Request for Proposals No. 2559381 
Construction of a four-section direct heating furnace No. 2 (Kastner)

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Construction of a four-section direct heating furnace No. 2 (Kastner)
See Terms of Reference.

OKPD2 category:
43  Работы строительные специализированные
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:09.03.2021 17:00
Last edited:26.01.2021 11:12
Bidding cancellation date:28.01.2021 07:59
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Look in the TK.
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk

2. Place of work:
The territory of EPM-NEZ JSC is an operating enterprise.

3. Objects (technical device).
Industrial four-section direct heating furnace No. 2 (Kastner) has dimensions in terms of 14840X26550mm, height to the top of structures is 2900mm.
Furnace design:
- the base is a monolithic reinforced concrete foundation;
- combined walls: prefabricated reinforced concrete and steel welded.

4. Purpose of the work:
Construction of a four-section direct heating furnace No. 2 (Kastner).

5. List and scope of project sections to be performed:
5.1. Implementation of a full complex of construction and installation work according to the sections of the project, taking into account all the sets included in its composition of projects - * reference and borrowed drawings:
• PCh 13795-SB-Furnace constructions;
• ST (PCh) -13795-KZh Furnace foundation;
• 020-013 / 858-YuU-KZh-Zh / b and metal structures, perceiving the force of the hydraulic cylinders of the 4-section direct heating furnace No. 2 (Kastner).
• AK 035.13795-Control of graphitization parameters;
• VK 010.13795-Cooling of current leads;
• НС 10141- Additional sheet to the insert for BT-2 (perform only the completion of the formwork according to the changes made to the drawing);
• НС 13795.03-Oven shelter umbrella;
• НС 13795.07- Clamping device except for the drawings included in its composition:
НС10056.01- Hydraulic cylinder; НС13795.07.05-Small water-cooled plate left; НС13795.07.07 - Water-cooled right plate; НС13795.07.08- Left water-cooled plate; НС13795.07.12-Water-cooled end plate.
• NS 13811 SB-Formwork of BI-2 block-insulator;
• NS 13812 SB-Formwork for the end block BLT-1;
• NS 13842 SB-Formwork of BI-1 block-insulator;
• NS 13843 SB-Formwork of the end block BLT-3 - is being finalized according to the drawing (details are highlighted in dark);
• NS 13854 SB-Formwork of the end block BLT-4;
• ОВ 020.13795-Furnace ventilation;
• ST (TK) 13795-Channel for hydraulic distribution;
• ST (EL) 13795 KM 1-Furnace busbars;
• ST (EL) 13795 KM 2-Metal box;
• TC 13795 - Hydraulics;
• EL 003.13795- MCH Control of hydraulic cylinders;
5.2. The basis for calculating the cost of work is the scope of work, sections of the project specified in clause 5.1. with the projects included in it and this TK. The contractor independently develops the estimate documentation. The work provided for by the project and this TOR and not reflected in the estimate documentation cannot be considered additional.
If it is necessary to perform additional work that is not provided for in this assignment, the Contractor performs them according to a separate assignment of the Customer with the preparation of an estimate with indices and coefficients used in the estimate for the implementation of the main volume of work provided for in this assignment.
The contractor primarily performs work according to the sections of the project:
• NS 13811 SB-Formwork of BI-2 block-insulator;
• NS 13812 SB-Formwork for the end block BLT-1;
• NS 13842 SB-Formwork of BI-1 block-insulator;
• NS 13843 SB-Formwork of the end block BLT-3 - is being finalized according to the drawing (details are highlighted in dark);
• NS 13854 SB-Formwork of the end block BLT-4;
• НС 10141- Additional sheet to the insert for BT-2 (perform only the completion of the formwork according to the changes made to the drawing);
For the transfer of the formwork to the SHRU and the further manufacture of reinforced concrete products used in the construction of the furnace.
6. Supply of materials and construction equipment for work.
6.1. The work is performed using the material and equipment of the Contractor, with the exception of:
Parts made of graphite, copper plates, hydraulic cylinders, precast reinforced concrete, commercial refractory concrete.
6.2. Construction and lifting equipment, installation equipment, mechanisms for loading work, tools and all consumables for them (oxygen, propane, auxiliary materials), PPE, electric welding, gas-cutting and other equipment necessary for the work is provided by the Contractor.
The overhead crane is provided by the Customer at the request of the Contractor, the operator of the overhead crane is provided by the Contractor.
6.3. Removal of garbage of all categories to landfills for receiving industrial waste is carried out by transport provided by the Customer, upon the preliminary request of the Contractor. The costs for the disposal of garbage of all categories, at landfills for receiving industrial waste, are borne by the Customer.
6.4. Garbage loading is carried out by the forces and mechanisms of the Contractor.
6.5. In case of justified comments to the personnel on the quality of work performed, violation of safety regulations, as well as administrative violations, at the request of the Customer's specialists, the Contractor is obliged to immediately replace these employees.

7. Terms of work: 6 months.

8. Acceptance:
The works on the construction of the furnace are considered to be completed in full after the signing by the "Parties" of the Acts of Acceptance of the Works Completed KS-2; KS-Z and delivery of executive documentation in accordance with clause 12.7.

9. Warranty obligations for the work performed:
- 12 months from the date of completion of the work performed.

10. Requirements for the submitted proposals.
The contractor must indicate in the TCH the terms of work, the cost of work, and
See also payment terms.

11. Applications.
Technical documentation (project according to the list in clause 5.1.)
- Arrangement of furnaces No. 1 and No. 2;

12.Requirements to the Contractor
12.1. The contractor must have the necessary production and human resources to carry out this work, be a member of a self-regulatory organization (SRO).
12.2. To clarify the conditions for the performance of work, familiarization with the object, it is desirable that the representatives of the Contractor arrive at the Customer.
12.3. The contractor in his commercial offer indicates the procedure for payment for work and other conditions.
12.4. Certification of the head, engineering technician and executors for industrial safety and labor protection at HIFs according to Appendix No. 1.
12.5. Provision of health and safety measures, safe work methods at the facility.
12.6. Before issuing a work permit for work, the Contractor is obliged to provide the Customer with the following documents: copies of documents confirming the presence of a labor protection service and / or a labor protection specialist in the contractor organization (order for appointment to a position in the contractor organization, certificate of a labor protection specialist) or availability of an agreement with an accredited organization in the field of labor protection services.
12.7. After the completion of the work, the contractor hands over to the customer the as-built documentation in accordance with RD-11-02-2006 dated 26.12.06. and other regulatory documents.
12.8. Provision of warranty obligations for at least 12 months.
12.9. Employees involved in the performance of work must have professional training corresponding to the nature of the work with a mark in a special certificate of training and passing examinations in certification commissions.

13. Work safety
When performing work, the contractor must comply with the requirements of the following rules:
- labor protection rules during the operation of electrical installations;
- rules for the technical operation of electrical installations of consumers;
- safety rules for hazardous production facilities where - lifting structures are used;
- electrical installation rules;
- fire safety rules;
- rules for labor protection when working at height POT RM-012-200;
- rules of environmental, sanitary and hygienic and other norms in force on the territory of the Russian Federation and to ensure safe working conditions for the life and health of people.
For the performance of work, the contractor must undergo an introductory briefing. All work performed on the territory of EPM-NEZ JSC must be carried out in accordance with the regulation "On the use of permit orders in the performance of high-risk work at EPM-NEZ JSC".

Appendix # 1:
The list of documents to be submitted to the health and safety department for registration of orders - permits for work by contractors:
1. A copy of the Certificate (SRO) for the right to perform this type of work.
2. A copy of the OSH briefing from the briefing journal.
3. POR, PPR or RTI (if required).
4. Copy of the protocol of certification of workers for labor protection.
5. Copies of certificates of attestation of engineers and technicians for labor protection and general industrial safety requirements. When performing work on gas, on vessels operating under pressure, using PS, in electrical installations, during hot work - copies of certificates for each type of work.
6. Medical clearance of personnel.
7. Copies of certificates of gas-electric welders, slingers, crane drivers, hoists (towers). For gas-electric welders - copies of certification protocols for the fire-technical minimum.
8. Before issuing a work permit for work, the Contractor is obliged to provide the Customer with the following documents: copies of documents confirming the presence of a labor protection service and / or a labor protection specialist in the contractor organization (order for appointment to a position in the contractor organization, certificate of a labor protection specialist) or availability of an agreement with an accredited organization in the field of labor protection services. All employees of the contractor, including managers, are required to undergo an introductory briefing at the OTPB and GO (you must have a document confirming your identity and age). When performing work, all employees must have certified clothing, footwear and other personal protective equipment necessary to perform this type of work
9. In case of revealing inconsistencies of the information in the submitted documents with the requirements of regulatory legal acts, the Customer has the right to initiate an audit by the H&S service in matters of Labor Protection and Industrial Safety in the Contractor's organization.
Note: In case of expiration of any document, the work permit
not issued until a new document is submitted.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Tax registration certificate.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with the tax authority's mark of acceptance.
6. Documents confirming the authority of the representative to sign documents:
- Decision (Protocol).
- Power of attorney.
7. Work proposal (see the file "Work proposal")
8. Contact faces:
Investment Projects Director - Maxim Mikhailovich Naprasnik
Tel. 8 (8635) 29-48 36 mnaprasnik@energoprom.ru
Ved. construction supervision engineer - Oleg Vyacheslavovich Veliky
Tel. 8 (8635) 29-43-98 OVelikiy@energoprom.ru
9. Certificate of Compliance with ISO 9001: 2008 (if applicable)
This request is not a notice of a tender or auction and does not give any rights to the participants, does not entail the emergence of any obligations other than those expressly indicated in the notice.
10. Requirements for the performer:
- Permitting documents (SRO, licenses, permits).
- Development by the contractor of PPR, PPRK, RTI.
- Availability of attestation of the head, engineering technician, industrial safety workers at HIF.
- Availability of medical clearance of personnel to work at HIF.
—Before issuing a work permit for work, the Contractor is obliged to provide the Customer with the following documents: copies of documents confirming the availability of a labor protection service and / or a labor protection specialist in the contractor (order for appointment to a position in the contractor, certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services.
To consider the application, it is MANDATORY to provide a commercial proposal.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.

Organizer has decided to cancel the call for bids.
Call for bids cancellation date: 28.01.2021 at 07:59.
call for bids cancellation reason:

Сокращение сроков

Signed with e-signature
Total bids: 0