Request for Proposals No. 1060741 
Installation of meter station for heat energy, hot and cold water OAO Energoprom - Novocherkassk electrode plant

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Installation of meter station for heat energy, hot and cold water
OAO Energoprom - Novocherkassk electrode plant

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:09.08.2018 17:04 (was extended by 4 min, 17 sec)
Last edited:08.08.2018 13:56
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:in fact of fulfilled works.
Delivery terms:1. Request of OAO ENP-NEP, Novocherkassk
11. Node requirements accounting.
11.1. Meter station shall ensure measurement and recording the data on the amount of heat energy, hot and cold water consumed by the building (facilities), including for heating, cold and hot water supply according to the Rules of tracking of heating energy and heat conductor consumption" and consumption of cold water in compliance with the Rules of using public water supply and sewerage systems in the Russian Federation".
2.1. Technical heat energy accounting tools, coolant and cold water consumption (hereinafter TA) should be included in the State Register of measuring instruments, have Svedetelstvo of the Federal Agency for metrology.
11.2. The TC must provide reliable measurement, definition and indication of current values of the flow, temperature, pressure, thermal energy, time (defined by the Gosstandart certificates for measuring instruments) and archiving results measurements and calculations.
Output of measurement results, archived information, information about emergency situations with teplovychislitelej shall be provided in the automatic mode, with the possibility of withdrawing the information through an automated information system (hereinafter referred to as AIS) resursosnabzhajushhej organization.
11.3. AIS should ensure the protection of the information from the accounting node device against unauthorized access.
11.4. The TC must ensure smooth operation, including measurement of the heat transfer medium and object of consumption calculation of thermal energy and the coolant in the following modes of operation system of heat supply and heat consumption:
- normal normal;
- When feasible coolant costs in pipelines, including when in reverse flow pipelines exceeds consumption in feed (e.g., in ring heating systems, connecting generating capacity, with possible change the flow direction, etc.).
2.5. MC on one node must have one heat accounting for heat supply schemes on heating and dhw systems when 4-x pipe system heat networks and input 1-pipe cold water supply scheme.
2.6. Primary converters of the flow meters shall have valid hydraulic losses.
2.7. When you install the TS accounting in existing heating systems should be provided with the minimum amount of change of the heat supply system of a building associated with the installation of TS.
2.8. The dismantling of the VEHICLE for checking should be carried out without removing the cables attached to the hardware.
2.9. Teploschetchika calibration interval should be not less than 4 years.
2.10. Mean time between failures (MTBF) teploschetchika shall be not less than 20000 hours.
2.11. The service life of the teploschetchika must be at least 12 years.
3. Data for determining the value of work.
3.1. Determine scope of work according to project documentation.
3.2. Develop projects for facilities automation LLC «Lestransservis» with the subsequent installation and adjustment.
3.3. The work is performed from the material of the contractor.
4. requirements to the Executive Director.
4.1. To clarify the conditions of execution of works, acquaintance with the subject necessarily arrival of representatives of the Executive Director.
4.2 performer in its commercial offer specifies the order of payment and other terms.
4.3 Certification Manager, ENGINEERS and performers in industrial safety and labour protection on GCO. According to the annex No. 1.
measure 4.4 HSE safe methods of work on the project.
4.5 upon termination of works to hold the hydraulic system test.
4.6 upon completion of the installation works to provide the customer with the Executive and technical documentation.
5. conditions of work
5.1. Executing installation and commissioning installation sites for accounting and data transfer systems to the extent stated projects accounting units.
5.2. The customer controls the production and performance of works on objects.
5.3 coordination with all interrelated services conducts a performer.
5.4. Surrender-acceptance of accounting units and transfer them to simultaneously balance the customer by Commission composed of representatives of: The Customer, A Contractor.
6. Terms of execution of works.
Start of works-July 2018 g.
Completion-September 2018 g.
7. payment terms.
7.1. On the fact of fulfilled works.
8. General requirements.
8.1. Specify the cost of works on objects. The total cost of the lot.
8.2. To the specification attached for the list of documents necessary for processing orders is enterprise tolerances listed in annex No. 1.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Party, participating in the procedure (who offer) before the expiry of the deadline, is required to download to your system the following documents:
1. Bylaws (as amended and supplemented, if they were).
2. Certificate about State registration.
3. Certificate of tax registration.
4. Extract from the UNIFIED STATE REGISTER.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the representative to sign the documents:
-Decision (Protocol).
-Power of attorney.
7. Proposal for execution of works (see file "work Proposal")
8. Contact person: Vorotyncev Alexander Nikolaevich, Tel. 8 (8635) 29-44-32, email: AVorotyncev@energoprom.ru
9. Certificate of conformity to requirements of standard ISO 9001: 2008 (if available)
This request is not a notice about the contest or an auction and does not confer any rights of parties entails no duties except directly specified in the notification.
10. Executive requirements:
-Permits (CPO, licenses, tolerances).
— Development of PPR, Executive LEAD, RTI.
— Availability of certification Manager, ENGINEERS, working on industrial safety to GCO.
— The availability of medical staff work at the tolerance of GCO.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 02.11.2018 at 11:08
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 5. More >>