Execution of construction and installation works of objects of JSC "GOK "Inaglinsky":
1. Ordinary coal pit No. 2 (2.5.5);
2. Conveyor gallery from the pit of ordinary coal No. 2 to the transshipment building No. 1 (2.12.3);
3. Overload Building...
Execution of construction and installation works of objects of JSC "GOK "Inaglinsky":
1. Ordinary coal pit No. 2 (2.5.5);
2. Conveyor gallery from the pit of ordinary coal No. 2 to the transshipment building No. 1 (2.12.3);
3. Overload Building No. 1 (2.12.4);
4. Conveyor gallery from overload No. 1 to rock bunker No. 2 (2.12.5);
5. Compressor container block No. 2 (2.5.7);
6.Corridor, conveyor gallery from main building No. 2 to main building No. 1 (2.10.3);
7. Conveyor gallery from the main building No. 2 to the rock bunker No. 2 (2.11.2);
8. Rock bunker No. 2 with capacity of 1000 tons (2.12.2);
9. Conveyor gallery from the pit of ordinary coals No. 2 to the main building No. 2 (2.6.4);
10. Main Building No. 2 (2.10.2);
11. Main Building No. 1 (2.10.1);
12. Gallery from the main building No. 2 to the kek loading building (2.24.2);
13. R31650-00-TC thermal networks", "External networks of fire and household drinking water supply from the PPNS to the Main building No. 1 of Inaglinskaya-2 and NV1 water supply networks", "R31650-00-NC external sewerage networks. On-site engineering networks. Electric heating of pipelines of external network of sewerage R31650-00-OE.NK;
14. Warm transitions № 1, № 5, № 4, № 6, № 7;
15. On-site engineering networks: Outdoor electric lighting R31650-00-EN, Communication networks R31650-00-SS, Complex automation R31650-00-AK, Video surveillance R31650-00-VN;
16. Overpasses of engineering systems R31650-AIS-AS2, On-site networks, Power supply networks R31650-00-ES;
17. PS 6/0.4kV coal preparation No. 2 (3.16).
(Bid 5) Execution of construction and installation works of objects of JSC "GOK "Inaglinsky".Collapse
Организатор указал предполагаемую дату подведения итогов. Если в процедуре не будут подведены итоги при наступлении этой даты, то участники могут запросить их самостоятельно
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
Priority payment terms: within 60 calendar days from the date of signing the certificates of completed works / services rendered (or your option).
Delivery terms:
In accordance with the terms of reference and working documentation
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.