Request for Proposals No. 1292288 
Reconstruction and installation of technological equipment of the dosing area of the dry batch of process thread № 2 in the RPU SPC section № 1.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Reconstruction and installation of technological equipment of the dosing area of the dry batch of process thread № 2
in the RPU SPC section № 1.
See the TK and related documentation

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:22.07.2019 09:20
Last edited:08.07.2019 09:18
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Specified in the commercial offer
Delivery terms:1. Application of JSC "EPM-NEZ", g. Novocherkassk

11. The purpose of the work.
11.1. To carry out reconstruction and dosing area in order to increase the accuracy of dosing of dry batch of the 2nd process thread of the SPC (site № 1).

12. List and scope of work performed:
12.1. Improvement of varietal bunkers № 1- № 11 which includes:
12.1.1. According to the scheme No. 1 Annex No. 2 it is necessary to rework existing varietal bunkers (change of hopper geometry, in order to install screw feeders). Install level sensors in 11 bunkers. Productivity of the nm feeder 5 h.
12.1.2. For varietal bunkers 6.7, provide for installation of valves type "Armatek" or analogue before the feeder of screw type to exclude spillage of small fractions.

12.2. Installation of 4 suspension hoppers — dispensers, suspension to be performed on three load cells.
- The volume of the suspension hopper — 1.2 m3
- dosing accuracy - 1 kg
- material entering 11 bunkers is grouped as follows:
- 1 outboard hopper - from bunkers № 1- 2;
- 2 suspension bunker - from bunkers № 3-5;
- 3 outboard hopper - from hopper № 6-8;
- 4 outboard hopper - from hopper № 9-11

3.3 Install iron oxide dispenser on three load cells, maximum volume 40 kg, dosing accuracy 0.2 kg.
3.4 Execute the new equipment power supply project
- Specify locks, $
- The procedure for inclusion, $
- Disconnect Order
3.5. When installing outboard bunkers, take into account the dimensions for the movement of the dosing cart not less than 2200 mm.

4. $ Supply of materials and construction machinery.
4.1 Materials, equipment and components shall be supplied by the Contractor.
4.2 Construction and lifting equipment installation equipment, tools and all consumables to them, PPE necessary for carrying out works shall be provided by the Contractor.

5. Requirements to the Contractor.
5.1. The contractor must have experience in performing such works, provide a reference list with a list of performed works for the competition.
5.2. The contractor must have the necessary production and human qualified resources to perform this work, be a member of the self-regulatory organization. Have a certificate of the head, ITR and workers on industrial safety at GCO and medical clearance according to Annex 1.
5.4. In case of comments on the quality of performed works, violation of TB and at the request of the Customer's specialists. The contractor is obliged to immediately replace workers who do not perform work qualitatively.
5.5. The work performed is not qualitatively must be redone at the expense of the Contractor and handed over to the specialist supervising the work.
5.6. To clarify the conditions of work, familiarize with the object of work, it is necessary to arrive the Contractor's specialists to the Customer at the place of work.
5.8. Prior to the commencement of the work, the Contractor shall be fully equipped with machinery, equipment and tools in accordance with paragraph 4. of this TK.
5.9. The Contractor shall specify the payment procedure and other conditions in his commercial offer.
5.10. Placement of workers engaged in the performance of these works is performed by the Contractor or on a contractual basis the Customer.
5.11 The contractor shall undergo induction training in order to perform the work. All works performed on the territory of JSC "EPM-NEZ" shall be carried out in accordance with the provisions "On the application of tolerances in the production of high-risk works at JSC "EPM-NEZ".

6. $ Terms and conditions of work
6.1 Work in an existing enterprise. Working hours of the enterprise are round the clock.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (who made an offer) must upload the following documents to the system before the deadline for accepting applications:
1. Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Certificate of registration on tax registration.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with the stamp of the tax authority on acceptance.
6. Documents confirming the authority of the representative to sign documents:
— Decision (Protocol).
- Power of attorney.
7. Proposal for work (see the file "Proposal for work")
8. Contact persons:
Director of Investment Projects — Maxim Naprasnik
Tel. 8 (8635) 29-48 36 mnaprasnik@energoprom.ru
Leading engineer — Vorotyntsev Alexander
tel. 8 (8635) 29-43-94 AVorotyncev@energoprom.ru
9. Certificate of compliance with the requirements of the ISO 9001 standard: 2008 (if available)
This request does not constitute a notice of holding a competition or auction and does not give any rights to the participants, does not entail any obligations other than those expressly specified in the notice.
10. Requirements to the performer:
— Authorisation documents (SRO, licenses, tolerances).
— Development by the executor of PPR, PPRK, RTI.
— Availability of certification of the head, ITR, workers on industrial safety at GPO.
— Availability of medical admission of personnel to work on GPO.
— Prior to the issuance of the work permit, the Contractor shall provide the following documents to the Customer: copies of documents confirming the presence in the contractor organization of labor protection service and/or occupational safety specialist (order on appointment to a position in the contractor organization, certificate occupational safety specialist) or the existence of an agreement with an accredited organization in the field of labor protection services.
To consider the application, it is mandatory to provide a commercial offer.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 05.08.2019 at 08:39
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 0