Current repair of coal trenches No. 1, No. 2 at the KHP of Ural Steel JSC from 06/01/14 to 10/31/14. Contractor's materials. Estimates. the cost in 2001 prices = 162,204 rubles. Disassembly of railway structures, preparation and application of non-shrinking, fast-hardening compounds, cargo transportation by dump trucks g/n 10 t.Collapse
Products/ services category according to Activities Classification:
UC2 Услуги строительно-монтажные
Участники закупки:
Все поставщики
OKPD2 category:
Show all (9 more)
43.39 Работы завершающие и отделочные в зданиях и сооружениях, прочие
43.31.10.120 Работы по облицовке стен листами сухой штукатурки, обычно гипсовыми
43.39.1 Работы завершающие и отделочные в зданиях и сооружениях, прочие
43.39.19 Работы завершающие и отделочные в зданиях и сооружениях прочие, не включенные в другие группировки
43.39.19.190 Работы завершающие и отделочные в зданиях и сооружениях, прочие, не включенные в другие группировки
43.99 Работы строительные специализированные, не включенные в другие группировки
43.99.4 Работы бетонные и железобетонные
43.99.40 Работы бетонные и железобетонные
43.99.40.110 Работы по укладке бетонной смеси
43.99.40.140 Работы по монтажу железобетонных конструкций (каркасов) зданий и сооружений, требующие специальной квалификации или оборудования из-за размера конструкций или метода строительства
43.99.40.190 Работы бетонные и железобетонные прочие, не включенные в другие группировки
43.99.90 Работы строительные специализированные, не включенные в другие группировки
Bidders can submit their proposals for certain lots of the call for bids, but necessarily for all the items within a selected lot
:
Not applicable. Proposal shall cover all the items of the selected lots
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing per unit price for each item from their previously submitted proposal.
:
1 RUB
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
:
30 minutes
Payment terms:
It is preferable to pay 100% upon the fact of services rendered with a delay of 60 k.d
. In case of advance payment, take into account the provision of a bank guarantee.
We are ready to consider the Bidder's suggestions.
Delivery terms:
According to the Requirements Specification, the draft contract and the estimates of the KHP-VD-27-1043- LS, KHP-VD-27-1044- HP
Comments: 1. It is necessary to attach all the required documents (completed Appendices 1-6, a list of documents confirming the qualifications of personnel and work experience in accordance with p 14 Requirements Specifications, as well as documents confirming the availability of a dump truck g/p 10 tons, and fill in the tabular part of the E-Marketplaces).
2. The proposal must strictly comply with the data indicated on the electronic platform. If the data in the attached Technical and Commercial Proposal and the completed electronic form on the site do not match, the electronic form takes precedence. In case of non-compliance with the above requirements, the Technical and Commercial Proposal will be rejected.
3. Ural Steel JSC uses electronic document management (EDI) with its partners and customers in the system of Diadocs (http://www.diadoc.ru ) SKB Kontur company. Please note that, all other things being equal, preference may be given to a supplier using electronic document management systems.
4. Bids will be considered only from accredited suppliers (accreditation No. 396, Questionnaire on Occupational Safety and Industrial Safety No. 645). Link to the list of accreditations https://www.b2b-center.ru/personal/accreditation_suppliers/?
action=&keyword=&search=%D0%9F%D0%BE%D0%B8%D1%81%D0%BA.
5. In case of winning the tender with the Bidder, the possibility of concluding an Agreement on EDI is being considered (the draft is attached to the Call for Bidding), as well as the conclusion of an Agreement on ensuring Production Safety (the draft is attached to the Call for Bidding, it must be signed when submitting the Technical and Commercial Proposal).
6. For filling out the bidding documentation, please contact: Aliya Baykhanova a.baihanova@uralsteel.com , tel.: +7(3537) 66-20-05.
For technical issues of the Requirements Specification, it is necessary to use the Requests for Clarification tab on the E-Marketplace.
For questions related to filling out the E-Marketplaces interface, please contact the B2B-Center Platform support service:
tel.: +7(495) -989-85-19 ( ext. 7610, 7620), 8-800-555-85-19
7. In accordance with the B2B-Center Platform System Regulations (Section II, Chapter 8, clause 8.10(1)): The Bidder who meets the requirements of the request for proposals and offers the best conditions for the execution of the contract according to the set of criteria established by the documentation of this request for proposals becomes the winner of the request for proposals.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.