Request for Proposals No. 77707 
Installation of Compass 2.0 remote control equipment in the framework of modernization of communication equipment at Substation HPP, for the needs of Penzaenergo, a branch of OAO IDGC of Volga.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Installation of Compass 2.0 remote control equipment in the framework of modernization of communication equipment at Substation HPP, for the needs of Penzaenergo, a branch of OAO IDGC of Volga.
(Assembly)

Quantity:1 шт.
Per unit price:2 950 000,00 RUB (price incl. VAT, VAT: 18%)
Total price:2 950 000,00 RUB (price incl. VAT)
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:13.05.2011 14:00
Last edited:06.05.2011 13:22
Organizer (Initiator):PAO "ROSSETI VOLGA"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Hide bid prices during bids submission period:Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Payment terms:Порядок оплаты: Авансовые платежи выплачиваются Заказчиком:
по строительно-монтажным, пуско-наладочным работам в размере не более 15 процентов от общего объема стоимости работ, выплачиваются на основании счетов, выставляемых Подрядчиком, в течение 20 календарных дней со дня заключения настоящего Договора, но не ранее предоставления договора страхования в соответствии с разделом 14.
по закупаемому оборудованию в размере не более 30 процентов от стоимости оборудования, первый авансовый платеж выплачивается на основании счетов, выставляемых Подрядчиком, в течение 20 календарных дней со дня заключения настоящего Договора, но не ранее предоставления договора страхования в соответствии с разделом 14;
по закупаемому оборудованию в размере не более 65 процентов от стоимости доставленного на объект оборудования второй авансовый выплачивается по факту доставки оборудования на приобъектный склад на основании счетов, выставляемых Подрядчиком, в течение 30 банковских дней со дня доставки, при наличии отгрузочных документов.
Подрядчик по требованию Заказчика в течение 3 (трех) рабочих дней обязан представить все необходимые документы, подтверждающие использование авансового платежа в соответствии с его целевым назначением, в том числе:
копии договоров, заключенных между Подрядчиком и поставщиками, на поставку материалов, машин и оборудования;
счета на оплату материалов и оборудования, выставленные Подрядчику поставщиками;
платежные поручения на оплату материалов и оборудования;
товарно-транспортные накладные, подтверждающие получение материалов и оборудования.
Платежи, покрывающие расходы по страхованию объекта, выплачиваются одновременно с авансовым платежом.
Текущие платежи выплачиваются Заказчиком:
по строительно-монтажным, пуско-наладочным работам в размере не более 80 процентов от стоимости работ, указанных в актах сдачи-приемки работ, выплачиваются в течение 20 банковских дней со дня подписания актов сдачи-приемки работ;
платежи в размере не более 5 процентов от стоимости смонтированного оборудования выплачиваются в течение 20 банковских дней после завершения пуско-наладочных работ.
Платежи по окончании работ по строительно-монтажным, пуско-наладочным работам в размере не более 5 процентов от стоимости работ, указанных в актах сдачи-приемки работ, выплачиваются в течение 20 банковских дней со дня подписания акта приемки законченного строительством объекта приемочной комиссией, (форма КС-14).
Погашение аванса производится путем ежемесячного удержания авансового платежа из суммы, подлежащей выплате Подрядчику за выполненные работы пропорционально стоимости выполненных работ до полного погашения аванса.
Расчеты по настоящему Договору осуществляются в соответствии с графиком финансирования работ и освоения капитальных вложений (приложение № 2) платежными поручениями путем перечисления денежных средств в рублях на расчетный счет Подрядчика, указанный в настоящем Договоре, либо иным способом по согласованию сторон.
Превышение Подрядчиком объемов и стоимости работ, не подтвержденных соответствующим дополнительным соглашением Сторон, оплачиваются Подрядчиком за свой счет при условии, что они не вызваны невыполнением Заказчиком своих обязательств.
Delivery terms:Срок начала проведения работ – не позднее 5-ти рабочих дней с момента подписания Договора, окончание работ – не позднее 30.12.2011г.
Georeferencing:410031, г.Саратов, ул. Первомайская, 42/44
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 29.06.2011 at 11:03
and selected the winner: AO "IuG-SISTEMA plius" – (Bidder 1) (Глебов О.В.) submitting a bid dated of 28.04.2011 20:54
Выполнение работ по монтажу оборудования телемеханики Компас 2.0 для реконструкции средств связи на ПС ХПП для нужд филиала ОАО «МРСК Волги» - «Пензаэнерго» в полном соответствии с техническим заданием
Обоснование: Признать Победителем Открытого запроса предложений участника, занявшего первое место, а именно: ОАО «ЮГ-СИСТЕМА плюс», 350072, г. Краснодар, ул. Московская, 5, с предложением на выполнение работ по монтажу оборудования телемеханики Компас 2.0 для реконструкции средств связи на ПС ХПП для нужд филиала ОАО «МРСК Волги» - «Пензаэнерго», в полном соответствии с техническим заданием (Приложение №1 к настоящему протоколу) на следующих условиях:
• общая стоимость работ: 2 848 769,07 руб. c НДС.
• Срок выполнения работ: начало работ – не позднее 5-ти дней после заключения Договора, окончание работ 30.12.2011г.
• Порядок оплаты: Авансовые платежи выплачиваются Заказчиком:
по строительно-монтажным, пуско-наладочным работам в размере 15 процентов от общего объема стоимости работ выплачиваются на основании счетов, выставляемых Подрядчиком, в течение 20 календарных дней со дня заключения настоящего Договора, но не ранее предоставления или договора страхования в соответствии с разделом 14;
по закупаемому оборудованию в размере 30 процентов от стоимости оборудования, первый авансовый платеж выплачивается на основании счетов, выставляемых Подрядчиком, в течение 20 календарных дней со дня заключении Договора, но не ранее предоставления договора страхования в соответствии с разделом 14;
по закупаемому оборудованию в размере 65 процентов от стоимости доставленного на объект оборудования второй авансовый выплачивается по факту доставки оборудования на приобъектный склад на основании счетов, выставляемых Подрядчиком, в течение 30банковских дней со дня доставки, при наличии отгрузочных документов.
Подрядчик по требованию Заказчика в течение 3 (трех) рабочих дней обязан представить все необходимые документы, подтверждающие использование авансового платежа в соответствии с его целевым назначением, в том числе:
платежные поручения на оплату материалов;
товарно-транспортные накладные, подтверждающие получение материалов.
Платежи, покрывающие расходы по страхованию объекта, выплачиваются одновременно с авансовым платежом.
Текущие платежи выплачиваются Заказчиком:
по строительно-монтажным, пуско-наладочным работам в размере 80 процентов от стоимости работ, указанных в актах сдачи-приемки работ, выплачиваются в течение 20 банковских дней со дня подписания актов сдачи-приемки работ;
платежи в размере 5 процентов от стоимости смонтированного оборудования выплачиваются в течение 20 банковских дней после завершения пуско-наладочных работ.
Платежи по окончании работ по строительно-монтажным, пуско-наладочным работам в размере 5 процентов от стоимости работ, указанных в актах сдачи-приемки работ, выплачиваются в течение 20 банковских дней со дня подписания акта приемки законченного строительством объекта приемочной комиссией (форма № КС-14).
Погашение аванса производится путем ежемесячного удержания авансового платежа из суммы, подлежащей выплате Подрядчику за выполненные работы пропорционально стоимости выполненных работ до полного погашения аванса.
Notifications have been sent to bidders.
Total bids: 2