Request for Proposals No. 1288895 
Building materials, fuel and lubricants. When forming a CP, it is necessary to take into account positional delivery. Tara must comply with the requirements of the RCC

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:09.07.2019 11:28 (was extended by 1 h, 28 min, 34 sec)
Last edited:05.07.2019 08:46
Organizer (Initiator):POLYMETAL TRADING, LTD
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:100% post payment upon receipt of the corresponding batch of goods and materials at an intermediate warehouse in the city of Aldan within 10 banking days
Delivery terms:Supplier to the intermediate warehouse TD in the city of Aldan
Georeferencing:Sakha Republic (Yakutia), Aldan ulus, Aldan
Comments:
1) Please note that participation in the tender means acceptance of the form of the buyer’s contract.
2) Be sure to attach a commercial proposal in electronic form.
3) Commercial proposal shall specify the product manufacturer, product availability, production time, time of delivery to the Supplier's warehouse, cargo dimensions (weight, volume, number of containers), dispatching point;
4) The supplied products must be new, not previously used;
5) The supplied products shall be accompanied with conformity certificates, passport, quality confirming
certificate;
6) Before shipment, be sure to fill out a packing list (see example in procurement
documentation), stick packing list on the packaging of the supplied products, copies of documents shall be sent to the customer by e-mail.
This procedure of request for proposals is not a tender, it is not subject to Articles 447-449, Section 1, Civil Code of the Russian Federation; this procedure is not a public tender, it is not subject to Articles 1057-1061, Section 2, Civil Code of the Russian Federation; Thus, this procedure does not impose the corresponding amount of civil and legal obligations on the Organizer, and the Organizer reserves the right to refuse all the proposals received for any reason, or to terminate the selection procedure at any time, incurring no liability before the participants.
Submitted commercial proposal shall specify:
1) Products cost and delivery cost (separately);
2) Conformity certificates;
3) Reference to the manufacturer;
4) Payment terms;
5) Delivery term;
6) Supplier's relation to the supplied products (manufacturer, free seller, official dealer);
7) Warranty.
8) Full compliance with the name of the TMC in commercial proposals (hereinafter in the shipping documents) requested in the procurement.
9) The requirement to comply with the temperature regime during the transportation of cargo in the conditions of the Far North
10) Responsible - Malyshev Anatoly Andreevich. Tel. 7 (4112) 26-31-82, ext.214
MalyshevAA@polymetal.ru
The packaging design (shipping container) should provide the ability to handle the handling of goods by any mechanical device, including a forklift, cranes, trolleys or manual manipulation, depending on the size and weight of the goods (goods). The design of the package must be designed in such a way as not to impede free access to the contents of the package.
Metal products (pipes, fittings, angles, sheets, etc.) must be securely tied (wire, wire rod or metal tape) into bundles (packages). A bundle of pieces of cargo must withstand the weight of the load in a bundle during loading and unloading operations and exclude loss of rolled metal from the bundle.
Each package must have an UL (or a factory label from the manufacturer).
Also, to prevent a shortage of goods and materials on delivery, an UL with complete data (weight, number of pieces in one place) is on the list of goods and materials that cannot be visually calculated in the section (pipe, channel, etc.).

MANDATORY COMPLIANCE WITH PACKAGING ACCORDING TO RECOMMENDATION FOR CARRIAGE OF GOODS TO THE RX
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 23.07.2019 at 07:37
and selected winners:
  • \"SOMAT\" OOO – (Bidder 3) (Александров Е.В.) submitting a bid dated of 10.07.2019 09:45 totalling to 800 438,03 RUB (price incl. VAT)
    for items No. 1-3, 6, 7, 9-11, 8
  • "ElTekh" OOO – (Bidder 5) (Тулинов А.В.) submitting a bid dated of 10.07.2019 09:59 totalling to 418 000,00 RUB (price incl. VAT)
    on Item No. 12
Обоснование: По наименьшей цене.
Notifications have been sent to bidders.
Total bids: 5. More >>