Request for Proposals # 4372610
... Expand
Delivery and execution of a turn-key complex of in-line scales for unloading from the refrigerator of a rotary kiln PV2.5x40
Delivery and execution of a turn-key complex of in-line scales for unloading from the refrigerator of a rotary kiln PV2.5x40 Collapse
| Archived | "El 6 Chelyabins" | 20.04.2026 12:00 |
Request for Proposals # 4346169
Development of working and estimate documentation "Organization of the crushing unit in Block No. 5"
The project includes all the necessary sections, such as AK, KJ, KM, TX, EM, OV and others.
| Archived | "El 6 Chelyabins" | 12.03.2026 20:00 |
Request for Proposals # 4313797
Purchase of traction machines (smoke pumps) in quantity
| Archived | "El 6 Chelyabins" | 16.02.2026 06:00 |
Request for Proposals # 4217331
... Expand
manufacturing and installation of service platforms, Pl14, Pl15.
Manufacturing and installation of platforms Pl14, Pl15
. Manufacturing of service platforms and ladders for controlling the gate valves of the aspiration pipelines of the heat recovery unit. Collapse
| Archived | "El 6 Chelyabins" | 07.11.2025 12:00 |
Request for Proposals # 4149084
For the development of working and estimate documentation "Technical re-equipment
Inter-shop chlorine pipelines of the graphite section of Block No. 4"
execution of project work with the issuance of a POI
| Archived | "El 6 Chelyabins" | 08.09.2025 12:00 |
Request for Proposals # 4099778
Design of the granulation and briquetting site of carbon-containing material
execution of project work with the issuance of a POI
| Archived | "El 6 Chelyabins" | 25.07.2025 12:00 |
Request for Proposals # 4087639
... Expand
"Overhaul of the wall fencing
of the south side of the boiler house building No. 1."
Restoration of the wall fence of boiler room No. 1 on the south side of the building, due to changes in the working documentation 184-AC ed.1. The scope of work performed, in accordance with the Defective Statement No. 27, estimate No. 1066, RD 184-AS of revision 1. Collapse
| Archived | "El 6 Chelyabins" | 29.06.2025 19:00 |
Request for Proposals # 4087055
... Expand
"Overhaul of the wall fencing
of the south side of the boiler house building No. 1."
Restoration of the wall fence of boiler room No. 1 on the south side of the building, due to changes in the working documentation 184-AC ed.1. The scope of work performed, in accordance with the Defective Statement No. 27, estimate No. 1066, RD 184-AS of revision 1. Collapse
| Archived | "El 6 Chelyabins" | 26.06.2025 06:19 |
Request for Proposals # 4051186
... Expand
Increasing the productivity of the El 6 Chelyabinsk calcination furnace, Stage 2: "Technical re-equipment of the recycling boiler room with the installation of equipment for steam utilization and power generation"
LOT No. 1 "Technical re-equipment of a recycling boiler house with the installation of equipment for steam utilization and power generation." Thermal and mechanical equipment.
LOT NUMBER 2 . Electrical equipment and automated process control systems TP PVM. Collapse
| Archived | "El 6 Chelyabins" | 11.06.2025 15:00 |
Request for Proposals # 4056863
... Expand
"Overhaul of the wall fencing
of the south side of the boiler house building No. 1."
Restoration of the wall fence of boiler room No. 1 on the south side of the building, due to changes in the working documentation 184-AC ed.1. The scope of work performed, in accordance with the Defective Statement No. 27, estimate No. 1066, RD 184-AS of revision 1. Collapse
| Archived | "El 6 Chelyabins" | 09.06.2025 12:00 |
Request for Proposals # 3958537
... Expand
manufacturing and installation of service platforms, ladders and fences "Heat recovery units from the calcination furnace" El 6 Chelyabinsk, Block No. 5, Calcination department.
Manufacturing and installation of platforms Pl9, Pl10,
stair railings LOg1, hatch opening Shch5, platforms Pl11... Pl13, KMD development is required. The required amount of work is prescribed in Permit No. 1,2,3 and is an addition to the already installed sites. Collapse
| Archived | "El 6 Chelyabins" | 03.03.2025 12:00 |
Request for Proposals # 3945731
... Expand
manufacturing and installation of service platforms, ladders and fences "Heat recovery units from the calcination furnace" El 6 Chelyabinsk, Block No. 5, Calcination department.
Manufacturing and installation of platforms Pl9, Pl10,
stair railings LOg1, hatch opening Shch5, platforms Pl11... Pl13, KMD development is required. The required amount of work is prescribed in Permit No. 1,2,3 and is an addition to the already installed sites. Collapse
| Archived | "El 6 Chelyabins" | 20.02.2025 12:00 |
Request for Proposals # 3814734
... Expand
Overhaul of aspiration of the vibropress and mixing machines
in the Mixing and pressing department of unit No. 5
Major repairs are carried out in accordance with the terms of reference (Requirements Specification), defective statement, estimate No. 931: The work will be carried out inside the existing workshop. The workshop is not heated. Collapse
| Archived | "El 6 Chelyabins" | 15.10.2024 12:00 |
Request for Proposals # 3784083
Insulation of openings, heating networks, installation of parapet covers in the ABC of Block No. 6
According to the VD and estimated documentation
| Archived | "El 6 Chelyabins" | 17.09.2024 10:00 |
Request for Proposals # 3777810
... Expand
Overhaul of the wall fence on the east side of the boiler house building No. 1
To carry out a complex of dismantling and construction and installation work on the overhaul of the wall on the east side of the boiler house building along the row I`/G in axes 1-8. Collapse
| Archived | "El 6 Chelyabins" | 06.09.2024 12:00 |
Request for Proposals # 3750445
Transfer of checkpoint-6
Repair of a built-in room measuring 7.4x3.28m in order to accommodate a checkpoint.
| Archived | "El 6 Chelyabins" | 19.08.2024 10:00 |
Request for Proposals # 3750472
Reinforcement of the walls of the 1st and 2nd floors in the axes 1-3/V-G ABC Block 6.
As part of the repair of the ABC building of Block 6, it became necessary to strengthen the walls.
| Archived | "El 6 Chelyabins" | 19.08.2024 10:00 |
Request for Proposals # 3756768
Delivery of cranes with a heating jacket according to the Requirements Specification.
Delivery of cranes with a heating jacket according to the Requirements Specification. Payment is deferred for 45 calendar days.
| Archived | "El 6 Chelyabins" | 16.08.2024 12:00 |
Request for Proposals # 3750849
... Expand
Overhaul of the wall fence on the east side of the boiler house building No. 1
To carry out a complex of dismantling and construction and installation work on the overhaul of the wall on the east side of the boiler house building along the row I`/G in axes 1-8. Collapse
| Archived | "El 6 Chelyabins" | 16.08.2024 10:00 |
Request for Proposals # 3752952
Overhaul of the LG-250 belt elevator No.127
In the mixing and pressing department of unit No. 5
Overhaul of the LG-250 belt elevator No.127: replacement of the belt, buckets, gearbox.
| Archived | "El 6 Chelyabins" | 12.08.2024 12:00 |