Request for Proposals # 4454008
Execution of work on the overhaul of the unified hydro transmission
UGP 750/202PR2, Ural Steel JSC.
Execution of work on the overhaul of the unified hydro transmission
UGP 750/202PR2, Ural Steel JSC.
| Current | AO «Ural'skaia Stal'» | 04.06.2026 12:00 |
Request for Proposals # 4452309
... Expand
Execution of work on the overhaul of the railway track of non-public use LLC "Orenburgvtorchermet" Orenburg, for the needs of LLC "Orenburgvtorchermet" in 2026, according to estimates and technical specifications
Execution of work on the overhaul of the railway track of non-public use LLC "Orenburgvtorchermet" Orenburg, for the needs of LLC "Orenburgvtorchermet" in 2026, according to estimates and technical specifications Collapse
| Current | AO «Ural'skaia Stal'» | 29.05.2026 12:00 |
Request for Proposals # 4441574
... Expand
Overhaul of the PT-60-90/13 steam turbine and auxiliary equipment of the turbine generator in the amount of budget No. 25/26 (M,F) and in accordance with the terms of Reference attached to this request, in the period July-August 2026
Overhaul of the PT-60-90/13 steam turbine and auxiliary equipment of the turbine generator in the amount of budget No. 25/26 (M,F) and in accordance with the terms of Reference attached to this request, in the period July-August 2026 Collapse
| Current | AO «Ural'skaia Stal'» | 28.05.2026 17:00 |
Request for Proposals # 4449310
Implementation of the SMR for the event of Ural Steel JSC: "Temporary power supply of the construction site in the production building of LPC-2"
Estimates No. 23911-ES-LS, 23911-AS1-LS, 23911-AS2-LS, 23892-EM-LS, estimate base 2001
| Current | AO «Ural'skaia Stal'» | 28.05.2026 12:00 |
Request for Proposals # 4411206
... Expand
Execution of work on the current repair of a return water line with a diameter of 820 mm from the LPC-1 to the pumping station No. 4 of the Central Heating Complex of Ural Steel JSC in 2026 (according to see No. 11t/25, see b. 2001)
Execution of works according to the requirements of the Terms of Reference, and see documentation Collapse
| Current | AO «Ural'skaia Stal'» | 27.05.2026 13:00 |
Request for Proposals # 4421201
... Expand
Execution of work on the installation of sections of the technical oxygen pipeline from the control room No. 2 (autogenous needs of the 2nd stage Dn100, to the explosive compartment DN50) and the transfer of heat and oxygen metering units to the DC. JSC "Ural Steel".
Execution of work on the installation of sections of the technical oxygen pipeline from the control room No. 2 (autogenous needs of the 2nd stage Dn100, to the explosive compartment DN50) and the transfer of heat and oxygen metering units to the DC. JSC "Ural Steel". Collapse
| Current | AO «Ural'skaia Stal'» | 27.05.2026 12:00 |
Request for Proposals # 4447972
... Expand
Installation and dismantling of non-invasive wooden scaffolding in the in-block space of the KtK-35-3 air separation unit No. 4 at Ural Steel JSC in August-September 2026.
Contractor's materials
Installation and disassembly of wooden non-invasive scaffolding at a height of up to 20 m, Suspension / transfer of the working cable.
Estimates. the cost of SMR (without materials) in 2001 prices = 6,172 rubles. Collapse
| Current | AO «Ural'skaia Stal'» | 27.05.2026 12:00 |
Request for Proposals # 4227539
... Expand
Work on the overhaul of boiler No. 7 of the Ural Steel CHPP JSC according to estimates No. 99/24 and 34/25 and technical specifications in 2026.
Work on the overhaul of boiler No. 7 of the Ural Steel CHPP JSC according to estimates No. 99/24 and 34/25 and technical specifications in 2026. Collapse
| Current | AO «Ural'skaia Stal'» | 26.05.2026 12:00 |
Request for Proposals # 4366653
Performing maintenance and repair work on the VOLVO FM-TRUCK in 2026 according to the terms of reference.
Performing maintenance and repair work on the VOLVO FM-TRUCK in 2026 according to the terms of reference.
| Current | AO «Ural'skaia Stal'» | 26.05.2026 12:00 |
Request for Proposals # 4430107
... Expand
Maintenance of screw compressors DEN-160 SHM (3 units) and adsorption dryer ALD-1650 (1 unit) at KHP JSC Ural Steel
Maintenance of screw compressors DEN-160 SHM (2 units) and adsorption dryer ALD-1650 (1 unit) at the KHP of Ural Steel JSC in September 2026. Collapse
| Current | AO «Ural'skaia Stal'» | 26.05.2026 12:00 |
Request for Proposals # 4448770
... Expand
Execution of construction and installation works on the event "Complex for the production of rolled products (Roof Repair)" according to estimates No. 23897-AS1-LS and technical specifications.
Execution of construction and installation works on the event "Complex for the production of rolled products (Roof Repair)" according to estimates No. 23897-AS1-LS and technical specifications. Collapse
| Current | AO «Ural'skaia Stal'» | 26.05.2026 12:00 |
Request for Proposals # 4453566
Flame Cutting Equipment
Flame Cutting Equipment
| Current | AO «Ural'skaia Stal'» | 26.05.2026 12:00 |
Request for Proposals # 4453632
Welding equipment for Ural Steel JSC
Welding equipment for Ural Steel JSC
| Current | AO «Ural'skaia Stal'» | 26.05.2026 12:00 |
Request for Proposals # 4287068
... Expand
Execution of routine maintenance of shelter No. 436 (groundwater drainage) in the amount of budget No. 49t/24 in the period from 06/01/2026 to 11/30/2026
Current repair of shelter No. 436 (groundwater drainage) in the amount of budget No. 49t/24 in the period from 06/01/2026 to 11/30/2026 Collapse
| Current | AO «Ural'skaia Stal'» | 25.05.2026 17:00 |
Request for Proposals # 4444229
... Expand
Graphitized electrodes of the UHP brand with a diameter of 610x2400/2700mm and additional nipples for Ural Steel JSC delivery of the specified volume in the period of the 4th quarter of 2026 in uniform batches (60-120 tons/month)
Please NOTE:!! Products in accordance with the Requirements Specification Collapse
| Current | AO «Ural'skaia Stal'» | 25.05.2026 16:00 |
Request for Proposals # 4192918
... Expand
Repair and testing of absorbing devices of the SH2B-90 drawing 106.02.000-2 sb, PMK-110K-23 (3002.35.00.010-01 BMZ Management Company) diesel locomotives of the TEM18, TEM18DM, TEM2UM, TEM7A, 2TE116 series of Ural Steel JSC in 2025-2027.
In accordance with the Customer's need for repair and testing of absorbing devices, 20 absorbing devices 1 time per year. Delivery by the Customer. Repairs based on the Contractor. Collapse
| Current | AO «Ural'skaia Stal'» | 25.05.2026 12:00 |
Request for Proposals # 4422277
I-40A oil and M-14G2TSS oil (bulk)
delivery of oils by railway transport
| Current | AO «Ural'skaia Stal'» | 25.05.2026 12:00 |
Request for Proposals # 4439895
... Expand
Repair of pipelines of the medium-pressure boiler house of the Ural Steel CHPP JSC according to estimates No. 27t/24,141t/24, 70t/25, 71t/25 and technical specifications in 2026.
Repair of pipelines of the medium-pressure boiler house of the Ural Steel CHPP JSC according to estimates No. 27t/24,141t/24, 70t/25, 71t/25 and technical specifications in 2026. Collapse
| Current | AO «Ural'skaia Stal'» | 25.05.2026 12:00 |
Request for Proposals # 4442899
... Expand
Magnesia-lime flux for GMP Ural Steel JSC according to Requirements Specification No. 29st-21 dated Jan. 2022 (delivery period June-December 2026) according to statistical requirements.
Shipment of products is made according to bids of the plant.
Magnesia-lime flux for GMP Ural Steel JSC according to Requirements Specification No. 29st-21 dated Jan. 2022 (delivery period June-December 2026) according to statistical requirements.
Shipment of products is made according to bids of the plant. Collapse
| Current | AO «Ural'skaia Stal'» | 25.05.2026 12:00 |
Request for Proposals # 4450332
... Expand
The work on the overhaul of the roof, the installation of drainage of the parapet of the workshop building at the Orenburg branch for the needs of LLC "Orenburgvtorchermet" in 2026. According to estimates and technical specifications.
The work on the overhaul of the roof, the installation of drainage of the parapet of the workshop building at the Orenburg branch for the needs of LLC "Orenburgvtorchermet" in 2026. According to estimates and technical specifications. Collapse
| Current | AO «Ural'skaia Stal'» | 25.05.2026 12:00 |