Request for Proposals # 4576626
Preliminary commercial work on
the analysis of the contractor market for drilling and related work at
the Kvahona subsoil site (Kamchatka Territory).
| Current | "GRK "BYSTRINSKOE" OOO | 11.09.2026 10:00 |
Request for Proposals # 4567774
... Expand
As part of the ongoing announcement, Bystrinskoye GRC LLC offers to perform a full range of EPC services and works under the project: "Open storage area for SGM OF goods and equipment" including:
• Performing a comprehensive survey with the production of topography;
• Development of Working documentation;
• Development of Estimate documentation;
• Supply of equipment and materials;
• Construction and installation works;
• Commissioning works;
• Author's supervision.
Performing a comprehensive survey with the production of topography;
Development of Working documentation;
Development of Estimate documentation;
Supply of equipment and materials;
Construction and installation works;
Commissioning works;
Author's supervision. Collapse
| Current | "GRK "BYSTRINSKOE" OOO | 04.09.2026 17:00 |
Request for Proposals # 4573635
Selection of a Supplier for the provision of services for the examination of industrial safety of technical devices, structures of hazardous production facilities LLC "GRK "Bystrinskoe"
| Current | "GRK "BYSTRINSKOE" OOO | 31.08.2026 10:00 |
Request for Proposals # 4567904
Selection of a Supplier for the provision of services related to the repair and maintenance of ESMO CAP for LLC "GRK "Bystrinskoe".
| Archived | "GRK "BYSTRINSKOE" OOO | 26.08.2026 10:00 |
Request for Proposals # 4567716
... Expand
As part of the ongoing announcement, LLC "GRK "Bystrinskoe" offers to carry out design and survey work on the project: "Closed warehouse for storage of goods and equipment of SGM OF" including:
• Performing a comprehensive examination;
• Performing engineering surveys;
• Development of project documentation;
• Development of working documentation;
• Development of estimate documentation;
• Documentation for the withdrawal of the asset (capital construction object) of their operation – TERl;
• Support of the Customer's procurement procedure;
• Author's supervision.
design and survey work on the project: "Closed warehouse for the storage of goods and equipment SGM OF" Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 25.08.2026 17:00 |
Request for Quotations # 4564716
Choosing a Supplier of ceramic and fireclay crucibles for LLC "GRK "Bystrinskoe".
| Archived | "GRK "BYSTRINSKOE" OOO | 24.08.2026 10:00 |
Request for Proposals # 4515305
... Expand
Construction and installation works at the facility within the framework of the project: "Technical re-equipment of the automated system of analytical control of pulp products of the Processing plant" LLC "GRK "Bystrinskoe".
Construction and installation works at the facility within the framework of the project: "Technical re-equipment of the automated system of analytical control of pulp products of the Processing plant" LLC "GRK "Bystrinskoe". Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 21.08.2026 17:00 |
Request for Quotations # 4562550
Selection of the Supplier of running gear elements of Liebherr bulldozers for LLC "GRK "Bystrinskoe"
| Archived | "GRK "BYSTRINSKOE" OOO | 21.08.2026 10:00 |
Request for Quotations # 4564222
Choosing a Supplier of Tire protection circuits for LLC "GRK "Bystrinskoe"
| Archived | "GRK "BYSTRINSKOE" OOO | 21.08.2026 10:00 |
Request for Proposals # 4560815
... Expand
As part of the ongoing procurement procedure, Bystrinskoye GRC LLC proposes to perform a comprehensive survey to determine the technical condition of the facilities under the project: "Restoration of the railway track and artificial structures at the sites: Gazimursky Plant station - art. Bystrinskaya-Peripheral Park" on sites:
1) section of the railway station Gazimursky Plant-station Bystrinskaya; the length of the main route is 11.95 km;
2) section of the railway station Bystrinskaya is a peripheral park; the length of the railway track (single–track section) is 6,023 km.
a comprehensive survey with the determination of the technical condition of the facilities under the project: "Restoration of the railway track and artificial structures on the sites. Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 20.08.2026 23:00 |
Request for Proposals # 4560813
... Expand
As part of the ongoing procurement procedure, Bystrinskoye GRC LLC offers to carry out engineering surveys (engineering and geodetic, engineering and geological) on the project "Restoration of the railway track and artificial structures at the sites: Gazimursky Plant station - art. Bystrinskaya-Peripheral park" in the sections:
1) section of the railway station Gazimursky Plant-station Bystrinskaya; the length of the main route is 11.95 km;
2) section of the railway station Bystrinskaya is a peripheral park; the length of the railway track (single–track section) is 6,023 km.
execution of engineering surveys on the project "Restoration of the railway track and artificial structures on the sites:
st. Gazimursky plant-st. Bystrinskaya- Peripheral Park" Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 19.08.2026 10:23 |
Request for Quotations # 4559194
The choice of the Supplier of Spare parts Komatsu for LLC "GRK "Bystrinskoe"
| Archived | "GRK "BYSTRINSKOE" OOO | 19.08.2026 10:00 |
Request for Quotations # 4553854
Selection of the Supplier "Piles (August 2026,8250)" for LLC "GRK Bystrinskoe"
| Archived | "GRK "BYSTRINSKOE" OOO | 18.08.2026 10:00 |
Request for Proposals # 4557173
Selection of a Supplier to perform work on stability calculations and the optimal choice of the internal power supply scheme of Bystrinskoye GRC LLC
| Archived | "GRK "BYSTRINSKOE" OOO | 18.08.2026 10:00 |
Request for Proposals # 4556089
Selection of the Contractor for the provision of services for the maintenance of equipment for natural exhaust ventilation systems of the enrichment plant LLC "GRK "Bystrinskoe"
| Archived | "GRK "BYSTRINSKOE" OOO | 17.08.2026 10:00 |
Request for Proposals # 4542507
... Expand
execution of construction and installation works at the facility: Modernization of the OF grinding site (installation of high-pressure grinding rollers)
execution of construction and installation works at the facility: Modernization of the OF grinding site (installation of high-pressure grinding rollers) Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 16.08.2026 17:00 |
Request for Proposals # 4536895
... Expand
Selection of a Contractor to perform a full range of commissioning works, including the program of commissioning works, taking into account the Customer's requirements for the project of Modernization of the OF grinding site (installation of high-pressure grinding rollers) and commissioning, including the program of commissioning works, taking into account the Customer's requirements of the Complex of projects for the development of the GRC Processing plant "Bystrinskoye" to ensure the productivity of 13 million tons of ore per year Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 16.08.2026 10:00 |
Request for Proposals # 4518907
... Expand
a full range of services and works on the modernization of the boiler house and heating networks to the project "Improving the microclimate in the production departments of the". Including:
• Comprehensive examination
• Development of documentation for technical re-equipment and working documentation
• Development of Estimate documentation
• Passing an Industrial safety Examination
• Manufacture and supply of materials and equipment
• Construction and installation works
• Commissioning and testing under load
• Author's supervision
implementation of a full range of services and works on the modernization of the boiler house and heating networks to the project "Improving the microclimate in the production departments of the Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 14.08.2026 17:00 |
Request for Proposals # 4542354
... Expand
complex of technical operations and organizational actions to maintain and restore the serviceable or operable condition of the Equipment and restore the life of the Equipment or its components (maintenance and repair)
Repair of enrichment plant equipment Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 14.08.2026 17:00 |
Request for Proposals # 4548683
... Expand
work on the adjustment of the estimated documentation based on changes in the working documentation for the facility: Modernization of the OF grinding site (installation of high-pressure grinding rollers).
work on the adjustment of the estimated documentation based on changes in the working documentation for the facility: Modernization of the OF grinding site (installation of high-pressure grinding rollers). Collapse
| Archived | "GRK "BYSTRINSKOE" OOO | 14.08.2026 17:00 |