Request for Proposals No. 2570346 
Heating equipment / Gas station equipment When forming a commercial proposal, it is imperative to take into account positional delivery. In the commercial proposal, it is necessary to indicate the price with and without delivery.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Total price:Price not specified
Contract award criteria:Price incl. VAT (show both prices)
Currency:RUB
Publication date:
Bid submission deadline:11.02.2021 10:13 (was extended by 13 min, 44 sec)
Last edited:08.02.2021 08:41
Organizer (Initiator):POLYMETAL TRADING, LTD
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:100% post payment upon receipt of the corresponding batch of goods and materials at the intermediate warehouse of the TD in Aldan within 10 banking days (upon receipt by the Buyer of the originals of the transfer documents).
Delivery terms:By the supplier to the intermediate warehouse TD in Aldan
Georeferencing:Republic of Sakha (Yakutia), Aldansky ulus, Aldan, Promyshlennaya str., 25
Comments:
1) Please note, that participation in the bidding implies agreement with the Buyer’s contract form.
2) Be sure to attach a commercial proposal in electronic form.
3) Commercial proposal shall specify the product manufacturer, product availability, production time, time of delivery to the Supplier's warehouse, cargo dimensions (weight, volume, number of containers), dispatching point;
4) Products shall be new, unused;
5) Be sure to attach the conformity certificates, passport, quality
certificate;
6) Before shipment, be sure to fill out a packing list (see example in procurement
documentation), stick packing list on the packaging of the supplied products, copies of documents shall be sent to the customer by e-mail.
This procedure of request for proposals is not a tender, it is not subject to Articles 447-449, Section 1, Civil Code of the Russian Federation; this procedure is not a public tender, it is not subject to Articles 1057-1061, Section 2, Civil Code of the Russian Federation; Thus, this procedure does not impose the corresponding amount of civil obligations on the Customer, and the Customer reserves the right to refuse all the received proposals for any reason, or to terminate the selection procedure at any time, without incurring any liability before the participants.
Submitted commercial proposal shall specify:
1) Products cost and delivery cost (separately);
2) Conformity certificates;
3) Reference to the manufacturer;
4) Payment terms;
5) Delivery term;
6) Supplier's relation to the supplied products (manufacturer, free seller, official dealer);
7) Warranty.
8) Full compliance of the name of goods and materials in commercial offers (hereinafter in the shipping documents) requested in the purchase.
9) The requirement to observe the temperature regime when transporting cargo in the Far North
10) Responsible - Anatoly A. Malyshev. Tel. +7 (4112) 26-31-82, ext. 214
MalyshevAA@polymetal.ru
The design of the package (shipping container) must provide the ability to transport goods by any mechanical device, including a forklift, cranes, trolleys or manual manipulation, depending on the dimensions and weight of the cargo (goods). The design of the package should be made in such a way as not to impede free access to the contents of the package.
Rolled metal (pipes, fittings, corners, sheets, etc.) must be securely tied (wire, wire rod or metal tape) into bundles (packages). A bundle of packages must withstand the weight of the load in a bundle during loading and unloading operations and exclude the loss of rolled metal from the bundle.
Each package must have a UL (or a factory label from the manufacturer).
Also, in order to prevent shortage of goods and materials during delivery, UL with complete data (weight, number of pieces in 1 place) - on the list of goods and materials that cannot be visually calculated in the cut (pipe, channel, etc.).

MANDATORY COMPLIANCE WITH PACKING ACCORDING TO RECOMMENDATION FOR CARGO TRANSPORTATION IN RKS
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 24.02.2021 at 07:52
and selected winners:
  • OOO "REGIONSTROIKOMPLEKT" – (Bidder 3) (Исаченко Е.Л.) submitting a bid dated of 11.02.2021 06:43 totalling to 1 035 054,32 RUB (price incl. VAT)
    for items No. 1-8
  • "SibPromResurs" OOO – (Bidder 7) (Подхалюзин А.) submitting a bid dated of 11.02.2021 13:37 totalling to 42 000,00 RUB (price incl. VAT)
    on Item No. 9
Обоснование: по наименьшей цене.
Notifications have been sent to bidders.
Total bids: 7. More >>