1. |
PU 3/1/1/1 installation (with delivery) of metal frame of the boiler and hull parts (Ox № 3) (1 ШТ) |
2. |
PU 3/1/1/2 installation (with delivery) of a platform and ladders of the boiler, connecting platforms between boilers (Ox № 3) (1 ШТ) |
3. |
PU 3/1/1/3 installation (with delivery) of the left side screen 1-3 of the Furnace Passage (Ox № 3) (1 ШТ) |
4. |
PU 3/1/1/4 installation (with delivery) of the right side screen 1-3 of the Furnace Passage (Ox № 3) (1 ШТ) |
5. |
PU 3/1/1/5 installation (with delivery) of the front screen of the 1st aisle of the firebox (Ox № 3) (1 ШТ) |
6. |
PU 3/1/1/6 installation (with delivery) of the rear screen of the 1st aisle of the firebox (Ox № 3) (1 ШТ) |
7. |
PU 3/1/1/7 installation (with delivery) of the rear screen of the 2nd pass and the inclined screen of the cold funnel 2-3 of the Furnace Passage (Ox № 3) (1 ШТ) |
8. |
PU 3/1/1/8 installation (with delivery) of the rear and ceiling screen of the 3rd aisle of the firebox (Ox № 3)
Waves PU 3/1/1/9 installation (with delivery) of the drum with Vnutribarabannymi devices and supports (Ox № 3) (1 ШТ) |
9. |
{11} (1 ШТ) |
10. |
PU 3/1/1/10 installation (with delivery) bunkers horizontal flue 4-rd Passage (Ox № 3) (1 ШТ) |