Request for Proposals No. 2680443 
Repair of the reverse water supply pipeline of unit No. 8 KPP 3 at JSC " EPM-NEZ" The estimated cost of the work is 217 thousand rubles. without VAT

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
42.2  Сооружения и строительные работы по строительству инженерных коммуникаций
43.22.11.130  Работы водопроводные взаимосвязанные
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:14.06.2021 11:00
Last edited:02.06.2021 14:56
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Upon completion of the work
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk

2. Purpose of the work:
2.1. Replacement of two pipes of recycled water Ø 80 mm, laid on cable trays and failed during operation, to ensure reliable supply of recycled water to the furnace unit No. 8 KPP 3.

3. Work completion period
The work will start on May 11, 2021.
Completion of work on June 14, 2021

4. Content of repair work
4.1. Replace two recycled water pipelines, according to the defective list (Appendix No. 2), in parallel with the existing pipelines on the premises of the furnace unit No. 8 of the checkpoint 3. The work should be carried out taking into account the schedule of turning on the unit No. 8 of the checkpoint 3, without stopping and putting it into repair.
4.2. Insert the newly installed pipelines into the existing recycled water pipelines.
4.3. To carry out dismantling with the subsequent delivery to scrap metal of the failed 2 pipelines of recycled water.
4.4. Lifting mechanisms for dismantling and installation, equipment, tools, mechanisms for loading and unloading operations are provided by the Contractor. Vehicles for the removal of garbage, scrap metal or other waste are provided by the Customer.
4.5. Electric welding, gas-cutting equipment, and consumables are provided by the Contractor.

5. Requirements for the Performer
5.1. The contractor must have the necessary production and human resources to perform this work.
5.2. The contractor in its commercial offer specifies the order of payment for the work and other conditions.
5.3. Certification of the head, ITR and performers on industrial safety and labor protection on the OPO according to Appendix No. 1.
5.4. Ensuring safety and security measures, safe methods of work on the site.
5.5. Ensuring safety and security measures, safe methods of work on the site.
5.6. After completion of the work, the contractor transfers the executive order to the customer.
documentation according to the RD-11-02-2006 of 26.12.06 and other regulatory documents.
5.7. Providing warranty obligations for at least 24 months.
Employees involved in the performance of work must have professional training that corresponds to the nature of the work performed with a mark in a special certificate of training and passing exams in certification commissions.

6. Safety of work production
When performing repairs, the contractor must comply with the following rules::
- Safety rules for hazardous production facilities where lifting facilities are used;
- Fire safety regulations;
- the Order of the Ministry of Labor of the Russian Federation of 16.11.2020 N 782n "On approval of the Rules on labor protection at work at height".
- the rules of environmental, sanitary and hygienic and other standards in force on the territory of the Russian Federation and to ensure safe working conditions for the life and health of people.
To perform the work, the contractor must pass an introductory briefing. All work performed on the territory of JSC "EPM-NEZ" must be carried out in accordance with the regulations "On the application of work permits for the production of high-risk work at JSC "EPM-NEZ".
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. The Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Certificate of tax registration.
4. Extract from the Unified State Register of Legal Entities.
5. The balance sheet as of the last reporting date with the tax authority's mark of acceptance.
6. Documents confirming the authority of the representative to sign the documents:
- Decision (Protocol).
- Power of attorney.
7. Job offer (see the file " Job offer")
8. Contact persons: Chief Power Engineer-Vitaly V. Fateev,
tel. 8(8635)29-44-83 VFateev@energoprom.ru
Leading power engineer-Sergey Malyshev
tel. 8(8635)29-44-83 SMalyshev@energoprom.ru
9. Certificate of compliance with the requirements of the ISO 9001: 2008 standard (if available)
This request is not a notice of a tender or auction and does not give any rights to the participants, does not entail any obligations, except as expressly stated in the notice.
10. Requirements for the performer:
- Permits (SRO, licenses, permits).
- Development by the contractor of the PPR, PPRK, RTI.
- Availability of certification of the head, ITR, workers on industrial safety at the OPO.
- Availability of medical access for personnel to work at the OPO.
- Before issuing the work permit, the Contractor must provide the Customer with the following documents: copies of documents confirming the presence of a labor protection service and/or a labor protection specialist in the contractor (an order for appointment to a position in the contractor, a certificate of a labor protection specialist) or the existence of a contract with an accredited organization in the field of providing labor protection services.
To consider the application, it is MANDATORY to provide a commercial offer.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 25.06.2021 at 08:33
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 0