Building materials: window blocks, plywood, linoleum, finishing materials. Procedure in 1 STAP. without rebidding. MUST FILL IN THE ATTACHED KP in excel format TO THE DOCUMENT!!! BE SURE ON DELIVERY TERMS!!
Building materials: window blocks, plywood, linoleum, finishing materials. Procedure in 1 STAP. without rebidding. MUST FILL IN THE ATTACHED KP in excel format TO THE DOCUMENT!!! BE SURE ON DELIVERY TERMS!! Delivery of goods and materials to a warehouse in the city. Yakutsk until December 15, 2022 Specify the cost of delivery as a separate line in the terms of the CP Mandatory packaging in the battens. When sending analogues, attach technical characteristics and photos of the proposed analogue.Collapse
OKPD2 category:
Show all (0 more)
13.96.17.190 Материалы отделочные и аналогичные изделия прочие, не включенные в другие группировки
22.23.14 Блоки дверные и оконные, пороги для дверей, ставни, жалюзи и аналогичные изделия и их части пластмассовые
22.23.14.110 Блоки дверные пластмассовые и пороги для них
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
100% post payment upon delivery of goods and materials to the Buyer's warehouse within 15 banking days
Comments: 1) Please note that participation in the contest means acceptance of the Buyer's contract form.
2) It is necessary to attach the quotation electronically - signed and stamped.
3) When issuing a KP, it is necessary to specify the manufacturer of products, availability, production time, delivery time to the supplier's warehouse, cargo dimensions (weight, volume, number of containers), point of departure;
4) The product must be new, not used;
5) The products must be accompanied by certificates of conformity, passport, document confirming
quality;
6) Before shipment, you must fill out a packing list (see an example of filling in the purchase order
documents), stick the packing list on the package with the goods, send copies of the documents to the customer by e-mail.
Please note that this request is not a notice of a tender (public competition) or a public offer and is not regulated by Article 447-449 Part 1 of the Civil Code of the Russian Federation, Article 1057-1061 Part 2 GK RF. Thus, this procedure does not impose on the Organizer the corresponding amount of civil and legal obligations and reserves the right to refuse all received Proposals for any cause or terminate the selection procedure at any time without incurring any liability to Participants.
In the proposed KP specify:
1) Separate the cost for the goods and separately the cost for delivery;
2) Certificates of conformity;
3) Manufacturer links;
4) Payment terms;
5) Delivery terms;
6) The supplier's attitude to the supplied products (manufacturer, free seller, official dealer);
7) Guarantee.
8) Full compliance with the name of the inventory in commercial offers (hereinafter in the shipping documents) requested in the purchase.
9) The requirement to comply with the temperature regime when transporting goods in the Far North
10) Responsible - Gennady Evgenievich Grebnev. Tel. +7 (4112) 26-31-82, ext. 208
GrebnevGE@polymetal.ru
The design of the package (transport container) should provide the ability to transport goods by any mechanical device, including forklift, cranes, trolleys or manual manipulation, in depending on the dimensions and weight of the cargo (goods). The package must be designed in such a way as not to interfere with free access to the contents of the package.
Rolled metal products (pipes, fittings, angles, sheets, etc.) must be securely tied (wire, wire rod or metal tape) in bundles (packages). The bundle of packages must withstand the weight of the cargo in the bundle during loading and unloading operations and prevent the metal from falling out of the bundle.
Each package must have an UL (or a factory label from the manufacturer).
Also, to prevent the shortage of goods and materials during delivery, UL with complete data (weight, number of pieces in 1 place) - on the list of goods and materials that cannot be visually calculated in a section (pipe, channel, etc.).
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
Савельев Александр Олегович
Инженер ОМТС Якутский Филиал
«ТД Полиметалл»