Design and survey work, designer supervision. AOPO (automatic overvoltage protection) and AOSN (automatic voltage drop protection) of electric networks districts in the area of Substation Grebnevo, Substation Rayki, Substation Monino, for the...
Design and survey work, designer supervision. AOPO (automatic overvoltage protection) and AOSN (automatic voltage drop protection) of electric networks districts in the area of Substation Grebnevo, Substation Rayki, Substation Monino, for the needs of EasCollapse
Not applicable. Proposal shall cover the entire lot.
Alternative bids
Alternative bid is a bid, of which the terms and conditions differ from those established in the bid-related documents.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
оплата за выполненные объемы работ согласно графику выполнения работ в течение 30 дней после подписания Акта приемки выполненных работ и (или) форм КС-2 и КС-3.
Delivery terms:
с момента подписания договора - январь 2015 г.
Venue of bids examination:
г. Москва, Дербеневская наб., д.7, стр.22
Date and time of bids consideration:
06.10.2014 11:00
Results date and time:
06.10.2014 11:00
Georeferencing:
142400, Moscow region, Noginsk, st. Radchenko, d.13
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.