Installation of lighting systems, power supply and
structured cabling network (SCS) A set of works on the installation of lighting systems, power supply and structured cable network (SCS)
OKPD2 category:
Show all (4 more)
43.21.10.110 Работы по монтажу основных сетей электроосвещения и электроснабжения или электроарматуры, требующие специальной квалификации, в зданиях, сооружениях и на прочих строительных объектах
43.21.10.120 Работы электромонтажные, связанные с установкой приборов
43.21.10.130 Работы по монтажу сетей электроосвещения и электроснабжения и электроарматуры для систем аварийного электроснабжения
43.21.10.140 Работы по монтажу систем пожарной сигнализации и охранной сигнализации
43.21.10.160 Работы по монтажу проводных и кабельных сетей кабельного телевидения в здании
43.21.10.170 Работы электромонтажные по прокладке телекоммуникационной проводки
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
:
30 minutes
Payment terms:
100% postpayment in priority (upon the provision of services) within 10 business days from the date of signing of the Act of completion by both parties. The participant can offer his terms of payment (if necessary, the purchase of materials, structures, products, equipment), but not worse than an advance of 50%, postpayment of 50%.
Delivery terms:
It is necessary to carry out a set of works consisting of
- installation of lighting systems, power supply, structured cable network (SCS) in the territory of the Company at the address: Novosibirsk, st. Sovetskaya, d. 37, 4th floor
Comments: The price of work should include the cost of all costs associated with the performance of work, transportation costs for the delivery of materials / tools and labor to the place of work, the costs of removal and disposal of garbage, obtaining all necessary approvals, opening orders, orders, including supervisory authorities, local authorities, also all taxes and mandatory payments
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.