Installation of nozzle (devil. №ПЧ00380.03.01-01) pcs 2
44. Mounting plug (devil. №НС08980.03.01.26) pc 4
45. Mounting pressure gauges ICC 160-1-160-1.5 with throttling valve pcs 2
46. Installation of valves Zard 20.160.30-00R DN20 pcs 12
47. Mounting high pressure sleeve 375-10 (SAE 100-R8) -11m pcs 2
48. The device of the communication channel - manufacture and installation of frames and covers t 0,2
49. Production of rack -1pcs and supports - 2pcs for busbar t 0,5
50. Mounting rack -1pcs and supports — 2pcs for bus- on design places t 0,5
51. Surface priming of furnace metal structures 150 sq. m.
52. Painting of metal structures of the furnace square meters 150
53. Dismantling of ties, metal traverse. t. 0,84
54. Production of reinforcement frames. t. 11,63
55. Manufacturing of mortgage products. t. 1,66
56. Installation of reinforcement frames. t. 11,63
57. Installation of embedded products. t. 1,66

If it is necessary to perform additional works not provided for in this task, the Contractor performs them on a separate task of the Customer with the compilation of estimates with indexes and coefficients, to be used in the estimate of the bulk of work of this task.$
58. Annexes. Technical documentation (drawings) — ТХ13621, ПЧ13284 SB, СТ (ПЧ) 13621КЖ, СТ13621КМ, СТ (ОВ020) 13621KM, ТК13621, СТ (ТК) 13621КЖ, СТ (ВК) 13621, СТ (ВК) 13621КМ.
59. Supply of materials and construction machinery to perform this work.
59.1. Works are carried out using materials and components of the Customer, including balloon propane, oxygen and other welding gases.

59.2. Construction and lifting equipment, installation equipment, mechanisms for loading works, tools and all consumables for them, auxiliary materials, PPE, electric welding, gas-cutting and other equipment necessary for carrying out works, including, if necessary, concrete pumps shall be provided by the Contractor
59.3. The bridge crane is provided by the Customer, the operator of the bridge crane is provided by the Contractor.
59.4. Materials and components from the Customer's warehouse to the place of installation is delivered by the Contractor.
60. Requirements to the Contractor.
60.1. The contractor must have all the necessary production and human resources to carry out the work.
60.2. To clarify the conditions of performance of works, familiarization with the object it is necessary to arrive representatives of the Contractor to the Customer.
60.3. The Contractor in his commercial offer shall indicate the payment procedure and other conditions.
60.4. Certification of the head, engineering and performers on industrial safety and labor protection at the GCO according to item 12.
60.5. Provision of safety and safety measures for on-site work.
60.6. In case of reasonable comments to the personnel on the quality of performed works, violation of safety, as well as violations of administrative nature, at the request of specialists of the Customer the Contractor is obliged to replace these employees immediately.
60.7. Performed not qualitatively work should be redone at the expense of the Contractor and handed over to the Customer.
60.8. Placement in sanitary facilities of workers employed for the performance of this work is made by the Contractor. The customer, if available, can arrange placement of workers on a contractual basis.
60.9. The Contractor shall develop and agree with the Customer estimates, linear schedule of work performance, ERP, PPR and technological maps for all necessary works - within a period of no more than 15 calendar days after announcement of the winner of the competitive procedure.
60.10. The removal of garbage of all categories, to landfills of receiving industrial waste, is carried out by transport provided by the Customer, on the preliminary request of the Contractor. The costs of waste disposal of all categories, at landfills of receiving industrial waste, are borne by the Customer.
60.11. Loading of garbage is carried out by forces and mechanisms of the Contractor.
60.12. It is necessary to have SRO for these types of work.
61. Payment terms: monthly, within 30 (thirty) banking days after the delivery of the results of the work, provided that the work has been done properly and within the agreed time frame. The work is considered to have been completed after the signing by the Parties of the Certificate on acceptance of the performed works (form KS-2) and the Certificate on the cost of the performed works and costs (form KS-3).
62. Terms of execution of works: 6 calendar months. Beginning of works is agreed with the Customer additionally.
63. Warranty obligations for performed works: 12 months from the date of completion of the work.
64. Special conditions: Work on technical re-equipment of the furnace is carried out in the operating shop. Repair schedule is agreed with the shop (CGE) and plant services (UM, EU).
65. The list of documents provided to the UOTIPP for the execution of work permits by contractors:
1. Copies of the Certificate (SRO) for the right to perform this type of work.
2. Copies of the instruction on labor protection from the briefing journal.
3. ERP, RDP or RTI.
4. Copies of the report of certification of workers on labor protection.
5. Copies of certificates of certification of labor protection and general requirements of industrial safety. When performing works on gas, on vessels working under pressure, using GPM, lifts (towers), in electrical installations, carrying out fire works - copies of certificates for each type of work.
6. Medical admission of staff.
7. Copies of certificates of gas-electric welders, slingers, drivers of cranes, lifts (towers). For gas-electrowelders — copies of certification protocols for fire-technical minimum.
Before the beginning of registration of an order - admission all employees of the contractor organization, including managers, are obliged to undergo an introductory instruction in the UOTIP (with you have a document confirming the identity and age). All workers must have certified clothing, footwear and other personal protective equipment necessary to perform this type of work.
If any document expires, the permit is not granted until the new document is submitted.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (who made an offer) must upload the following documents to the system before the deadline for accepting applications:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for work (see "Proposal for work" file)
8. Contact persons:
Chief mechanic — Oleg Martyshchenko
tel. 8 (8635) 29-48-24 OMartischenko@energoprom.ru
St. engineer OGM — Generalenko Mikhail Vladimirovich
tel. 8 (8635) 29-44-83 MGeneralenko@energoprom.ru
9. Certificate of conformity to requirements of ISO 9001: 2008 (if available)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Requirements for the performer:
— Permission documents (SRO, licenses, permits).
— Development by the performer of PPR, PPR, RTI.
— The presence of certification of the head, engineering and industrial safety workers at the GCO.
— Availability of medical admission of personnel to work at the GCO.
—The Contractor shall provide the following documents to the Customer prior to the issuance of the Work Permit: copies of documents confirming the presence in the contractor organization of labor protection service and/or occupational safety specialist (order on appointment to a position in the contractor organization, certificate specialist of labor protection) or the existence of an agreement with an accredited organization in the field of labor protection services.
For the consideration of the application, it is MANDATORY to provide a commercial offer.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 31.10.2019 at 16:39
and selected the winner: \"INTEKO\" OOO – (Bidder 1) (Мосейчук О.И.) submitting a bid dated of 16.10.2019 15:39 totalling to 3 984 000,00 RUB (price excl. of VAT)
Notifications have been sent to bidders.
Total bids: 3. More >>