Request for Proposals No. 2664770 
Execution of electrical work on power supply of control cabinets for electric heating of a pitch pipe in the Central Industrial and Industrial Complex. EPM-NEZ JSC

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
43.21.10  Работы электромонтажные
41.20.20.711  Комплекс электроснабжения
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:28.05.2021 11:01 (was extended by 1 min, 15 sec)
Last edited:14.05.2021 16:19
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In the commercial offer
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk

2. Purpose of work:
2.1. Provide power supply to control cabinets for electric heating of the pitch pipe.

3. Scope and list of works.
3.1. Perform electrical work in accordance with the project EL 001.13815 (Appendix 1)

4. Supply of materials and construction equipment for this work.
4.1. The works are carried out using the material and equipment of the Contractor.
4.2. Installation equipment, mechanisms for loading work, tools and all consumables for them (oxygen, propane, auxiliary materials), PPE, electric welding, gas-cutting and other equipment necessary for the work is provided by the Contractor
4.3. Removal of garbage of all categories to landfills for receiving industrial waste is carried out by transport provided by the Customer, upon the preliminary request of the Contractor. The costs for the disposal of garbage of all categories, at landfills for receiving industrial waste, are borne by the Customer.
4.4. Garbage loading is carried out by the forces and mechanisms of the Contractor.
4.5. In case of justified comments to the personnel on the quality of the work performed, violation of safety regulations, as well as violations of an administrative nature, at the request of the Customer's specialists, the Contractor is obliged to immediately replace these employees.

5. Turnaround time.
Completion of work - June 20, 2021.

6. Acceptance.
The work is considered to be completed in full after the Parties have signed the Certificate of Acceptance of Completed Work of the form (KS-2; KS-Z).
7. Requirements for the submitted proposals.
The Contractor must indicate in the TCH:
Terms of work, cost of work, as well as payment terms.

8. Application.
Project EL 001.13815.

9. Requirements for the Contractor
9.1. The contractor must have the necessary production and human resources to carry out this work, be a member of a self-regulatory organization (SRO).
9.2. To clarify the conditions for the performance of work, familiarization with the object, it is desirable for the representatives of the Contractor to arrive at the Customer.
9.3. The contractor in his commercial offer indicates the procedure for payment for work and other conditions.
9.4. Certification of the head, engineering technician and executors for industrial safety and labor protection at HIFs in accordance with Appendix No. 1.
9.5. Provision of health and safety measures, safe work methods at the facility.
9.6. Before issuing a work permit for work, the Contractor is obliged to provide the Customer with the following documents: copies of documents confirming the presence of a labor protection service and / or a labor protection specialist in the contractor organization (order for appointment to a position in the contractor organization, certificate of a labor protection specialist) or availability of an agreement with an accredited organization in the field of labor protection services.
9.7. After the completion of the work, the contractor hands over to the customer the as-built documentation in accordance with RD-11-02-2006 dated 26.12.06. and other regulatory documents.
9.8. Provision of warranty obligations for at least 12 months.
9.9. Employees involved in the performance of work must have professional training corresponding to the nature of the work with a mark in a special certificate of training and passing exams in certification commissions.

10. Work safety
When performing work, the contractor must comply with the requirements of the following rules:
- labor protection rules during the operation of electrical installations;
- rules for the technical operation of electrical installations of consumers;
- safety rules for hazardous production facilities where - lifting structures are used;
- electrical installation rules;
- fire safety rules;
- rules for labor protection when working at height POT RM-012-200;
- rules of environmental, sanitary and hygienic and other norms in force on the territory of the Russian Federation and to ensure safe working conditions for the life and health of people.
For the performance of work, the contractor must undergo an introductory briefing. All work performed on the territory of JSC "EPM-NEZ" must be carried out in accordance with the regulation "On the use of orders of permits when performing work of increased danger at JSC" EPM-NEZ ""
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Tax registration certificate.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with the tax authority's mark of acceptance.
6. Documents confirming the authority of the representative to sign documents:
- Decision (Protocol).
- Power of attorney.
7. Work proposal (see the file "Work proposal")
8. Contact faces:
Investment Projects Director - Maxim Mikhailovich Naprasnik
Tel. 8 (8635) 29-48 36 mnaprasnik@energoprom.ru
Ved. construction supervision engineer - Oleg Vyacheslavovich Veliky
Tel. 8 (8635) 29-43-98 OVelikiy@energoprom.ru
9. Certificate of compliance with the requirements of ISO 9001: 2008 (if available)
This request is not a notification of a tender or auction and does not give any rights to participants, does not entail the emergence of any obligations other than those expressly indicated in the notification.
10. Requirements for the performer:
- Permits (SRO, licenses, permits).
- Development by the contractor of PPR, PPRK, RTI.
- Availability of attestation of the head, engineering technician, industrial safety workers at the HIF.
- Availability of medical clearance of personnel to work at HIF.
—Before issuing a work permit for work, the Contractor is obliged to provide the Customer with the following documents: copies of documents confirming the availability of a labor protection service and / or a labor protection specialist in the contractor (order for appointment to a position in the contractor, certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services.
To consider the application, it is MANDATORY to provide a commercial proposal.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 01.06.2021 at 08:12
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 1. More >>