Request for Proposals No. 2435997 
Restoration of the operational suitability of the roof of the buildings of Block No. 3 TsO 2 inv. No. 2665, SPC 2 Crushing and grinding department inv. No. 1370

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:02.09.2020 17:24 (was extended by 24 min, 52 sec)
Last edited:19.08.2020 09:38
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In the commercial offer
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk
2. The purpose of the work.
2.1. Restoration of the operational suitability of the roofs of the buildings of Block No. 3, CO 2, inventory No. 2665. SPC 2 Crushing and grinding department, inv. No. 1370.
3. List and scope of work performed.
3.1. Inventory of work and defects Unit of measurement Quantity
Firing shop No. 2, inv. No. 2665, CO 2, inv. No. 266
1. Dismantling of sheet steel drips δ = 0.55 mm tn 0.922
2. Removing rust from existing sheet steel sills 100 m2 1.76
3. Priming existing sills, on one side, at a time 100 m2 1.76
4. Painting of metal structures of existing ebbs in two times 100 m2 1.76
5. Dismantling the soft roll roof of the abutments, in separate places up to 0.6 m 100 m2 1.26
6. Disassembly of the coating made of deposited materials 100 m2 of coating 3.96
7. Dismantling of leveling cement-sand screeds 15mm thick 100m2 screeds 2.86
8. Add screed disassembly from 15mm to 30mm 100m2 screed 2.86
9. Installation of cement screed in separate places δ = 30 mm 100m2 screed 2.86
10. Installation of a soft roll roofing made of welded materials in one layer. 100 m2 10.20
11. Priming of bases with ready-made bitumen emulsions 100 m2 18.63
12. Installation of a soft roll roofing made of welded materials in two layers. 100 m2 15.16
13. Arrangement of three-layer abutments made of weldable materials up to 0.6 m high. without an apron. 100 m / n 5.78
14. Production of sheet steel castings δ = 0.55 mm tn 0.085
15. Priming of existing sills on both sides at a time 100 m2 0.384
16. Painting of metal structures of existing castings for two times 100 m2 0.384
17. Installation of sheet steel ebbs δ = 0.55 mm 100 m2 0.192
18. Repair of a windbreak from slate m2 27
19. Cleaning of construction waste tn. 43
20. Sorting of construction waste. tn. 43
21. Mechanized loading of construction waste onto vehicles. tn. 43
SPC 2 Crushing and grinding department, inv. No. 1370
1. Dismantling of parapet slabs (0.4 * 0.74) pcs 188
2. Plastering the surface of the parapet wall m2 70
3. Priming of bases with ready-made bitumen emulsions 100 m2 1.32
5. Arrangement of abutments in one layer of weldable materials up to 0.6 m high without an apron. 100 m / n 1.55
6. Production of castings from sheet steel δ = 0.55 mm tn 0.423
7. Installation of sheet steel ebbs δ = 0.55 mm 100 m2 0.98
8. Repair of the roofing overlay coating in separate places in 1 layer 100 m2 0.5
9. Cleaning of construction waste tn. 12.7
10. Sorting of construction waste. tn. 12.7
11. Loading construction waste onto vehicles in a mechanized way. tn. 12.7

Note: The contractor should take into account the costs of installation, dismantling of temporary sites, installation, removal of winches, rigging devices, devices for lifting material in accordance with the developed PPR. These volumes are not included in the list of volumes of work by the customer.

4. Materials, mechanisms, equipment and tools provided by the Contractor.
4.1. Works are performed from the customer's material
4.2. Lifting mechanisms and mechanisms for loading and installation works are provided by the contractor.
4.3. Electric welding and gas-cutting equipment, power tools, oxygen, propane, auxiliary materials are provided by the contractor.

5. Requirements for the Contractor.
5.1. The contractor must have the necessary production and human resources to carry out this work, be a member of a self-regulatory organization (SRO).
5.2. To clarify the conditions for the performance of work, familiarization with the object, it is desirable that the representatives of the Contractor arrive at the Customer.
5.3. The contractor in his commercial offer indicates the procedure for payment for work and other conditions.
5.4. Certification of the head, engineering technician and executors for industrial safety and labor protection at HIF. According to Appendix No. 1.
5.5. Provision of health and safety measures for safe work methods at the facility.
5.6. The Contractor is obliged to provide, before the start of work, copies of documents confirming the presence of a labor protection service and / or a labor protection specialist in the contractor organization (order of appointment to a position in a contractor organization, certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of services on labor protection.
5.7. The contractor provides a work schedule before starting work.
5.8. The contractor monitors the volume of the removed construction waste and scrap metal through the weighing station.
5.9. The contractor prepares and submits to the customer as-built documentation in accordance with RD-11-02-2006 Requirements for the composition and procedure for maintaining as-built documentation during construction, reconstruction, overhaul of capital construction facilities and requirements for certificates of inspection of works, structures, sections of engineering networks technical support.
5.10. The contractor provides a local estimate.

6. Conditions of work
6.1. Work at an operating enterprise in the provided technological windows, depending on the equipment load.
6.2. Development of PPR or PPRK is carried out by the Contractor.
6.3. Lifting mechanisms, rigging devices in accordance with PPR for installation are provided by the Contractor.
6.4. Vehicles for transporting materials to the object from warehouses, as well as scrap metal are provided by the Contractor

7. Turnaround time.
7.1. Commencement of work - September 2020.
7.2. Completion of work - November 2020
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Participant who has submitted a bid before bids submission deadline shall upload the following documents:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Work proposal (see the file "Work proposal")
8. Contact person: Tetslav Vladimir Edvinovich - head
OEiNzis, telephone 8 86532-9-42-13, fax 8 86352 9-46-18 e-mail: VTetslov@energoprom.ru.
9. Certificate of Compliance with ISO 9001: 2008 (if applicable)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Requirements for the performer:
- Permitting documents (SRO, licenses, permits).
- Development by the contractor of PPR, PPRK, RTI.
- Availability of attestation of the head, engineering technician, industrial safety workers at the HIF.
- Availability of medical clearance of personnel to work at HIF.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 30.09.2020 at 08:27
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 1. More >>