Request for Proposals No. 1056406 
the tariffs for the design and construction of complex projects

No.Lot No.NameQuantityUnit of measurePer unit price
(show both prices)
Total limit price
(show both prices)
Number of bidders
11FEAST inside the building (closet): 1. Conducting a survey. 2. Working papers. 3. Harmonization of working documentation with the representative of the owner. 4. Harmonization of working documentation COMCOR.1проектPrice not specifiedPrice not specified6
21preparation/negotiation of Executive documentation (without project) inside the building (closet): 1. Prepare Executive documentation. 2. Harmonization documentation with the representative of the owner. 3. Harmonization documentation with COMCOR. 4. Commissioning.1ИДPrice not specifiedPrice not specified6
31PIR horizontal cable subsystem (copper jumper) inside the building, coaxial lines: 1. Conducting a survey. 2. Working papers. 3. Harmonization of working documentation with the representative of the owner. 4. Harmonization of working documentation with representatives of owner (if there are several), tenants on track laying cable. 5. Harmonization of working documentation COMCOR.1проектPrice not specifiedPrice not specified6
41preparation/negotiation of Executive documentation (without project) horizontal cable subsystem (HCOC, copper jumper) inside the building, coaxial lines: 1. Prepare Executive documentation. 2. Harmonization documentation with the representative of the owner. 3. Harmonization documentation with COMCOR. 4. Harmonization documentation with representatives of owner (if there are several), tenants on track laying cable. 5. Harmonization documentation with COMCOR. 6. Commissioning.1ИДPrice not specifiedPrice not specified6
51feasting on street video surveillance, Wi-Fi, radio bridges were aired: 1. Definition of locations cameras, Wi-Fi, a subset of Radiomost, review/coverage which will meet the requirements of the customer. 2. Definition of placements that meets the requirements of the Cabinet along the length of the line. 3. Definition of location e. food, Inc. with the assistance of an electrician from the management company (the owner, landlord, etc.). 4. Survey of road laying e. cable, grounding, placement machines. 5. Survey of road laying UTP, placements, boxes, trays, etc. 6. Rendering/digitizing (Visio) plans, forming a bundle TP/project. 7. Reconciling TR/project with COMCOR. 8. Harmonization of TR/project with the owners involved in the project buildings, territories, organizations serving the building and grounds. 9. Upon completion of training, ID matching with the owners involved in the project buildings, territories, organizations serving the building and grounds, COMCOR. floor Cabinet Installation1проектPrice not specifiedPrice not specified6
62more 6U: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Installation of justification. 4. Cabinet Assembly (if needed). 5. Installation of the base. 6. Installation guides. 7. Installation of the fan. 8. Installation of shelves. 9. Installation of cable organizers. 10. Mounting patch panels. 11. Mounting Sockets. 12. Installation of sensors (temperature, discovery, etc.). 13. Wiring for electrical engineering (inside Cabinet). 14. Verify that e. elements of the Cabinet. 15. Installation of grounding bus. 16. Grounding of all designs. 17. Marking. 18. Renting works Manager (technical supervision). 19. Renting works service operation.1шт.Price not specifiedPrice not specified7
72Installation cupboard more 6U: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Drilling in concrete/brick wall. 4. Cabinet Assembly (if needed). 5. Mounting on the wall. 6. Installation guides. 7. Installation of the fan. 8. Installation of shelves. 9. Installation of cable organizers. 10. Mounting patch panels. 11. Mounting Sockets. 12. Installation of sensors (temperature, discovery, etc.). 13. Wiring for electrical engineering (inside Cabinet). 14. Verify that e. elements of the Cabinet. 15. Installation of grounding bus. 16. Grounding of all designs. 17. Marking. 18. Renting works Manager (technical supervision). 19. Renting works service operation. floor Cabinet Installation1шт.Price not specifiedPrice not specified7
826U and less: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Installation on the floor. 4. Marking. 5. Renting works Manager (technical supervision). 6. Renting works service operation. wall unit Mounting1шт.Price not specifiedPrice not specified7
926U and less: 1. Receiving equipment/materials in stock COMCOR. 2. Unpacking, checking integrity. 3. Drilling in concrete/brick wall. 4. Mounting on the wall. 5. Marking. 6. Renting works Manager (technical supervision). 7. Renting works service operation. Cabinet Dismantle1шт.Price not specifiedPrice not specified7
102electrical supply from1шт.Price not specifiedPrice not specified7
112ASE to the Cabinet: 1. Materials: cable ВВГнг and RO-3; gofroshlang; hose; Boxing; machines; box; sleeves, foam/sealant; izoljacilnnyj material; couplers; clips; Tips; the corners of the box, etc. 2. CMP: drilling-overlapping/Ext. Wall; ogilzovka, sealing the holes; tightening the cable ВВГнг, PV-3 in gofroshlang/hose; Disassembly/Assembly raised the stream; installation of cable for podvalnomu/gofroshlange/placement has the metal hose with clips, clamps to existing structures; installation of cable in gofroshlange for suspended ceiling with clips; installation of cable in gofroshlange on the duct; mounting boxes and cables; installation of boxing on the wall; installation of machine in boxing; machine installation in the Wardrobe (ASE); Cat6 patch cables, connection to circuit breakers, grounding; connect an existing block of sockets to slot (installed in boxing); marking-near Cabinet, holes in walls, inlet/outlet in riser with inlet/outlet; measurement (electric laboratory). electrical supply from storey150 мPrice not specifiedPrice not specified7
122fence/the nearest outlet to the Cabinet: 1. Materials: cable ВВГнг and RO-3; gofroshlang; hose; plastic box; machines; box; sleeves; foam/sealant; izoljacilnnyj material; couplers; clips; Tips; the corners of the box, etc. 2. CMP: drilling-overlapping; ogilzovka, sealing the holes; delaying ВВГнг, PV-3 in gofroshlang/hose; Disassembly/Assembly raised the stream; installation of cables in gofroshlange for suspended ceiling with clips; installation of cable in gofroshlange on the duct; mounting boxes; installation of cables in the box; installation of boxing on the wall; installation of machine in boxing; machine installation in the Wardrobe (ASE); Cat6 patch cables, connection to circuit breakers, grounding; connect an existing block of sockets to slot (installed in boxing); marking-near Cabinet, holes in walls, inlet/outlet in riser with inlet/outlet; measurement (electric laboratory). installing the switch/115 мPrice not specifiedPrice not specified7
132equipment identical to constructs in the closet: 1. Getting equipment in stock COMCOR. 2. Unpacking, verifying the integrity and conformity to specifications. 3. Mounting "ears". 4. Cabinet installation guides (or mounting shelves). 5. Connect the power supply to the power sockets/mounting box. 6. Incorporation, validation test.1шт.Price not specifiedPrice not specified7
142Installation switch/equipment identical to constructs in the closet with rasshivkoj on patch panel: 1. Getting equipment in stock COMCOR. 2. Unpacking, verifying the integrity and conformity to specifications. 3. Mounting "ears". 4. Cabinet installation guides (or mounting shelves). 5. Connect the power supply to the power sockets/mounting box. 6. Incorporation, validation test. 7. Installation of the patch panel. 8. Attaching regular cable up to 48 ports.1шт.Price not specifiedPrice not specified7
152Dismantling switch/equipment identical to design out of the closet1шт.Price not specifiedPrice not specified7
162mounting the ups in a cabinet with conducting regular checks: 1. Getting equipment in stock COMCOR. 2. Unpacking, verifying the integrity and conformity to specifications. 3. Mounting "ears" support for heavy equipment. 4. Cabinet installation guides (or mounting shelves). 5. Connect the power supply to the power sockets/mounting box. 6. Incorporation, validation test.1шт.Price not specifiedPrice not specified7
172Dismantling the UPS from the closet1шт.Price not specifiedPrice not specified7
183Installation HCOC (copper jumper-to 90 m): 1. Installation of the ducts in the premises of the customer. 2. Punching with ogilzovkoj and sealed. 3. Installation of the ducts in the premises of the connection point. 4. Disassembly/Assembly suspended ceiling. 5. Delay in gofroshlang cable, cabling in gofroshlange behind the false ceiling with clips to the ceiling/wall. 6. Laying of cable in the box. 7. Cabling in the closet (mount point). 8. Cat6 patch cables with the connection to the pop. 9. Raskljuchka cable outlet. 10. Mounting the socket in the box. 11. Measurement (electric laboratory). 12. Preparation of photo. 13. Presentation of the work done for the owner of the building, to the client.1шт.Price not specifiedPrice not specified7
193supplement for 1 m of the HCOC (over 90 m) sake Installation Wi-Fi access points inside the building with the ceiling/wall but Radiomost's Installation (2 full sets): 1. Mounting brackets (roof). 2. Equipment mounting brackets.1мPrice not specifiedPrice not specified7
204{25}1шт.Price not specifiedPrice not specified6

Next page >>
1  2