the development project and working documentation for objects:
- "Reconstruction of the hull # 41»
- "Dismantling Corp. 137 " Object dismantling-building Installation building No. 137 burning waste, located in the territory of LLC «Omsktekhuglerod», Omsk, UL. Baraba Akcija, 20.
Assigning object-accommodation of technological equipment for waste disposal. The object is not currently operated for its intended purpose technological equipment and technological lines dismantled, from engineering is disabled.
Year of acceptance into operation-1980 g.
Number of stories in the axes «1 -2»-3 axes "3-5"-canopy building area, M2-164.25 building volume, M3-604.0
Object reconstruction is building # 41. Building # 41 represents the locked out in several parts of the building.
In axes and-d/0-13 provides a soot-handling plant, adjacent to the warehouse of soot (axes and-d/13-29) with bunker gallery located in axes d-e/14-28. By axis 0 to soot attached processing shop building in axles and d/11-31.
Currently, the rooms on the first floor of the hull No. 41 used as warehouses. Warehouse soot combined with premises first floor shop handle the soot in the axes a-d/5-13. In the annex by the 0 axis (axes and-d/11-31) production of refractory bricks, whose premises occupy a part of the processing plant in axes and-/0-5.
Hopper Gallery (axes and-d/12-28), currently separated from soot brick wall on the d axis and not used. Railroad tracks located under the bunkers being exploited.
Building electrified, equipped with utilities. Refractory bricks production premises equipped with forced ventilation with natural and mechanical motivation. Lighting indoors buildings natural through window apertures and in vitro in normal performance.
The building was put into operation in 1957 year.Collapse
Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
the customer makes payment to the Contractor upon completion of a separate phase not later than 15 (fifteen) banking days after signing acceptance certificate of executed works, information on the cost of work performed and costs and provide invoices. Calculations are made by transferring money to the account of the contractor. By agreement of the parties may be subject to other forms of payment stipulated by the current legislation.
Delivery terms:
contract work performed in two stages: -project documentation-working documentation.
Georeferencing:
Россия, Омская область, г. Омск, 644049, ул. Барабинская, 20
Comments: 1. The contractor working on the Model Treaty of the customer.
2. requirements to the composition of the tender participant specified in the job.
3. all questions send an e-mail tender@omskcarbon.com
4. Please note that the request for proposals is not an auction and not subject to the requirements of articles 447-449 of the Civil Code of the Russian Federation.
The organizer has the right to request for proposals, how to choose the winner of the procedure and complete it, rejecting all incoming proposals.
The organizer of the RFP defines the winner of the request for proposals on the basis of criteria. The lowest price offered during the request for proposals does not mean a definitive victory in the procedure.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.