Request for Proposals No. 1056406 the tariffs for the design and construction of complex projects
No. | Lot No. | Name | Quantity | Unit of measure | Per unit price (show both prices) | Total limit price (show both prices) | Number of bidders |
1 | 1 | FEAST inside the building (closet): 1. Conducting a survey. 2. Working papers. 3. Harmonization of working documentation with the representative of the owner. 4. Harmonization of working documentation COMCOR. | 1 | проект | Price not specified | Price not specified | 6 |
2 | 1 | preparation/negotiation of Executive documentation (without project) inside the building (closet): 1. Prepare Executive documentation. 2. Harmonization documentation with the representative of the owner. 3. Harmonization documentation with COMCOR. 4. Commissioning. | 1 | ИД | Price not specified | Price not specified | 6 |
3 | 1 | PIR horizontal cable subsystem (copper jumper) inside the building, coaxial lines: 1. Conducting a survey. 2. Working papers. 3. Harmonization of working documentation with the representative of the owner. 4. Harmonization of working documentation with representatives of owner (if there are several), tenants on track laying cable. 5. Harmonization of working documentation COMCOR. | 1 | проект | Price not specified | Price not specified | 6 |
4 | 1 | preparation/negotiation of Executive documentation (without project) horizontal cable subsystem (HCOC, copper jumper) inside the building, coaxial lines: 1. Prepare Executive documentation. 2. Harmonization documentation with the representative of the owner. 3. Harmonization documentation with COMCOR. 4. Harmonization documentation with representatives of owner (if there are several), tenants on track laying cable. 5. Harmonization documentation with COMCOR. 6. Commissioning. | 1 | ИД | Price not specified | Price not specified | 6 |
5 | 1 | feasting on street video surveillance, Wi-Fi, radio bridges were aired: 1. Definition of locations cameras, Wi-Fi, a subset of Radiomost, review/coverage which will meet the requirements of the customer. 2. Definition of placements that meets the requirements of the Cabinet along the length of the line. 3. Definition of location e. food, Inc. with the assistance of an electrician from the management company (the owner, landlord, etc.). 4. Survey of road laying e. cable, grounding, placement machines. 5. Survey of road laying UTP, placements, boxes, trays, etc. 6. Rendering/digitizing (Visio) plans, forming a bundle TP/project. 7. Reconciling TR/project with COMCOR. 8. Harmonization of TR/project with the owners involved in the project buildings, territories, organizations serving the building and grounds. 9. Upon completion of training, ID matching with the owners involved in the project buildings, territories, organizations serving the building and grounds, COMCOR. floor Cabinet Installation | 1 | проект | Price not specified | Price not specified | 6 |
6 | 2 | more 6U: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Installation of justification. 4. Cabinet Assembly (if needed). 5. Installation of the base. 6. Installation guides. 7. Installation of the fan. 8. Installation of shelves. 9. Installation of cable organizers. 10. Mounting patch panels. 11. Mounting Sockets. 12. Installation of sensors (temperature, discovery, etc.). 13. Wiring for electrical engineering (inside Cabinet). 14. Verify that e. elements of the Cabinet. 15. Installation of grounding bus. 16. Grounding of all designs. 17. Marking. 18. Renting works Manager (technical supervision). 19. Renting works service operation. | 1 | шт. | Price not specified | Price not specified | 7 |
7 | 2 | Installation cupboard more 6U: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Drilling in concrete/brick wall. 4. Cabinet Assembly (if needed). 5. Mounting on the wall. 6. Installation guides. 7. Installation of the fan. 8. Installation of shelves. 9. Installation of cable organizers. 10. Mounting patch panels. 11. Mounting Sockets. 12. Installation of sensors (temperature, discovery, etc.). 13. Wiring for electrical engineering (inside Cabinet). 14. Verify that e. elements of the Cabinet. 15. Installation of grounding bus. 16. Grounding of all designs. 17. Marking. 18. Renting works Manager (technical supervision). 19. Renting works service operation. floor Cabinet Installation | 1 | шт. | Price not specified | Price not specified | 7 |
8 | 2 | 6U and less: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Installation on the floor. 4. Marking. 5. Renting works Manager (technical supervision). 6. Renting works service operation. wall unit Mounting | 1 | шт. | Price not specified | Price not specified | 7 |
9 | 2 | 6U and less: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Drilling in concrete/brick wall. 4. Mounting on the wall. 5. Marking. 6. Renting works Manager (technical supervision). 7. Renting works service operation. Cabinet Dismantle | 1 | шт. | Price not specified | Price not specified | 7 |
10 | 2 | electrical supply from | 1 | шт. | Price not specified | Price not specified | 7 |
11 | 2 | ASE to the Cabinet: 1. Materials: cable ВВГнг and RO-3; gofroshlang; hose; Boxing; machines; box; sleeves, foam/sealant; izoljacilnnyj material; couplers; clips; Tips; the corners of the box, etc. 2. CMP: drilling-overlapping/Ext. Wall; ogilzovka, sealing the holes; tightening the cable ВВГнг, PV-3 in gofroshlang/hose; Disassembly/Assembly raised the stream; installation of cable for podvalnomu/gofroshlange/placement has the metal hose with clips, clamps to existing structures; installation of cable in gofroshlange for suspended ceiling with clips; installation of cable in gofroshlange on the duct; mounting boxes and cables; installation of boxing on the wall; installation of machine in boxing; machine installation in the Wardrobe (ASE); Cat6 patch cables, connection to circuit breakers, grounding; connect an existing block of sockets to slot (installed in boxing); marking-near Cabinet, holes in walls, inlet/outlet in riser with inlet/outlet; measurement (electric laboratory). electrical supply from storey | 1 | 50 м | Price not specified | Price not specified | 7 |
12 | 2 | fence/the nearest outlet to the Cabinet: 1. Materials: cable ВВГнг and RO-3; gofroshlang; hose; plastic box; machines; box; sleeves; foam/sealant; izoljacilnnyj material; couplers; clips; Tips; the corners of the box, etc. 2. CMP: drilling-overlapping; ogilzovka, sealing the holes; delaying ВВГнг, PV-3 in gofroshlang/hose; Disassembly/Assembly raised the stream; installation of cables in gofroshlange for suspended ceiling with clips; installation of cable in gofroshlange on the duct; mounting boxes; installation of cables in the box; installation of boxing on the wall; installation of machine in boxing; machine installation in the Wardrobe (ASE); Cat6 patch cables, connection to circuit breakers, grounding; connect an existing block of sockets to slot (installed in boxing); marking-near Cabinet, holes in walls, inlet/outlet in riser with inlet/outlet; measurement (electric laboratory). installing the switch/ | 1 | 15 м | Price not specified | Price not specified | 7 |
13 | 2 | equipment identical to constructs in the closet: 1. Getting equipment in stock COMCOR. 2. Unpacking, verifying the integrity and conformity to specifications. 3. Mounting "ears". 4. Cabinet installation guides (or mounting shelves). 5. Connect the power supply to the power sockets/mounting box. 6. Incorporation, validation test. | 1 | шт. | Price not specified | Price not specified | 7 |
14 | 2 | Installation switch/equipment identical to constructs in the closet with rasshivkoj on patch panel: 1. Getting equipment in stock COMCOR. 2. Unpacking, verifying the integrity and conformity to specifications. 3. Mounting "ears". 4. Cabinet installation guides (or mounting shelves). 5. Connect the power supply to the power sockets/mounting box. 6. Incorporation, validation test. 7. Installation of the patch panel. 8. Attaching regular cable up to 48 ports. | 1 | шт. | Price not specified | Price not specified | 7 |
15 | 2 | Dismantling switch/equipment identical to design out of the closet | 1 | шт. | Price not specified | Price not specified | 7 |
16 | 2 | mounting the ups in a cabinet with conducting regular checks: 1. Getting equipment in stock COMCOR. 2. Unpacking, verifying the integrity and conformity to specifications. 3. Mounting "ears" support for heavy equipment. 4. Cabinet installation guides (or mounting shelves). 5. Connect the power supply to the power sockets/mounting box. 6. Incorporation, validation test. | 1 | шт. | Price not specified | Price not specified | 7 |
17 | 2 | Dismantling the UPS from the closet | 1 | шт. | Price not specified | Price not specified | 7 |
18 | 3 | Installation HCOC (copper jumper-to 90 m): 1. Installation of the ducts in the premises of the customer. 2. Punching with ogilzovkoj and sealed. 3. Installation of the ducts in the premises of the connection point. 4. Disassembly/Assembly suspended ceiling. 5. Delay in gofroshlang cable, cabling in gofroshlange behind the false ceiling with clips to the ceiling/wall. 6. Laying of cable in the box. 7. Cabling in the closet (mount point). 8. Cat6 patch cables with the connection to the pop. 9. Raskljuchka cable outlet. 10. Mounting the socket in the box. 11. Measurement (electric laboratory). 12. Preparation of photo. 13. Presentation of the work done for the owner of the building, to the client. | 1 | шт. | Price not specified | Price not specified | 7 |
19 | 3 | supplement for 1 m of the HCOC (over 90 m) sake Installation Wi-Fi access points inside the building with the ceiling/wall but Radiomost's Installation (2 full sets): 1. Mounting brackets (roof). 2. Equipment mounting brackets. | 1 | м | Price not specified | Price not specified | 7 |
20 | 4 | {25} | 1 | шт. | Price not specified | Price not specified | 6 |