Design work on the project "Technical re-equipment of the TG-8 electro-hydraulic regulation system" for the needs of the Ulyanovsk TPP-1 software unit of the Ulyanovsk branch of T Plus PJSC.
Design work on the project "Technical re-equipment of the TG-8 electro-hydraulic regulation system" for the needs of the Ulyanovsk TPP-1 software unit of the Ulyanovsk branch of T Plus PJSC.
Procurement method (according to the procurement regulations):
Открытый запрос предложений в электронной форме
OKPD2 category:
71.1 Услуги в области архитектуры, инженерно-технического проектирования и связанные технические консультативные услуги
OKVED2 category:
71.1 Деятельность в области архитектуры, инженерных изысканий и предоставление технических консультаций в этих областях
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
Payment for the performed Works is made by the Customer upon completion of all Works and acceptance by the Customer of the Work Results on the basis of the Works Acceptance Certificate signed by the Parties, with a deferred payment of at least 60 (sixty) no more than 90 (ninety) calendar days (if the contract is concluded with SMSP, the payment term is established in accordance with the current legislation of the Russian Federation) from the date of signing the Act of Acceptance of Works, provided that the Contractor submits to the Customer a complete set of the following documents:
ü Certificate of Acceptance of Works signed by the Parties;
ü Copies of the Waybill / Act / Register on acceptance and transfer by the Contractor to the Customer of a full set of Documentation;
ü The originals of the positive conclusions of the state or non-state examination of project documentation, including in terms of determining the reliability of determining the estimated cost, examination of industrial safety;
ü Coordination of the Project with the manufacturer of the turbine unit of UTZ JSC;
ü original invoice;
ü the original invoice issued on the basis of the Act of Acceptance of Works and transmitted to the Customer within 5 calendar days from the date of completion of the work,
subject to the absence of claims and requirements on the part of the Customer regarding the quality and timing of the work performed.
Settlements under the Agreement are made by transferring funds to the account of the Contractor specified in the Agreement, and may also have a different form of settlement that does not contradict the legislation of the Russian Federation.
Delivery terms:
Deadline: from the date of conclusion of the Agreement to 07/31/2020
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.
Контактное лицо:
Никишина Елена Валерьевна – ведущий специалист управления организации закупок, e-mail: Elena.Nikishina@tplusgroup.ru тел. 8 (8422) 61-83-04
The Organizer has announced the results on 31.03.2020 at 08:11
and selected the winner: OOO "PROMAVTOMATIKA" – (Bidder 3) (Ларионов А.А.) submitting a bid dated of 16.03.2020 15:42 totalling to 1 450 000,00 RUB (price excl. of VAT)
Обоснование: На основании Протокола ЗК №231 от 31.03.2020г.