Request for Proposals No. 2777734 
Upgrading of the hydraulic system of the D-6248 press (ca. 6300 t) SPC-2 EPM-NEZ

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Upgrading of the hydraulic system of the D-6248 press (ca. 6300 t) SPC-2 EPM-NEZ
See TK and related documentation. (Complex service)

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:08.10.2021 16:26 (was extended by 26 min, 39 sec)
Last edited:05.10.2021 12:53
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:The Contractor specifies deadlines, costs, payment options and other conditions in their offer. A prerequisite is to have an estimated TER or FER work documentation attached to the TAP
Delivery terms:1. EPM-NEZ JSC application, St. Novocherkassk
2. Place of work:
Customer's territory, operating company.
3. Manufacturing Purpose:
hydraulic upgrade
press system with a force of 6300 tn in SPC section No. 2.
4. Deadline
4.1. Starts - November 2021
Completion - June 2020
5. List and scope of work carried out.
5.1. The contractor performs the work of upgrading the hydraulic system of the press with a force of 6,300 from its material according to the sections of the project:
The station is hydraulic.
Circulation unit installation.
• D6248-01.00.200 - Installation of circulation unit.
• D6248-01.00.200 SB - Installation of circulation unit.
• D6248-01.00.201 - Bonka G2.
• D6248-01.00.202 - Bonka DD-G1_2.
• D6248-01.00.203 - Bonka DT-M20x1.5.
• D6248-01.00.204 - Bonka G1-4.
• D6248-01.00.205 - DN100 heat exchanger flange.
• D6248-01.00.206 - DN100 CHD Flange
Rama.
• D6248-01.00.210 — Rama.
• D6248-01.00.210 SB — Rama.
• D6248-01.00.210-The eyelet.
• D6248-01.00.213-Platic.
• D6248-01.00.214-Cross.
• D6248-01.00.218-Jumper.
• D6248-01.00.225-Flooring.
• D6248-01.00.226-Filter plate.
• D6248-01.00.227-Pallet.
• D6248-01.00.229-Plate for NA.
• D6248-01.00.231-Pallet.
• D6248-01.00.232-Flooring.
• D6248-01.00.233-Flooring.
• D6248-01.00.234-Bobyshka.
• D6248-01.00.235-Stub.
• D6248-01.00.236-Bobyshka.
D6248-01.05.100 — Rama.
• D6248-01.05.100 — Rama.
• D6248-01.05.100 JV- Rama.
• D6248-01.05.101 — Stove.
• D6248-01.05.102 — Stove.
• D6248-01.05.103 — Pallet.
• D6248-01.05.104 - Cross.
• D6248-01.05.000 - Pump unit.
• D6248-01.05.000 SB - Pump unit.
• D6248-01.05.002 — Flange.
• D6248-01.05.003 - Pressure flange
Pumping tank (refinement)
• D6248-01.00.600 - Pump Unit Tank (Refinement).
• D6248-01.00.600 SB - Pump Unit Tank (Refinement).
• D6248-01.00.601 - DN200, PN16 Flange.
• D6248-01.00.602 - Bonka G1.2.
• D6248-01.00.603 - Bonka M20x1.5.
• D6248-01.00.604 - Bonka G2
Pneumatic rack
• D6248-01.00.700 - Pneumatic rack.
• D6248-01.00.700 SB - Pneumatic rack.
• D6248-01.00.701 — Stove.
• D6248-01.00.702 — Leaf.
• D6248-01.00.703 — Plate.
• D6248-01.00.704 — Bonka.
Ventilation duct of pump unit tank.
• D6248-01.00.800 - Pump unit tank ventilation channel.
• D6248-01.00.800 MH - Pumping plant tank ventilation duct mounting drawing.
• D6248-01.00.801 — Flange.
• D6248-01.00.810 - Bracket.
• D6248-01.00.810 SB - Bracket Assembly Drawing.
• D6248-01.00.811 Profile.
• D6248-01.00.812 Profile.
• D6248-01.00.813 Profile.
• D6248-01.00.814 Plate.
Pipelines.
• D6248-01.00.900 (Disc.) - Piping
• D6248-01.00.900 MH - Hydraulics Piping Mounting Drawing.
• D6248-01.00.910 — Bracket.
• D6248-01.00.910 SB - Bracket Assembly Drawing.
• D6248-01.00.911 Profile.
• D6248-01.00.912 Plate.
• D6248-01.00.920 — Bracket.
• D6248-01.00.920 SB - Bracket Assembly Drawing.
• D6248-01.00.921 Plate.
• D6248-01.00.930 — Bracket.
• D6248-01.00.930 SB - Bracket Assembly Drawing.
• D6248-01.00.940 — Bracket.
• D6248-01.00.940 SB - Bracket Assembly Drawing.
BRS block.
• D6248-01.14.000 - BRS block.
• D6248-01.14.000 SB - BRS Block Assembly Drawing.
• D6248-01.14.001 — Tee.
• D6248-01.14.002 - Tee
• D6248-01.00.300 - Installation of pump units.
• D6248-01.00.300 SB - Installation of pump units.
• D6248-01.00.301 - SAE 1.25-2-6000 Angle.
• D6248-01.00.302 - SAE 1,25-2-6000 tee.
• D6248-01.00.303 - SAE 1.25-2-3000 Angle.
• D6248-01.00.304 - SAE 1,25-2-3000 tee.
• D6248-01.00.305 - Bonka G3-4.
• D6248-01.00.307 - Nipple 1.25-6000.
• D6248-01.00.308 - 1.25-6000 nipple without groove.
• D6248-01.00.309 - SAE2-3000 nipple.
• D6248-01.00.310 - Tee Drawing Rework.
Installation of valve blocks.
• D6248-01.00.480 (spec). Rama.
• D6248-01.00.480 SAT. Rama.
• D6248-01.00.481. Plate.
• D6248-01.00.482. Plate.
• D6248-01.00.484. The channel is longitudinal.
• D6248-01.00.485. Platyk.
• D6248-01.00.486. Plate.
• D6248-01.00.487. Plate.
• D6248-01.00.488. Plate.
• D6248-01.00.489. Plate.
• D6248-01.00.490. Plate.
• D6248-01.00.491. A kosynka.
• D6248-01.00.400 - Installation of valve units.
• D6248-01.00.400 SB - Installation of Valve Units
• D6248-01.00.100 - Hydraulic station.
• D6248-01.00.100 SB - Hydraulic station.
Auxiliary tank.
• D6248-01.00.510 - Auxiliary tank.
• D6248-01.00.510 SB - Auxiliary tank.
Pumping unit.
• D6248-01.05.000 — Pump unit.
• D6248-01.05.000 SB - Pump unit.
• D6248-01.05.002 — Flange.
• D6248-01.05.003 - Pressure flange
• D6248-01.00.500 - Auxiliary tank installation.
• D6248-01.00.500 MH - Auxiliary tank installation.
• D6248-01.00.501 - Flange DN50 rework.
Filling valve (refinement).
• D6248-04.00.000 - Filling Valve (Refinement).
• D6248-04.00.000 SB - Filling Valve (Refinement).
• D6248-04.00.001 — Bushing.
• D6248-04.00.002 — Liner.
• D6248-04.00.003 — Flange
• D6248-04.00.004 - Extension cord.
• D6248-04.00.005 — Nut.
• D6248-04.00.006 — Stock.
• D6248-04.00.007 - Valve cover rework.
• D6248-04.00.008 - Rod support.
• D6248-04.00.009 - Check box.
• D6248-04.00.010 - Fluoroplast ring.
• D6248-04.00.011 — Bracket.
• D6248-04.00.012 - Eyelet bushing.
• D6248-04.00.013 — The eyelet.
• D6248-00.00.000 PG3 - Press D6248 (us 6300 tn) List of items.
• D6248-01.00.000 G3 - Press D6248 (us 6300 tn) Hydraulic circuit circuit.
• D6248-01.00.000 PO - Press D6248. Hydraulic equipment. Equipment Placement Plan.
Electrical equipment
• D6248 - 01.00.000 Structural Automation Scheme
• D6248-01.00.000 VO control module.
• D6248-01.00.000 PE3 (List of items).
• D6248-01.00.000 PE5 (Cable List).
• D6248-01.00.000 E3 (Schematic diagram).
• D6248-01.00.000 E5 (Connection Diagram).
• D6248-02.00.000 VO (PUNS).
• D6248-02.00.000 PE3 (PUNS).
• D6248-02.00.000 E3 (PUNS).
• D6248-03.00.000 VO (PMU).
• D6248-03.00.000 PE3 (PMU).
• D6248-03.00.000 E3 (PMU).
• D6248-04.00.000 VO (BY).
• D6248-04.00.000 PE3 (BY).
• D6248-04.00.000 E3 (BY).
6. Supply of materials, machinery, tools for this work.
6.1. The works are performed using the material and equipment of the Performer.
6.2. Construction and lifting equipment, installation equipment, loading mechanisms, tools and all their consumables (oxygen, propane, auxiliaries), PPE, electric welding, gas cutting and other equipment required for the work is provided by the Contractor
6.3. Garbage collection of all categories, to industrial waste disposal sites, is carried out by transport provided by the Customer, upon the Contractor's prior request. The costs of disposing of all categories of waste at industrial waste disposal sites are borne by the Customer.
6.4. Debris loading is carried out by the Contractor's forces and mechanisms.
6.5. In case of reasonable comments to the staff on the quality of the work performed, safety violations, and administrative violations, at the request of Customer's specialists, the Contractor must replace these workers immediately.
7. TAP Requirement:
The Contractor specifies deadlines, costs, payment options and other conditions in their offer.
A prerequisite is to have an estimated TER or FER work documentation attached to the TAP.
8s. Reception.
The work is considered to have been completed in full after the Parties have signed the Form Work Acceptance Act (KC-2; CS-W).
9. Warranty obligations.
At least 12 months warranty for work and equipment.
10s. App.
Project Documentation as specified in Section 5.
11. Contractor Requirements
11.1. The executor must have the necessary production and human resources to carry out the work the organization has at least 10 people on a permanent basis, be a member of a self-regulatory organization ( SRO).
11.2. In order to clarify the conditions of the work and familiarize itself with the object, the Contractor's representatives arrive at the Customer.
11.3. The Contractor specifies the payment procedure and other terms and conditions in its offer.
11.4. Appendix No.1 certification of the supervisor, IT and the occupational safety and health executors at the GCSEs.
11.5. Ensuring OT and PB measures, safe on-site operations.
11.6. Prior to the issuance of a work permit, the Contractor must provide the Customer with the following documents: copies of documents confirming that the contractor has an occupational health service and/or occupational health professional (contracting order, occupational safety certificate) or contract with an accredited service provider occupational safety.
11.7. After completion of the work, the contractor submits to the customer the execution documents in accordance with RD-11-02-2006 dated 12/26/06 and other regulatory documents.
11.8. Secure at least 12 months of warranty.
11.9. Employees involved in the work must be trained in accordance with the nature of the work, marked on a special certificate of training and delivery examinations in the certification boards.
12. Work safety.
In open fire operations, pay special attention to OT and PB and fire safety measures.
During the work, the contractor must comply with the following rules:
- regulations on occupational safety in the operation of electrical installations;
- regulations for the technical operation of consumer electrical installations;
- Safety regulations for hazardous production facilities in which lifting facilities are used;
- electrical installation rules;
- fire safety regulations
- occupational safety regulations for working at POT height RM-012-200;
- environmental, hygiene and other regulations in force in the Russian Federation and ensure safe working conditions for human life and health.
In order to produce the work, the contractor must undergo induction. All work carried out on the territory of EPM-NEZ shall be carried out in accordance with the provision "On Applying Permit Approvals for High-Hazard Work at EPM-NEZ JSC" ;.
Georeferencing:Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who participated in the procedure (who made the offer) must upload the following documents to the system before the deadline for applications:
- Proposal indicating due dates, costs, payment options and other terms.
A prerequisite is to have an estimated TER or FER work documentation attached to the TAP
1. Charter (with all additions and changes, if there were any).
2. Certificate of State Registration.
3. Tax Registration Certificate.
4. Extract from the EGRUL.
5. Balance sheet as of the last reporting date with tax authority acceptance mark.
6. Documents confirming the authority of the representative to sign documents:
— Solution (Protocol).
- Power of Attorney.
7. Proposal for work (see Proposal for Work file)
8. Contact person: Oleg Martyshchenko - Chief Mechanic. Tel 8 (8635) 29-48-24, fax 8 (8635) 29-42-55, e-mail: OMartischenko@energoprom.ru
9. ISO 9001:2008 Certificate of Compliance (if available)
This request does not constitute a notice of competition or auction and does not confer any rights to the participants, does not entail any obligations other than those expressly stated in the notice.
10. Prior to issuing a work permit, the Contractor must provide the Customer with the following documents:
- copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming that the contractor has an occupational health service and/or occupational safety specialist (appointment order in the contracting organization, certificate occupational safety specialist) or having a contract with an accredited organization in the field of occupational safety services;
- a copy of the occupational health briefing from the Instructions Journal
- ERP or PPR or RTI;
- a copy of the workers' certification report on occupational safety;
- copies of ITR certification certificates for occupational health and general industrial safety requirements. When performing gas work, pressure receptacles using GPM, electrical installations, fire works — copies of certificates for each type of work;
- medical clearance of staff;
- copies of the certificates of gas-electric welders, slingers, cranes, hoists (towers). For gas-electric welders, copies of PTM certification reports.
In the event that the information in the submitted documents is found to be inconsistent with the requirements of the regulations and regulations, the Client may initiate an audit by the OT and PB service regarding occupational safety and safety and safety and safety Industrial safety in the Contractor's organization.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Мартыщенко Олег Михайлович - Главный механик
Тел. 8 (8635)29-48-24,
e-mail: OMartischenko@energoprom.ru
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 29.12.2021 at 15:27
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 2. More >>