Execution of works on technical re-equipment of the boiler house with an installed capacity of 12.3 MW at the facility: "Mining processing enterprise based on the gold deposit "Nasedkino". Reconstruction. The output capacity is 1.9 million tons per year."
1. Dismantling of equipment.
2. Installation of two boilers KVm-3.5KB with a total capacity of 7 MW, thermal mechanical equipment of the boiler, plate heat exchangers, pumping equipment, shut-off valves, ball valves, etc.
3. Installation of instrumentation and control equipment, electrical equipment.
4. Commissioning.
5. The device of additional openings for screw conveyors (according to RD, code BAMZ-68/22-KZ).
Performance of works on technical re-equipment of the boiler house with an installed capacity of 12.3 MW (SMR)
Выполнение работ по техническому перевооружению котельной установленной мощностью 12,3 МВт на объекте: «Горноперерабатывающее предприятие на базе золоторудного месторождения «Наседкино». Реконструкция. Выход на производительность 1.9 млн тонн в год». 1. Демонтаж оборудования. 2. Монтаж двух котлов КВм-3,5КБ общей мощностью 7МВт, тепломеханического оборудования котла, пластинчатых теплообменников, насосного оборудования, запорной арматуры, шаровых кранов и др. 3. Монтаж оборудования КИПиА, электрооборудования. 4. Проведение пусконаладочных работ. 5. Устройство дополнительных проемов под шнековые транспортеры (согласно РД, шифр БЭМЗ-68/22-КЖ). Выполнение работ по техническому перевооружению котельной установленной мощностью 12,3 МВт (СМР)