Execution of a complex of construction, installation and commissioning works for the reconstruction of engineering systems of ITP, UTE, ATM and a water measuring unit.
- Water measuring unit: Installation of a unit with a water meter DN80 (Pulsar...
Execution of a complex of construction, installation and commissioning works for the reconstruction of engineering systems of ITP, UTE, ATM and a water measuring unit.
- Water measuring unit: Installation of a unit with a water meter DN80 (Pulsar T), a bypass line Dn200 and an electric gate. Section DMN 1902-25/1-VK1.
- Water fire extinguishing pumping station: Installation and strapping of the finished ANTARUS 2 MLH20-1/3-II/DS1-GPRS fire extinguishing system (2 pumps, N = 1.1 kW), pressure/suction pipelines Dn100 and related fittings. Section DMN 1902-25/1-VK2
- Thermal and mechanical solutions (ITP): Installation of blocks of plate heat exchangers Ridan (8 pcs.), circulation pumps (16 pcs. with a capacity of 1.5 to 3 kW), regulating, shut-off, safety valves and expansion tanks. Section DMN 1902-25/1-TM
- Heat energy metering unit (UTE): Installation of the electromagnetic heat meter "VIS.T3 TC" based on the PPR DN100, KTPTR-01 thermal converters, MT-100M pressure sensors, Zenner Dn20 make-up counter, as well as bypass and potential equalization devices. Section DMN 1902-25/1-UUTE.
- Electromechanical part and Automation: Installation of the ITP automation cabinet and control cabinets for pump groups, laying of cable lines (VVGng(A)-HF, VVGng-FRHF, PUGV) in perforated trays and corrugation, installation of a protective grounding circuit with a steel strip 40x4 mm, installation of a network of working and emergency lighting. Sections DMN 1902-25/1-EM and DMN 1902-25/1-ATM Execution of a complex of construction, installation and commissioning works for the reconstruction of engineering systems of ITP, UTE, ATM and a water measuring unit.Collapse
Организатор указал предполагаемую дату подведения итогов. Если в процедуре не будут подведены итоги при наступлении этой даты, то участники могут запросить их самостоятельно
Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:
step-by-step payment, 30% advance%
Delivery terms:
The Customer, on his own and at his own expense, acquires, delivers to the facility and transfers to the Contractor all the basic materials
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Additional fields
Terms of participation
To view the terms of participation, please get registered