Request for Proposals No. 1283018 
Reinforcement of carrier column and beam, as well as drainage from the floor slab

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Reinforcement of carrier column and beam, as well as drainage from the floor slab

OKPD2 category:
41.10.10.000  Документация проектная для строительства
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:03.07.2019 10:00
Last edited:01.07.2019 08:46
Organizer (Initiator):\"TD TsUM\" OAO
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
:
30 minutes
Payment terms:Payment terms are discussed, advance payment is required. All costs must be included.
Delivery terms:The works are carried out in the territory of a functioning shopping complex. Work on the street def. The shvu will be carried out in 2 captures. Border grapple - the existing catchment tray.
Georeferencing:Московская область, Одинцовский район
Comments:
I draw attention to the fact that it is necessary to fill two estimates in strict accordance with the attached forms, made on the basis of the taxiways: the first estimate for work from the parking lot, the second for work from the street. The total cost must be specified as the sum of two estimates. The fence of the construction site is provided by the Customer.
Together with the estimates it is necessary to provide documents on the organization set out in the "List of required documents for certification."
Inspection of the front of work on site is possible on any weekday, from 9:00 to 18:00, by prior call
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 0