Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
Monthly, within 30 (thirty) bank days after delivery of the results provided that the work is done properly and within the agreed deadline. Work shall be deemed to have been completed after the Parties have signed the Work Acceptance Act (Form COP2) and the Certificate of Value and Costs (Form COP3).
Delivery terms:
1. EPM - NEZ JSC application
2. Place of work: Customer's territory (EPM-NEZ JSC).
3. Object (technical device) Industrial periodical furnaces for haffitizing fired workpieces. Panel-frame furnaces are conventionally composed of 3 parts: systems of underground supply and exhaust ducts, monolithic w/w foundation with channels, grooves and notches, and an above ground part of 1 half on alternating current.
4. Purpose of the work:
Rebuilding the walls and the bottom.
5. List and scope of work performed:
1. Dismantling m3 13.11 m3 prefabricated elements
2. Disassembly of non-slag firework m3 10.97
3. Disassembly of slag refractory m3 25.61
4. Loading of garbage (containers) tn 95.23
5. Manual loading of garbage into containers tn 69.01
6. Disassembly of crystalized "goat" m3 3.45
7. Unloading of precast concrete tn 32.78
8. Removal of speckled and nakar m3 2,00
9. Installation of m3 13.11 m3 prefabricated
10. Masonry category 2 walls of straight solid chamotets m3 36.58
11. Silicate coloring with non-stick formulations 100 m2 0.56
12. Applications: Technical documentation (drawings) - damn. PH 07334 SAT.
13. Performer Requirement:
13.1. Repair of the 1st Section Furnace No.3 (Achesonaa) of Section 8 of the TSE, with the design position and reinforcement of the SCP and UPPs. — from Customer material
13.2. Working in an operating enterprise. The operation of the enterprise is 24/7.
13.3. Possible exposure to harmful factors: dust, gas
13.4. Development of PPR and process maps for all necessary work.
13.5. The contractor must have the necessary production and human skills
resources to do the job. Have supervisor, IT and workers' certification
industrial safety, copies of documents confirming the contracting
Occupational Health Service Organizations and/or Occupational Safety Specialist (Order
destination
for a position in a contracting organization, occupational safety certification) or
having a contract with an accredited organization in the area of occupational safety services
also having medical clearance
13.6. The availability of SRO for these types of work.
13.7. The availability of machines and mechanisms to carry out the whole range of work.
13.8. The Performer's personnel must have and use personal protective equipment.
13.9. In case of comments to staff on the quality of the work performed, the violation of equipment
security, as well as administrative violations, upon request
Customer's specialists The Contractor is obliged to replace these workers immediately.
13.10. Performed works of poor quality must be redone at the expense of the Contractor and handed over
The customer.
13.11. Employed workers are placed for this work by the Contractor.
The customer, if available, may place workers on the Contractual
basis.
13.12. Development and approval of line schedules for furnace repair.
13.13. Contractor Manager is obliged prior to commencement of work under contract
submit an appeal (in two copies) containing a roll - call list of personnel,
which is intended to carry out the work under the contract. To the referenced
copies of civil passports and employment contracts (or contracts) must be attached
civil law), prisoners with the persons in question. Specified
copies of documents must be signed by the contractor's supervisor certified
by printing.
One copy of the submitted address, together with the attached documents, is transmitted to
the address of the security director. Second copy of the treatment attached
documents are sent to the head of the unit initiating the contract
contracting.
If the contractor does not have the above mentioned in the first paragraph of this
paragraph of reference or annexed documents, and in case of discrepancy
of a list with the contractor's request for the issuance of passes, the employee passes for the specified
organizations are not formalized. Overdue work falls on the contractor's fault. TO
if there is a need to replace the employees referred to in the application,
the contractor submits a refined list with the corresponding appendix
documents.
Based on the results of the work under the contracts, the contractor, together with the KS-2 act, provides the customer (the head of the contracting initiator unit) with copies of the report of the Form SZV-M" Information on insured persons" and positive entry control protocol on the transfer of said report to the territorial authority of the Pension Fund of Russia, signed by the EPC, for the period of time which is set out in its submission of Form CC - 2.
In the event of failure to provide the NW-M reports, or a discrepancy less than the number of contractor's employees indicated in them with the number in circulation, the customer (supervisor) units initiating the contract) are not signed, and the parties to the contract acknowledge that the contractor has not performed the work, and the work under these acts is not payable.
13.14. To prevent the spread of coronavirus infection (2019-nCoV)
Contractor/Subcontractor and its employees are required to comply on the Customer's premises
"mask mode", i.e. use personal respiratory protection equipment. UNTO
personal protective equipment includes: disposable medical masks, respirators,
reusable masks made of woven materials. Personal Protective Equipment
should cover both nose and mouth.
In case of violations of the "mask regime" of workers
Contractor/Subcontractor on Customer's premises, Contractor/Subcontractor is liable to pay
The customer is fined 25,000 (twenty-five thousand) rubles for each case detected
on the basis of the Act on the Violation of the "Maso Regime", drawn up by the Commissioner
Customer's face. The penalty shall be paid on the invoice within 5 days from
at the time of receipt, or by withholding money from the amount to be paid to the Contractor for the work performed.
14. Payment Terms: Monthly, within 30 (thirty) bank days after delivery
as long as the work is done properly and within the agreed time frame. Work shall be deemed to have been completed after the Parties have signed the Work Acceptance Act (Form COP2) and the Certificate of Value and Costs (Form COP3).
15. Work dates: 10.11.2021 — 30.11.2021 (20 working days). The commencement of work is agreed with the Customer in addition.
16. Warranty for work performed: 24 months from completion of the work, for each of the facilities under repair.
17. The equipment is transferred for repair and reception in accordance with EPM-NEZ JSC's approved REGULATIONS.
18. The furnace is repaired in an operating workshop. The repair schedule is agreed with the workshop (CGE) and the plant services (UM, EE).
19. The list of documents provided to OTPB by eGOICs for the processing of work permits by contractors:
Prior to the work permit, the Contractor is obliged to provide
The customer has the following documents:
1. copy of the certificate (SRO) for the right to perform this type of work;
2. copies of documents confirming the contracting organization's service
occupational health and/or occupational health officer (appointment order
contracting organization, occupational safety certification) or
contracts with an accredited organization in the area of occupational safety services;
3. a copy of the occupational health briefing from the Instructions Journal
4. ERP or PPR or RTI;
5. a copy of the workers' certification report on occupational safety;
6. copies of ITR certification certificates for occupational safety and general requirements
industrial safety. When performing gas work, on receptacles operating
pressurized, using GPM, electrical installations, fire
7. copies of certificates for each type of work;
8. medical clearance of staff;
9. copies of the certificates of electric gas welders, slingers, crane operators,
lifts (towers). For gas-electric welders, copies of certification reports
PTM.
Contractor shall notify the Customer in writing of all specified conditions
form with all supporting documents attached. Failure to comply
of this paragraph, the Contractor entitles the Customer to prevent Contractor from
work, overdue work in such a case is the fault
Contractor.
14. Note:
- Delivery of material from EPM-NEZ JSC warehouses to the place of work, removal of garbage (non-slathered refractory bricks, graphite, scrap metal, etc.) to storage sites located at EPM-NEZ JSC is carried out by the Contractor's transport.
- Garbage collection of all categories, to industrial waste reception sites located outside EPM-NEZ JSC (garbage collection from 7 km to 30 km.) is carried out by transport provided by the Customer, upon the Contractor's prior request.
- Disposal costs for all categories of waste, industrial waste disposal sites,
located outside EPM-NEZ JSC is at the Client's expense.
- Bridge cranes for furnace operations are provided by Customer, bridge machinist
the crane is provided by the Contractor.
- Work in a working shop. It is forbidden to carry out repairs on the stove if near
the standing oven is in company (the process of graphitation of the blanks) plus eight hours after
end of the company next to the standing furnace.
- When you place a commercial offer on the B2B trading platform for shipping
estimates are required.
Georeferencing:
Russia, Rostov region,
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.