Request for Proposals No. 3420425 
Startsevo Removal of the vegetable layer

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Startsevo Removal of the vegetable layer
Removal of the PRS, loading and removal from the construction site

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:13.09.2023 00:28 (was extended by 28 min, 45 sec)
Last edited:05.09.2023 10:38
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Advance payment, upon closing of the COP
Delivery terms:According to the Requirements Specification
Georeferencing:660015, Russia, Krasnoyarsk Territory, Yemelyanovsky district, Solontsovsky village Council, 803rd km of the Baikal highway (left side), uch. No. 9
Comments:
1. All work is done "turnkey" with materials and forces
The contractor. The cost of the work includes temporary lighting,
sanitary facilities and their maintenance, installation
of temporary fences, scaffolding, stairs, maintenance and
maintenance of the site of work and approaches to it, and
other measures necessary for the safe production
of work; consumables, travel expenses,
personal protective equipment for safety, sanitation,
collection, removal and disposal of garbage, safety of materials,
equipment and property, obtaining and developing the necessary
related documents for the production of works and other costs
necessary for the successful completion of work within the time limits set
by the contract and with the quality that meets the requirements
The Customer, this Technical Specification and Working Documentation.
2. When building an object, be guided by RD-11-02-2006
regarding the composition and list of certificates of inspection of works and
structures, phased delivery of works and sets of Executive
documentation to the Customer's technical supervision representative.
3. Ensure daily cleanliness of the construction site and
the surrounding area. After completion of the work, it is necessary
to clean the territory and remove garbage.
4. Any changes in the composition and content of the work,
equipment and materials used shall
be documented in writing and sent in advance to
To the customer for consideration.
5. Payment for the work performed shall be made for
the amount of work actually performed, based on the executive
documentation, with confirmation by the technical supervision and
surveyor of the Customer. The volumes of completed works and materials
are closed "in the body", i.e. taking into account the coefficients of compaction,
decompaction, losses during transportation, laying, etc. are not
taken into account and should be taken into account in the cost of works and materials.
6. The Contractor undertakes to prepare and send to the Customer
a daily report, in the form of the Customer, on the work performed.
7. The contractor, before signing the contract, went to the site,
I got acquainted "in the field" with all the conditions of work –
entrances, places of storage of materials, etc., inspected
the place of work, relief and all the conditions for
the production of work. The results of the site inspection
and local conditions are reflected in the scope and cost of work.
8. Security, delivery / removal of equipment is included in the cost of work.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived