Selection of suppliers to participate in the tender for the construction of a new warehouse / production building with a free-standing boiler room with a total area of 11 thousand sq. m. of JDE (Jacobs Douwe Egberts Rus). The site is located at...
Selection of suppliers to participate in the tender for the construction of a new warehouse / production building with a free-standing boiler room with a total area of 11 thousand sq. m. of JDE (Jacobs Douwe Egberts Rus). The site is located at the address: 188508, Leningrad region, Lomonosovsky district, 8th Passage (Sev.Part of the Gorelovo Ter Industrial Zone), d. 1. In order to participate, you need to send a signed NDA (attached) and a completed Participant Questionnaire.Collapse
Lots:
Lot No. 1
Construction of a new warehouse / production building with a separate boiler room
Comments: Our company is planning to build a new warehouse / production building with a separate boiler room.
- The building of the building has the following characteristics:
The building area is 4040 m2. 1-4 floors. The total area of the building is 11027 m2
The building is built on monolithic foundations of the grillage type. The frame is mainly made of prefabricated w / b, monolithic w / b floor slabs and a floor plate with an epoxy coating finish. Enclosing structures – sandwich panels of 150 mm . The roof is ventilated, soft on a profiled sheet with mineral wool insulation and waterproofing with a rubber-bitumen carpet. Window blocks are mainly made of aluminum profile in an easily resettable design.
The scope also includes engineering systems of the building , power supply, heating, ventilation, air conditioning, fire protection systems, water supply and sewerage.
- Boiler house building: Built-up area of 400 m2. 1-2 floors. The steel frame of the building on monolithic foundations. Enclosing structures -sandwich panels. The roof is soft.
- The general contract includes preparatory work, earthworks, landscaping work on the territory of 10,000 m2. The device of external networks of NVK, fire-fighting water supply. The construction of a pipe bridge/pedestrian gallery.
- The project documentation (stage P) is carried out by the General Contractor
- construction is scheduled to begin in August 2021 with completion in October 2022
Please send all questions regarding the content of the Questionnaire or the NDA to the following e-mail address - konstantin.petrunin@jdecoffee.com
Offers are accepted via the B2B-Center ETP.
You can get additional advice on the purchase by submitting a request in the"EXPLANATIONS" section
in the trading procedure.
For all questions about participation in this trading procedure, please contact the specialists of the B2Bcenter: tel.: (495) 989-85-19 ext.7610, 7620.
This trading procedure is not an auction or a tender, it does not fall under the
articles 447-449 of the Civil Code of the Russian Federation and does not entail the occurrence of legal obligations for the Customer to
choosing a supplier
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.