Request for Proposals No. 922787 
Application chassis repairs of mobile offshore drilling units and rolling stock

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Application chassis repairs of mobile offshore drilling units and rolling stock

Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:30.11.2017 15:00
Bids opening date:01.12.2017 15:00
Last edited:23.11.2017 15:06
Organizer (Initiator):"UK "TATBURNEFT'" OOO
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:artist» monthly up to 5 numbers each month represents a "contracting authority" Act of reconciliation of accounts under this agreement for the current period. In the absence of differences Act of reconciliation is signed and is the basis for payment to contractor accounts payable. In the event of disagreement during mutual Treaty, differences are captured in the Act of reconciliation, the payment under the contract is suspended until the differences.
- the final calculation is made by the employer not later than 90 days after adoption of instruments for work performed (signed acceptance certificates (overhead), invoices and acts of reconciliation of accounts).
Delivery terms:objects "Customer"-the Republic of Tatarstan, Bashkortostan, Samara Oblast, Orenburg oblast, etc. areas of industrial activity of OOO "CC" Tatburneft ".
Georeferencing:423450, Russia, Republic of Tatarstan (Tatarstan), Almetyevsk, Musa Jalil str., 51
Comments:
1. OBLIGATORY ACCEPTANCE OF THE TREATY AS AMENDED BY THE CUSTOMER.
1.1 "executor" undertakes to fill out Appendix No. 1 to this specification as a techno-commercial proposals.
2. involvement of third-party companies to subcontract is allowed only upon written agreement with the "employer" transfer equipment on subcontracting.
3. the executor have qualified staff with experience in the repair of equipment.
4. spare parts required for the operation of the area under repair of equipment purchased and/or manufactured by contractor. Margin on spare parts and materials used no more than 3% from official price manufacturer parts.
5. The positive experience of cooperation "by" with "cc" Tatburneft ".
6. the customer has the right to adjust the value of the contract to decrease/increase the volume of executable works.
7. as a result of ETP contractor should agree with "Customer" routine calculations, calculation parameters, the calculation of the cost of standard hours fulfilment of the area under repair. "Executor" provides for the harmonization of "Customer" norms of the time doing the area under repair. Be sure to provide the qualified commercial offers, with a breakdown of all the articles of expenses after spending the reverse auction. The cost of labor-hours includes all costs "by" related to the area under repair: transport costs, travel expenses, etc. The cost of labor-hours does not take into account the cost of materials and spare parts. "Artist" must provide for harmonization of "Customer" list, the number and cost of materials by type of area under repair. Cost of services according to the type of the area under repair in annex No. 1 maximum and subject only to decrease depending on the flow of spare parts and materials for the defective statements, time of execution of works.
8. List of additional works, which originated during the area of repair, their actual cost is determined according to the defective statements, illustrations, drawings, to additional works and acts of acceptance of executed works, taking into account the cost of one labor hours "Executive Director".
9. In the event of a failure of equipment belonging to the "employer" ("by"), within the warranty period, as well as identifying fact unusable equipment belonging to the "Customer" in the course of performance of works (services), "employer" is entitled to recover from the executor a fine of magnitude the cost of downtime (waste) drilling rig (BU types) on the basis of the cost of one hour of downtime (annex to the agreement). In the absence of idle (non-productive work) drilling rig "employer" has the right to recover from the contractor, a fine in the amount of 150 000 rubles.
10. in case of refusal the warranty of the equipment "employer" has the right to dismantle it without agreement with the executor. On arrival "by" on the object (the well) sides, a Commission composed of competent, the Plenipotentiary representatives of the "Customer" and "Artist" are able to identify the guilty party without further investigation in the Guild terms assigned orders enterprises. If you need to work in the Commission invited representatives of the Office of technological support and supervision of PJSC "Tatneft" or customer representatives well construction. The Commission conducts investigations and determines (sets) the cause of equipment failure, with mandatory registration and signing with the two sides act to investigate the incident.
11. the Commission determines the side admitted the incident directly to the rig floor, on the day of the investigation, if there is no evidence of "Customer", the party had caused the incident, recognizes "the Artist". Which, in case of disagreement with the decision of the Commission after the export of the equipment at the base "Executive Director" (transport provides "executor"), further investigation at its own expense, shall have the right to present evidence of his innocence in incident and rebut the Commission's decision. While conducting further investigation "executor" undertakes to ensure the presence of a representative of the customer and implement its call in advance. Further investigation is performed only on the premises "by" (no investigations on the premises of contractor, subcontractor, if their involvement). Equipment brought on the industrial base "by" on the complaint, should be repaired within 10 working days from the date of delivery of the equipment.
12. The Inquiry Commission shall be constituted by an act of investigation, which are obliged to sign a hand, refraining from signing of the Act is not allowed. In case of refusal of the representative established an investigation the offending party from the signing of the Act, the Act is deemed to be signed in favour of the other party, as in the Act shall be checked. This Act is the basis for reimbursement (payment) the guilty party losses caused by the incident, downtime or unproductive work at the expense of the offending party, including penalties against the customer by a third party. If the guilty party is recognized as the "executor", the Act is the basis for claiming the "employer" in the "Executive Director". Reimbursement (payment) damages, including punitive damages is done through adjustments to decrease the volume of work performed by contractor in the amount of damages (penalty) and payment of work performed, taking into account the deduction of the cost of downtime ( non-productive time) specified in the charges and recognized by contractor claims or left without response within 30 calendar days, or money transfer to the bank account of the customer on the basis of the claim.
13. all the documents you need to duplicate the "Performer" in the address of the customer in electronic format (Excel, Pdf).
14. Application for quotation on the letterhead is required.
15. On this lot, please contact: Vildanov Marat Muzagitovich 8 (8553) 37-01-16 8-919-681-14-65
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 0