Execution of contract work for a full range of major repairs of warehouse No. 6 of the industrial enterprise LLC "PREDO". The volume of work in the warehouse is 536,77m2:
- Metal installation. the frame of the Prof. pipe;
- Installation of partitions and ceilings from sandwich panels;
- Installation cold. equipment.;
- Wiring of electrics, connection. will illuminate. devices;
- Hanging doors;
- Arrangement of equipment.Collapse
OKPD2 category:
43.99.90.100 Работы строительные специализированные, не включенные в другие группировки, кроме работ на объектах культурного наследия
Организатор указал предполагаемую дату подведения итогов. Если в процедуре не будут подведены итоги при наступлении этой даты, то участники могут запросить их самостоятельно
Comments: The scope of work on the area of warehouse No.6,536.77m2:
- Installation of a metal frame from a 100mm profile pipe for fixing sandwich panels;
- Installation of partitions and ceilings from sandwich panels;
- Installation of refrigeration equipment in a chamber with a temperature regime of +5;
- Wiring of electrics, connection of lighting devices;
- Hanging doors;
- Arrangement of equipment.
The contract includes the following types of work:
- drawing up a schedule of work;
- drafting and approval of the PPR;
- organization of an effective construction process of the facility;
- production of works within the time limits established by the schedule of works;
- compliance with the approved construction budget;
- quality control of works;
- control of compliance with fire safety standards, labor protection, safety, environmental protection, as well as rules of conduct on the territory of an operating industrial enterprise;
- conclusion of contracts with suppliers, provision of construction materials, structures and equipment;
- formation and transfer of executive documentation to the customer;
- presentation of the object of the acceptance commission;
The scope of work is determined according to the project documentation and the work volume statements and includes sections:
AR.1 Drawing sheet. Explanatory note;
AR.4 Warehouse No. 6. Installation plan;
AR.5 Warehouse No. 6. Ceiling plan;
AR.6 Sandwich panel attachment points;
AR.8 Warehouse No. 6. Layout of lamps and switches;
AR.9 Warehouse No. 6. Layout of sockets.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Terms of participation
To view the terms of participation, please get registered