Request for Proposals No. 3346246 
Performance of engineering and environmental surveys on the object Krasnoyarsk Krai, Emelianovsky district, Solontsovsky Village Council, 803rd km of the Baikal highway (left side), uch. No. 9

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Performance of engineering and environmental surveys on the object Krasnoyarsk Krai, Emelianovsky district, Solontsovsky Village Council, 803rd km of the Baikal highway (left side), uch. No. 9

OKPD2 category:
Quantity:1 усл.ед.
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:22.06.2023 11:20
Last edited:16.06.2023 11:52
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:advance payment, mainly post-payment
Delivery terms:35 calendar days from the date of signing the contract. Start of work no later than 25.06.2023

The purpose of the survey: a general survey to obtain information about the condition of the site and the area around it, the risks associated with pollution (biological, chemical, radioactive and toxicity of soils, waters (underground and aboveground), potential
risks and restrictions on the construction and further operation of the capital construction facility.
The survey and report must contain everything necessary and sufficient for the development of design and working documentation, submission and
passing of expertise, obtaining a construction permit. Including, but not limited to, obtaining certificates and opinions from
authorized bodies.

- Research and assessment of the radiation situation, including soils, surface and groundwater;
- Soil research;
- Geoecological testing and assessment of soil,
soil, surface and groundwater contamination;
- To determine the necessity and approximate scope of reclamation works;
-Laboratory chemical and analytical studies;
- Perform an analysis and general assessment of the impact of the SPZ of the projected object and the objects adjacent to the site, put on the SPZ scheme. To give a conclusion on the possibility of placing the projected
object on the land plot, taking into account the mutual influence of the SPZ.
- Identify and indicate in the report, put on the diagram the presence
/absence, within the boundaries of the survey site and the zone around it,
specially protected natural territories, cultural
heritage sites and monuments, as well as their protected/protective zones
, animal burial grounds, biothermal pits, water protection zones,
sources of household and drinking water supply and their SPZ,
airfields, POWER lines, highways, landfills and storage facilities, railway roads,
treatment facilities, aeration fields, rare, protected species of plants, lichens, fungi, animals; forests with a protective status, forest lands, etc.
Preparation of a general conclusion on the ecological condition
of the territories in the area of the projected object.
The survey and report must contain everything necessary and sufficient for the development of design and working documentation, submission and
passing of expertise, obtaining a construction permit. Including, but not limited to, obtaining certificates and opinions from authorized bodies.
If unforeseen
complex or dangerous natural and man-made conditions are detected during field engineering surveys that may adversely affect the construction and operation of structures and the habitat, the contractor of engineering surveys must inform the developer
or technical customer of the need
for additional study and amendments to the contract regarding changes in volumes, types and methods of work..

The project provides for the construction of buildings and structures:
- Warehouse complex with ABH;
- CHECKPOINT;
- Pumping station with fire-fighting reserve tanks;
- Boiler room;
- LOS;
- DSU No. 1;
- DSU No. 2;
- RTP;
- sites for solid waste.
The projected warehouse building is frame with reinforced
concrete columns, metal trusses and curtain walls made of
sandwich panels, without a technical floor with a flat, combined roof,
with an internal drain. The administrative and household part is 3-storey.
The foundation is piled, the depth of the piles is 12 m, the grillage is 3 m.

The accuracy, reliability, composition, design and reliability
of engineering and environmental surveys must meet the requirements:
1. SP 47.13330.2016 "Engineering surveys for
construction. The main provisions".
2. SP 11-102-97 "Engineering and environmental surveys for
construction".
3. SanPiN 2.1.7.1287-03, SanPiN 2.2.1/2.1.1.1200-03 , NRB-99,
OSPORB-99, SP 2.6.1.1292-2003, MU 2.6.1.2398-08, GOST
17.4.3.01-83; SNiP 2.01.14-83, SP 11-103-97 and other regulatory documents regulating engineering surveys.

Engineering survey reports are transmitted to the Customer:
on paper in the amount of 2 copies;
electronic version of the results of engineering surveys in
the amount of 2 (two) copies.
Reports are transmitted on electronic media:
the text part in Microsoft Word format;
graphic part in AUTOD 2010 and higher format;
general (text part + graphic part) in non-editable
pdf format. with signatures of performers and with graphic
applications
Georeferencing:660015, Russia, Krasnoyarsk Territory, Yemelyanovsky district, Solontsovsky village Council, 803rd km of the Baikal highway (left side), uch. No. 9
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: Hidden