Request for Proposals # 4587661
... Expand
Conducting a non-governmental examination of the design and working documentation for the 2nd stage of technical re-equipment of the recycling boiler house with the installation of equipment for steam utilization and power generation of the branch El 6 Chelyabinsk
Assessment of the design and tax code for compliance with the Requirement Specifications, engineering surveys, urban planning, technical regulations, requirements of the Joint venture, GOST, GRC RF, etc. Requirements
Specifications in the attached documentation to the procedure. Collapse
| Archived | "El 6 Chelyabins" | 18.09.2026 10:14 |
Request for Proposals # 4580333
... Expand
Carrying out construction and installation works: "Restoration of special equipment No. 104
(AC) - finishing works;
(VC)-installation of a water supply and sanitation system;
(S)-re-equipment of the heating, ventilation and air conditioning system;
(PS)-installation of a fire alarm system;
(SS)-installation of a communication network;
(EOM)-electrical work. Collapse
| Archived | "El 6 Chelyabins" | 10.09.2026 12:00 |
Request for Proposals # 4548947
... Expand
Carrying out construction and installation works: "Restoration of special equipment No. 104
(AC) - finishing works.
(VC)-installation of a water supply and sanitation system.
(s)-re-equipment of a heating, ventilation and air conditioning system.
(PS)-installation of a fire alarm
system (SS)-installation of a communication network.
(EOM)-electrical work. Collapse
| Archived | "El 6 Chelyabins" | 26.08.2026 12:00 |
Request for Proposals # 4537333
... Expand
Conducting a non-governmental expert examination of the RD on the project of technical re-equipment of block No. 5 of the graphite department of the branch El 6 Chelyabinsk
Assessment of RD for compliance with Requirement Specifications, engineering surveys, urban planning, technical regulations, requirements of the Joint venture, GOST, GRC RF, etc. Requirements
Specifications in the attached documentation to the procedure. Collapse
| Archived | "El 6 Chelyabins" | 31.07.2026 10:00 |
Request for Proposals # 4372610
... Expand
Delivery and execution of a turn-key complex of in-line scales for unloading from the refrigerator of a rotary kiln PV2.5x40
Delivery and execution of a turn-key complex of in-line scales for unloading from the refrigerator of a rotary kiln PV2.5x40 Collapse
| Archived | "El 6 Chelyabins" | 01.06.2026 08:16 |
Request for Proposals # 4439156
Development of a technical project for the water intake of the "Electrode" underground water deposit
| Archived | "El 6 Chelyabins" | 15.05.2026 12:00 |
Request for Proposals # 4346169
Development of working and estimate documentation "Organization of the crushing unit in Block No. 5"
The project includes all the necessary sections, such as AK, KJ, KM, TX, EM, OV and others.
| Archived | "El 6 Chelyabins" | 12.03.2026 20:00 |
Request for Proposals # 4313797
Purchase of traction machines (smoke pumps) in quantity
| Archived | "El 6 Chelyabins" | 16.02.2026 06:00 |
Request for Proposals # 4217331
... Expand
manufacturing and installation of service platforms, Pl14, Pl15.
Manufacturing and installation of platforms Pl14, Pl15
. Manufacturing of service platforms and ladders for controlling the gate valves of the aspiration pipelines of the heat recovery unit. Collapse
| Archived | "El 6 Chelyabins" | 07.11.2025 12:00 |
Request for Proposals # 4149084
For the development of working and estimate documentation "Technical re-equipment
Inter-shop chlorine pipelines of the graphite section of Block No. 4"
execution of project work with the issuance of a POI
| Archived | "El 6 Chelyabins" | 08.09.2025 12:00 |
Request for Proposals # 4099778
Design of the granulation and briquetting site of carbon-containing material
execution of project work with the issuance of a POI
| Archived | "El 6 Chelyabins" | 25.07.2025 12:00 |
Request for Proposals # 4087639
... Expand
"Overhaul of the wall fencing
of the south side of the boiler house building No. 1."
Restoration of the wall fence of boiler room No. 1 on the south side of the building, due to changes in the working documentation 184-AC ed.1. The scope of work performed, in accordance with the Defective Statement No. 27, estimate No. 1066, RD 184-AS of revision 1. Collapse
| Archived | "El 6 Chelyabins" | 29.06.2025 19:00 |
Request for Proposals # 4087055
... Expand
"Overhaul of the wall fencing
of the south side of the boiler house building No. 1."
Restoration of the wall fence of boiler room No. 1 on the south side of the building, due to changes in the working documentation 184-AC ed.1. The scope of work performed, in accordance with the Defective Statement No. 27, estimate No. 1066, RD 184-AS of revision 1. Collapse
| Archived | "El 6 Chelyabins" | 26.06.2025 06:19 |
Request for Proposals # 4051186
... Expand
Increasing the productivity of the El 6 Chelyabinsk calcination furnace, Stage 2: "Technical re-equipment of the recycling boiler room with the installation of equipment for steam utilization and power generation"
LOT No. 1 "Technical re-equipment of a recycling boiler house with the installation of equipment for steam utilization and power generation." Thermal and mechanical equipment.
LOT NUMBER 2 . Electrical equipment and automated process control systems TP PVM. Collapse
| Archived | "El 6 Chelyabins" | 11.06.2025 15:00 |
Request for Proposals # 4056863
... Expand
"Overhaul of the wall fencing
of the south side of the boiler house building No. 1."
Restoration of the wall fence of boiler room No. 1 on the south side of the building, due to changes in the working documentation 184-AC ed.1. The scope of work performed, in accordance with the Defective Statement No. 27, estimate No. 1066, RD 184-AS of revision 1. Collapse
| Archived | "El 6 Chelyabins" | 09.06.2025 12:00 |
Request for Proposals # 3958537
... Expand
manufacturing and installation of service platforms, ladders and fences "Heat recovery units from the calcination furnace" El 6 Chelyabinsk, Block No. 5, Calcination department.
Manufacturing and installation of platforms Pl9, Pl10,
stair railings LOg1, hatch opening Shch5, platforms Pl11... Pl13, KMD development is required. The required amount of work is prescribed in Permit No. 1,2,3 and is an addition to the already installed sites. Collapse
| Archived | "El 6 Chelyabins" | 03.03.2025 12:00 |
Request for Proposals # 3945731
... Expand
manufacturing and installation of service platforms, ladders and fences "Heat recovery units from the calcination furnace" El 6 Chelyabinsk, Block No. 5, Calcination department.
Manufacturing and installation of platforms Pl9, Pl10,
stair railings LOg1, hatch opening Shch5, platforms Pl11... Pl13, KMD development is required. The required amount of work is prescribed in Permit No. 1,2,3 and is an addition to the already installed sites. Collapse
| Archived | "El 6 Chelyabins" | 20.02.2025 12:00 |
Request for Proposals # 3814734
... Expand
Overhaul of aspiration of the vibropress and mixing machines
in the Mixing and pressing department of unit No. 5
Major repairs are carried out in accordance with the terms of reference (Requirements Specification), defective statement, estimate No. 931: The work will be carried out inside the existing workshop. The workshop is not heated. Collapse
| Archived | "El 6 Chelyabins" | 15.10.2024 12:00 |
Request for Proposals # 3784083
Insulation of openings, heating networks, installation of parapet covers in the ABC of Block No. 6
According to the VD and estimated documentation
| Archived | "El 6 Chelyabins" | 17.09.2024 10:00 |
Request for Proposals # 3777810
... Expand
Overhaul of the wall fence on the east side of the boiler house building No. 1
To carry out a complex of dismantling and construction and installation work on the overhaul of the wall on the east side of the boiler house building along the row I`/G in axes 1-8. Collapse
| Archived | "El 6 Chelyabins" | 06.09.2024 12:00 |