Request for Proposals No. 1462022 
Replacing the CO coating in the axes 18-19 railway. Replacement of the TWS coating in the axes 17-18 L-F, Zh-D 5, 6th stages. According to the results of EPB.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
41.10.10.000  Документация проектная для строительства
41.20.40.000  Работы строительные по возведению нежилых зданий и сооружений (работы по строительству новых объектов, возведению пристроек, реконструкции и ремонту зданий)
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:17.03.2020 17:39 (was extended by 39 min, 2 sec)
Last edited:17.03.2020 10:11
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In a commercial offer
Delivery terms:1. Application of EPM-NEZ JSC, Novocherkassk
2. The purpose of the work.
2.1. Restoring the operational suitability of the building of the central heating station, TWS. According to the survey 24 / 13-2-OB, 2014.
3. The list and scope of work performed.
3.1. Replacing the CO coating in the axes 18-19 railway. Replacement of the TWS coating in the axes 17-18 L-F, Zh-D 5, 6th stages.

Note: The costs of installation, dismantling of temporary sites, installation, removal of winches, rigging, devices for lifting material, the contractor must consider in accordance with the developed PPR. These volumes are not included in the list of volumes of work by the customer.
4. Materials, mechanisms, equipment and tools provided by the Contractor.
4.1. Work is performed from customer’s material
4.2. Lifting mechanisms and mechanisms for loading and installation works are provided by the contractor.
4.3. Electric welding and gas cutting equipment, power tools, oxygen, propane, auxiliary materials are provided by the contractor. 5. Requirements for the Contractor.
5.1. The Contractor must have the necessary production and human resources to carry out this work, be a member of a self-regulatory organization (SRO).
5.2. To clarify the conditions for the performance of work, familiarization with the object, it is desirable that the representatives of the Contractor arrive at the Customer.
5.3 The Contractor in his commercial proposal indicates the payment procedure and other conditions.
5.4 Certification of the head, engineering and industrial safety and labor protection performers at the public educational institution. According to Appendix No. 1.
5.5 Ensuring OSH measures for safe production methods at the facility.
5.6 The Contractor must have a specialist in HSE.
5.7. The Contractor shall, prior to commencement of work, provide a work schedule.
5.8 The Contractor performs visual measuring control of welded joints with the registration of the protocol.
5.8.1 The Contractor monitors the volume of exported construction waste and scrap metal through the weight.
5.9 The Contractor provides a local estimate.
6. Terms of work
6.1 Work at the existing enterprise in the technological windows provided, depending on the loading of equipment.
6.2. Development of PPR or PPRK is carried out by the Contractor.
6.3 Lifting mechanisms, lifting devices in accordance with PPR for installation are provided by the Contractor.
6.4 Cars for transportation of materials to the facility from warehouses, as well as scrap metal to the Customer’s warehouse are provided by the Contractor
6.5 Object multi-span single-story industrial building.
7. Terms of work.
7.1. Start of work — April 2020
7.2. Completion of work - November 2020
8. The list of documents required for the execution of orders - tolerances at the enterprise is attached to the terms of reference. Annex 1
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who participated in the procedure (made a proposal), before the deadline for accepting applications, is obligated to upload the following documents to the system:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for work (see file "Proposal for work")
8. Contact person: Tetslav Vladimir Edvinovich - Head
OEiNZiS, phone 8 86 532-9-42-13, fax 8 86352 9-46-18
E-mail: VTetslov@energoprom.ru
9. Certificate of conformity to requirements of ISO 9001: 2008 (if available)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Requirements for the Contractor:
- Permitting documents (SRO, licenses, admissions).
- Development by the executor of PPR, PPRK, RTI.
- Availability of certification of the head, engineers, industrial safety workers at the public educational institution.
- The presence of medical admission of personnel to work at the public educational institution
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 18.03.2020 at 15:34
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 6. More >>