Request for Proposals No. 3170051 
Concrete In KP, it is mandatory to specify the price with and without delivery.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Concrete
In KP, it is mandatory to specify the price with and without delivery.
Fix the price for 2 weeks.

OKPD2 category:
Total price:Price not specified
Contract award criteria:Price incl. VAT (show both prices)
Currency:RUB
Publication date:
Bid submission deadline:16.12.2022 10:04 (was extended by 4 min, 9 sec)
Last edited:14.12.2022 11:13
Organizer (Initiator):POLYMETAL TRADING, LTD
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:100% post payment upon receipt of the corresponding batch of goods and materials to the intermediate warehouse of the TD in the village of Nbestyah within 20 banking days
Delivery terms:By the supplier's forces to the intermediate warehouse of the TD in the village of Nbestyah
Georeferencing:Republic of Sakha (Yakutia), Megino-Kangalassky ulus, Nizhny Bestyakh
Comments:
1)Please note that participation in the competition means acceptance of the buyer's contract form.
2) It is necessary to attach a Commercial offer in electronic form.
3) When issuing KP, it is necessary to indicate the manufacturer of the product, availability, production time, delivery time to the supplier's warehouse, cargo dimensions (weight, volume, number of containers), the point of dispatch;
4) The products must be new, not used;
5) Certificates of conformity, a passport, a document confirming the quality must be attached to the products
;
6) Before shipment, it is necessary to fill out a packing list (see the example of filling in the procurement
documentation), paste the packing list on the packaging with the goods, send copies of the documents to the customer by e-mail.
We draw your attention to the fact that this request is not a notice of a tender (public tender) or a public offer and is not regulated by Articles 447 – 449 Part 1 of the Civil Code of the Russian Federation, Articles 1057 – 1061 Part 2 of the Civil Code of the Russian Federation. Thus, this procedure does not impose an appropriate amount of civil obligations on the Organizer and reserves the right to refuse all Proposals received for any reason or terminate the selection procedure at any time, without incurring any responsibility to the Participants.
In the proposed KP, specify:
1) Separately the cost for the goods and separately the cost for delivery;
2) Certificates of conformity;
3) Links to the manufacturer;
4) Payment terms;
5) Delivery time;
6) The supplier's attitude to the supplied products (manufacturer, free seller, official dealer);
7) Warranty.
8) Full compliance of the name of the goods and materials in the commercial offers (hereinafter in the shipping documents) requested in the purchase.
9) The requirement to observe the temperature regime when transporting cargo in the conditions of the Far North
10) Responsible - Malyshev Anatoly Andreevich. Tel. +7(4112)26-31-82, ext.214
MalyshevAA@polymetal.ru
The design of the package (transport container) must provide the possibility of transport processing of goods by any mechanical device, including a forklift, cranes, trolleys or manual manipulation, depending on the dimensions and weight of the cargo (goods). The design of the package must be made in such a way as not to interfere with free access to the contents of the cargo space.
Rolled metal products (pipes, fittings, corners, sheets, etc.) must be securely tied (with wire, wire rod or metal tape) into bundles (packages). The bundle of cargo spaces must withstand the weight of the cargo in the bundle during loading and unloading operations and exclude the loss of rolled metal from the bundle.
Each package must have a UL (or a factory tag from the manufacturer).
Also, to prevent a shortage of goods and materials during delivery, a list with complete data (weight, number of pieces in 1 place)- to the list of goods and materials that cannot be visually calculated in a slice (pipe, channel, etc.).

MANDATORY COMPLIANCE WITH PACKAGING ACCORDING TO THE RECOMMENDATION FOR THE CARRIAGE OF GOODS IN THE RCS
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 13.01.2023 at 03:20
и отклонил все заявки
Обоснование: Отмена потребности.
Notifications have been sent to bidders.
Total bids: 3. More >>