Request for Proposals No. 2481034 
Repair of laboratory premises of the OK building of the Plant Management inv. No. 1804.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Repair of laboratory premises of the OK building of the Plant Management inv. No. 1804.
See terms of reference

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:05.11.2020 17:00
Last edited:16.10.2020 16:18
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In the commercial offer
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk
2. The purpose of the work.
2.1. Repair of laboratory premises OK inv. No. 1804.

3. List and scope of work performed.

1
4. Disassembly of glazed ceramic wall cladding 100 m2 cladding surface 100.3
5. Dismantling: brick partition 1 m3 4.5
6. Dismantling of plasterboard cladding: walls and partitions m2 24.6
7. Disassembly of floor coverings: from ceramic tiles m2 47
8. Continuous leveling of internal surfaces (one-layer plastering) from dry mortar mixtures: up to 10 mm thick: walls m2 85
9. Smooth cladding of walls, pillars, pilasters and slopes (without cornice, baseboard and corner tiles) without installing toilet tiles on dry mix glue: brick and concrete m2 85
10. Screed device: cement screeds, thickness 20mm m2 47
11. Installation of coatings on a mortar from a dry mix with the preparation of a mortar under building conditions from tiles: relief glazed ceramic for floors of multicolor m2 47
12. Device: suspended ceilings of the Armstrong type on a frame made of galvanized profiles m2 47
13. Packing construction waste into bags of 1 ton 9.29
14. Removal of construction waste from the building for loading onto a car 1 t 9.29
15. Loading operations in road transport: construction waste with manual loading of 1 ton of cargo 9.29

16. Materials, mechanisms, equipment and tools provided by the Contractor.
16.1. The works are performed from the material of the performer.
16.2. Lifting mechanisms and mechanisms for loading and installation works are provided by the contractor.
16.3. The tool for performing the work is provided by the contractor

17. Requirements for the Contractor.
17.1. The contractor must have the necessary production and human resources to carry out this work, be a member of a self-regulatory organization (SRO).
17.2. To clarify the conditions for the performance of work, familiarization with the object, the arrival of the Contractor's representatives to the Customer is mandatory.
17.3. In the organization of the Contractor, according to the staffing table, there must be at least ten staff units of blue-collar occupations. The organization must conduct production and economic activities for at least three years and not have a zero balance sheet
17.4. The contractor in his commercial offer indicates the procedure for payment for work and other conditions.
17.5. Certification of the head, engineering technician and executors for industrial safety and labor protection at HIF. According to Appendix No. 1.
17.6. Provision of health and safety measures for safe work methods at the facility.
17.7. The contractor must have a health and safety specialist on staff

18. Conditions of work
18.1. Work at an operating enterprise.
... 6.2 Development of PPR or PPRK is carried out by the Contractor.
6.3 Lifting mechanisms, rigging devices in accordance with the PPR for installation are provided by the Contractor.
6.4 Vehicles for garbage collection and disposal are provided by the Customer.
6.5 Works are performed according to the customer's project.

19. Turnaround time.
19.1. Commencement of work - October 2020.
19.2. Completion of work - November 2020
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Work proposal (see the file "Work proposal")
8. Contact person: Tetslav Vladimir Edvinovich - head
OEiNziS, phone 8 86532-9-42-13, fax 8 86352 9-46-18 e-mail: VTetslov@energoprom.ru.
9. Certificate of Compliance with ISO 9001: 2008 (if applicable)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Requirements for the performer:
- Permitting documents (SRO, licenses, permits).
- Development by the contractor of PPR, PPRK, RTI.
- Availability of attestation of the head, engineering technician, industrial safety workers at HIF.
- Availability of medical clearance of personnel to work at HIF.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 09.11.2020 at 15:42
and declared the call for bids void.
Notifications have been sent to bidders.