Request for Proposals No. 3334772 
The device of reinforced concrete structures of the technological underground in the axes 3-4 / AT-ASH, 102-105/ AB-AG, pits in the axes 88 /L, 3 /AZH, 92/AB.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:16.06.2023 15:00 (was extended by 1 weeks)
Last edited:05.06.2023 13:27
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:post-payment
Delivery terms:6. Duration of
work
According to the Schedule of work – Appendix B.
7. Scope of work The scope and list of work includes, but is not limited to, the scope of work
listed below.
The works are carried out by the Contractor in full, "turnkey",
by the Contractor's forces, means and mechanisms, including all necessary
consumables and related expenses.
1. Statement of the scope of work (Appendix A) according to the Working
Documentation (Appendix B) and the terms of reference.
2. Purchase of the materials specified in Appendix A, as well
as consumables and other materials necessary for the work.
3. Delivery, unloading, storage of materials on the territory,
movement of materials to the place of work.
4. Performing input control of materials, products and structures.
5. Mobilization of all necessary equipment and tools
to the work site.
6. Preparation and coordination with the Customer of the PPR, GPR and all documents necessary
for the work.
7. The device of monolithic reinforced concrete structures.
8. Care of concrete.
9. Non-destructive testing of the strength of monolithic reinforced
concrete structures.
10. Other work necessary for the successful completion of the work.
11. Transfer of a set of Executive documentation and delivery of works.
12. Demobilization.
According to the Customer's decision, part or the full volume of materials
listed in the Statement of Work Volumes can be delivered
By the customer, as a tolling material. The obligation, in this
case, for entrance control, acceptance, unloading, moving to the place
of work, completeness, protection and safety of material and
property, etc., for the performance of work remains with the Contractor.
Georeferencing:620000, Russia, Sverdlovsk region, Yekaterinburg
Comments:
8. Source
data
provided
by the customer
Appendix A: Statement of work volumes
Appendix B: Set of Working documentation 66-06-22-RD-KZH16
"Technological underground, pits"
Appendix B: Schedule of work
9. Requirements for
the work
1. Before the start of installation, perform a geodetic survey
of the grillwork structures for compliance with the planned and altitude position,
notify the Customer about excess deviations and discrepancies with the Executive survey
.
2. Before the start of the work, coordinate the PPR and the schedule of
work with the Customer. It is prohibited to carry out work without an agreed PPR.
3. Perform input control of materials, products and structures.
4. The device of monolithic and installation of precast reinforced concrete structures
should be carried out in accordance with the requirements of SP 70.13330.2012.
5. The structures of technological underground pits should be made of concrete
of class B25 W6 F150 for concrete preparation of concrete of class B7.5 with a thickness
of 100 mm.
6. Reinforcement should be performed with rod fittings of class A240, A500C according to
GOST 34028-2016.
7. Reinforcing products must be cleaned
of rust and dirt before installation in the formwork. The manufacture of bent rods is carried out in a cold
state on mandrels with a diameter of 5d.
8. The connections of the fittings are carried out using knitting wire.
9. To provide a protective layer, use plastic clips.
It is forbidden to use fittings or boards as fixators of the protective layer
.
10. During the construction process, ensure the control of the strength of concrete
by non-destructive methods according to GOST 22690-2015, GOST 18105-2010.
11. At all stages of work
, surface and ground water must be removed from the pit using drainage.
The design of drainage pits should prevent the leaching
of sand particles from the soil of the base.
12. Backfill of the sinuses and the base under the bottom of the pits should be carried
out with medium-sized sand with a layer-by-layer seal (200-300 mm) up
to a compaction coefficient of 0.95.
13. All concrete surfaces in contact with the ground should be treated
with a coating waterproofing (GOST 7415-86) in 2 layers.
Protect the waterproofing with a PLANTER Standard membrane. The PLANTER Standard membrane
should be fixed to the walls of the pit using a profiled membrane adhesive.
The integrity of the waterproofing is not allowed to be violated.
14. All internal concrete surfaces in contact with the ground
should be treated with a 2-layer Penetron Admix protective coating.
15. Put a bentonite
cord "Barrier" 25x15. 16 into the working seams of reinforced concrete structures
. Process the inner faces of the pits in the axes 3 / AZH, 92 / AB with liquid
glass for 2 times.
17. When performing work in winter, it is necessary to take into account the instructions
of the relevant chapters of SP 70.13330.2012 for each type.
18. All work is carried out "turnkey" with materials and by the Contractor.
The cost of the work includes, temporary lighting, a wheel washing point and its
maintenance and accommodation and meals for personnel, the installation of temporary
roads, networks and structures, sanitary facilities,
consumables, overlaps, overlaps and joints of materials, travel
expenses, materials and equipment for laying, care and heating of concrete,
personal protective equipment for safety, snow cleaning,
drainage, collection, removal and disposal of garbage, the safety of materials,
equipment and property, obtaining and developing the necessary
accompanying documents for the production of works and other costs
necessary for the successful completion of work within the terms established
by the contract and with the quality corresponding to the requirements of the Customer, this
Technical Specifications and Working Documentation.
19. Payment for the work performed is made for
the amount of work actually performed, on the basis of executive documentation, with confirmation
by technical supervision and a surveyor of the customer. The volumes and cost
of the work performed are closed upon the fact, i.e. losses during transportation and
unloading /loading, overlaps, trimming, overlaps, coefficient for
irreparable losses, coefficient of metal deposition, etc. should be
included in the cost of work.
20. The Contractor undertakes to prepare and send to the Customer a daily
report, according to the Customer's form, on the work performed.
18. Temporary
roads and access to
the venue
There are access roads to the border of the construction site.
On-site entrances to the places of work and storage
of materials, the contractor provides and organizes independently.
works'.
19. Provision
and payment
of electricity
The connection point is in the GRSCH, approximately 200m from the place of
work.
20. Provision
of water supply
The contractor independently provides its needs for technical and
household water supply.
21. The list
of
normative and technical documents, in
accordance with
the requirements
of which
it is necessary
to perform
the work
1. Work should be carried out in accordance with the requirements of the regulations:
RD-11-02- 2006 Requirements for the composition and procedure for maintaining executive
documentation.
SP 70.13330.2012 Load-bearing and enclosing structures.
SP 435.1325800.2018 Concrete and reinforced concrete monolithic structures.
GOST R 21.1101-2013 System of project documentation for construction
(SPDS).
SP 48-133330 Organization of construction.
SP 22.13330.2016 Foundations of buildings and structures.
GOST 18105-2010 Concrete. Rules for strength control and evaluation.
GOST 22690-2015 Concrete. Determination of strength by mechanical methods
of non-destructive testing.
in force on the territory of the Russian Federation, Working documentation, Statement
of work volumes, Contract and this Technical Specification, other
technical and regulatory documents;
2. The materials, equipment, tools used must
comply with GOST, technical specifications applicable in the territory of the Russian Federation, have
the necessary certificates and permits.
22. Guarantee for the
result of work
The guarantee for the result of the work performed by the Contractor is 5 years.
23. Requirements for
Labor protection and

Safety techniques.
The contractor is obliged to strictly comply with the requirements of OT and TB, in
accordance with the requirements of Russian legislation, as well
as the internal requirements of the enterprise when carrying out work. The Contractor
is obliged to respond immediately to all comments from the Customer
on violations of the rules of OTiTB, and immediately eliminate such comments.
The customer has the right to stop the contractor's work until
the violations are eliminated, if such violations may lead to serious
injuries or death of the contractor's employees. The Customer has the right to impose a fine
on the Contractor for not fulfilling the Customer's requirements to eliminate violations
of the OTiTB rules.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: Hidden